2015-05-26 Meeting Report (Granite Office Building)
SPIN MEETING REPORT
Case Number:
ZA15-016
Project Name:
Granite Place Office Building
SPIN Neighborhood:
8
Meeting Date:
May 26, 2015
Meeting Location:
City Council Chambers
Total Attendance:
43
Host:
David Alexander Attending:
Applicant(s) Presenting:
Frank Bliss, Cooper and Stebbins, L.P./ SLTS Land L.P., phone: 817-310-
0825 email: fbliss@southlaketownsquare.com and David Cunningham,
Granite Properties phone: 214-621-5501 email:
dcunningham@graniteprop.com
City Staff Present:
Patty Moos, Planner I
City Staff Contact:
Daniel Cortez, Principal Planner 817-748-8070
Town Hall Forums can be viewed in their entirety by visiting http://www.cityofsouthlake.com Learn
More; forums are listed under SPIN by meeting date.
SUMMARY:
Proposed office building for Phase I in Southlake Town Square located along SH114
All
building phases are proposed to take place in 3-5 years
Fully developed plan includes 2 office buildings, 4 restaurants and 2 parking structures
Site Plan for first office building is 154,000 sf rentable office space with parking garage
Architectural style will blend with Town Square architecture and new architecture of
glass and brick, less glass and typical office towers
Structured parking will require a Specific Use Permit and variances in keeping with the
building design and architectural enhancement and landscape plan
Reserve Street will be realigned east to Division Street and will take place in Phase I
Variances:
Proposed building height is 94 ft. and will require a variance to the building height
R
(90 ft.) to allow a higher first floor elevation for an impressive lobby area
A trail is required along SH114 frontage and a variance will be requested to
R
realign it into Town Square on Division Street
Only 1 loading area where 2 loading areas are required
R
Variance to the stacking depth in the parking lot
R
The Landscape will be consistent with the Town Square landscaping and will be
enhanced along Reserve Street heavily landscaped. Lighting will be consistent with
Town Square
Presentation
QUESTIONS / CONCERNS:
No questions.
Presentation started at 6:05 pm and ended at 6:30 pm
SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official
meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and
the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are
strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council.