Loading...
Item 7CCITY OF SOUTHLAKE Department of Planning & Development Services STAFF REPORT May 12, 2015 CASE NO: ZA15-032 PROJECT: Zoning Change & Site Plan for Kimball Park (Cambria Hotel and Suites) EXECUTIVE SUMMARY: Fillmore Hospitality is requesting approval of a Zoning Change and Site Plan from S-P- 2 Generalized Site Plan District to S-P-2 Generalized Site Plan District for Cambria Hotel and Suites at Kimball Park on property described as Tracts 3A1A and 3A2A, Thomas Mahan Survey, Abstract No. 1049, City of Southlake, Tarrant County, Texas and located at 400 and 470 N. Kimball Ave., Southlake, Texas. Current Zoning: S-P-2 Generalized Site Plan District. Requested Zoning: S-P-2 Generalized Site Plan District. SPIN Neighborhood # 4. REQUEST DETAILS: The applicant it requesting approval of a Zoning Change and Site Plan from S-P-2 Generalized Site Plan District to S-P-2 Generalized Site Plan District for the Cambria Hotel and Suites at Kimball Park to revise the previously approved Zoning and Site Plan primarily with regard to the exterior elevations, building footprint and the layout of the ground floor and pool area. Some minor changes to the parking lot landscape islands are also proposed. A Site Plan for the Cambria Hotel and Suites was approved March 4, 2014 in conjunction with a Zoning Change and Concept Plan for the Kimball Park development, which includes the four-story, 175 room Cambria Hotel and Suites, a three-story, 96,000 square foot office building, restaurant, coffee shop and retail uses, and one open space lot on approximately 15.5 acres. No changes are proposed to the remainder of the Kimball Park development. The only changes proposed are to Lot 1 of the development, which is the hotel site. A summary of the proposed changes is below: • The floor area of the hotel is 111,897 square feet instead of 118,315 square feet. • The windows are reconfigured with louvers added for VTAC units. • The entry tower feature is squared off with the east and south facades instead of being angled. • An accent band of brick and metal above the first floor has been removed. • The canopy at the hotel entrance is a clear polycarbonate clad canopy instead of a metal clad canopy. • The height of the hotel lobby is a single height instead of a double height. Case No. ZA15-032 • The height of the primary parapet is 51'-0" instead of 47'-5" and the height to the top of the tower structure is 59'-4" instead of 59'-3". • The layout of the ground floor and pool area have been reconfigured (please see the chart below with the area comparisons). • Required parking for the hotel is 211 spaces instead of 206 spaces due to the increase in meeting space. • Some of the parking lot landscaping on the west side of the hotel has been revised and the dumpster enclosure has been squared off with the property line. A summary of the changes to the ground floor and patio/pool areas by use is below: Use Previously approved S-P-2 (s.f.) Proposed S-P-2 (s.f.) Building Footprint 31,840 29,514 Conference Center 8,380 8,738 Dining/Lounge Space 1,900 2,700 Total Meeting Space Ballroom Board Room Break -Out Meeting 5,076 4,320 288 468 5,079 4,116 507 456 Fitness Center 1,995 1,061 Kitchen 1,200 920 Patio/Pool Area 6,250 8,250 Pool Area 452 469 The Planning and Zoning Commission recommended approval of the item at their April 23, 2015 meeting with the following stipulations: P & Z Motion Applicant's Response Meet with Commissioner Springer to explore The applicant's engineer is meeting with alternate options to the louver window issue Commissioner Springer. and cooling towers. Prepare renderings of the lobby showing the Renderings of the two lobby heights are approved two story height versus the twelve being prepared and they will be presented foot height that is being proposed. at the May 19t" Council meeting. Match the proposed canopy at the front of the Revised renderings of the proposed canopy hotel with the canopy at the conference center at the conference center entrance have entrance. been submitted and are included in the packet binder. ACTION NEEDED: Consider 1st reading approval of a Zoning Change and Site Plan ATTACHMENTS: (A) Background Information (B) Vicinity Map (C) SPIN Meeting Reports dated April 28, 2015 and January 6, 2014 (D) Plans and Support Information — Link to PowerPoint Presentation (E) Site Plan Review Summary No. 1, dated April 16, 2015 (F) Surrounding Property Owners Map and Responses (G) Ordinance No. 480-657a (H) Full Size Plans (for Commission and Council Members Only) STAFF CONTACT: Ken Baker Richard Schell (817) 748-8067 (817) 748-8602 Case No. ZA15-032 BACKGROUND INFORMATION OWNER/APPLICANT: Fillmore Hospitality PROPERTY DESCRIPTION: Tracts 3A1A and 3A2A, Thomas Mahan Survey, Abstract No. 1049 wetkIBIL ��*•7el1*1•1:v •►TA1EwgILI= CURRENT ZONING: "S-P-2" Generalized Site Plan District REQUESTED ZONING: "S-P-2" Generalized Site Plan District HISTORY: - A Zoning Change and Concept/Site Plan (ZA12-067) from 1-1" Light Industrial District to "S-P-2" Generalized Site Plan District for Victory Lane was approved by City Council on September 4, 2012. - A Zoning Change and Concept/Site Plan (ZA13-135) from ""S-P-2" Generalized Site Plan District to "S-P-2" Generalized Site Plan District for Kimball Park was approved by City Council on March 4, 2014. - A Preliminary Plat (ZA13-136) for Kimball Park was approved by City Council on March 4, 2014. - A Final Plat for Kimball Park was approved by the Planning and Zoning Commission on May 8, 2014. TRANSPORTATION ASSESSMENT: Traffic Impact The trip generation calculations in the Traffic Impact Analysis that was submitted for the Kimball Park development are not affected by the proposed changes to the hotel, so an updated TIA is not required for this case. TREE PRESERVATION: No changes to the approved Tree Conservation Plan are proposed with this request. CITIZEN INPUT/ BOARD REVIEW: A SPIN meeting for the proposed changes is was held April 28, 2015. The SPIN report for that meeting is attached in Attachment C of this report. A SPIN meeting for the entire Kimball Park project was held January 6, 2014. A summary of that meeting is also included in Attachment C. PLANNING AND ZONING COMMISSION ACTION: April 23, 2015; Approved (5-0) subject to Site Plan Review Summary No. 1, dated April 16, 2015, subject to the staff report dated April 17, 2015, approving each of the proposed changes as presented; noting for the record the applicant's willingness to get with Commissioner Springer to explore alternate options to the louver window issue and cooling towers; also noting the applicant's willingness prior to coming to Council to prepare a rendering of the entryway so they can see the difference between the approved two story height versus the twelve foot height that is being proposed and also noting the applicant's willingness to try to match the proposed entry feature at the front of the hotel with the entry at the conference center entrance. Case No. Attachment A ZA15-032 Page 1 CITY COUNCIL ACTION: May 5, 2015; Tabled on consent (5-0) at 1st reading to the May 19, 2015 Council meeting. STAFF COMMENTS: Attached is Site Plan Review Summary No. 1, dated April 16, 2015. The Planning and Zoning Commission and City Council motions from the original approval are included below for reference: Previous Planning and Zoning Commission motion: January 9, 2014; Tabled to the January 23, 2014 P&Z meeting. January 23, 2014; Tabled to the February 6, 2014 P&Z meeting. February 6, 2014; Approved (5-0) subject to Revised Concept/Site Plan Review Summary No. 2 and Staff Report dated January 31, 2014, approving the two variances requested: 1) The driveways do not meet the minimum required stacking depth of 150'. Approximately 17.6' of stacking depth is shown on the N. Kimball Ave. driveway and 34.2' of stacking depth is shown on the S.H. 114 driveway and 2) Subdivision Ordinance No. 483, Section 8.01(A), as amended, requires that every lot front on a public or a private street. A variance is requested to allow the lots to be configured as shown on the Concept Plan and noting the applicants willingness to address the following: 1) the entrance to the hotel on the southeast corner of the hotel, 2) the parking and landscaping on the east side of the hotel 3) the design and layout of the retail/restaurant component around the circle with the potential for patio space on the southern side of the building as well as the northern side, 4) clarify renderings of the hotel 5) refine the renderings to more closely resemble the materials anticipated being used, 6) place the fountain in the renderings and 7) add pedestrian access from the hotel to the green space on the southeast portion of the lot. Previous City Council motions: February 18, 2014; Approved at 1st reading (6-1) subject to the following stipulations: approval of requested variances —driveway stacking depth and Subdivision Ordinance regarding the public and private street access that will be configured as shown on the concept plan; concept plan review summary No. 3, dated February 11, 2014; understanding that applicant must come forward before the second reading with the following matters to be appropriately detailed and discussed (1) detailed entry feature on front southeast corner of the hotel, which may include fountains, landscape islands and detailed renderings of such, (2) regarding Lot 6, a detailed landscape plan showing how that can be incorporated with the federal requirements to not disturb the floodway, (3) discussion of the property owners agreement and how that may work regarding the project, (4) detailed floor plans, more specifically the first floor and within that floor plan a detail of the outdoor public spaces and how those will be incorporated into the hotel, (5) also regarding Lot 6, noting what can be manicured to the extent to provide for periodic maintenance within the floodway in connection with Lot 6 landscape detail and provide detailed plant material for entire project, and (6) detailed renderings for convention center from the Kimball approach which would also include traffic circle. Case No. Attachment A ZA15-032 Page 2 March 4, 2014; Approved at 2nd reading (6-1) pursuant to the following: revised concept plan review summary No. 3, dated February 26, 2014; approving requested variances —driveway and minimum required stacking and Subdivision Ordinance 483, Section 8.01(A), as amended, which requires every lot to be on a public or private street and as requested to allow the lots to be configured as shown on the revised concept plan; also noting the requirements under this motion are pursuant to: (1) the revised renderings that were presented to Council this evening; (2) the Declaration of Covenants, Restrictions, and easements (CCR) as presented to Council in the application this evening; (3) the revised landscape plan presented to Council; (4) the revised permitted uses, as presented from Adams Engineering in their letter dated March 4, 2014, noting that the drive -through service will only be allowed for Lot 4; (5) also noting the balance of the concept plan for the buildings that are not included in this site plan approval that it is Council's expectation there will be 100% masonry construction; (6) the permitted uses represented from Adams Engineering that the food service hours of operations as noted in the application that "they will close no later than 11:00 p.m." that it is Council's intention to have wording that mentions that it will be "no earlier than 11:00 p.m.; (7) the office building in the concept plan will be a four story construction and that additional parking will be presented on the first level underneath the building; (8) and pursuant to the revised concept/site plan as presented this evening. Case No. Attachment A ZA15-032 Page 3 Vicinity Map Cambria Suites co W 2244 223> a Jry`1Ro ry 223 m 2001 J ry Qa �m 220022 c� 2208, m 241 2 2201 2205 209 21 a 0 0 0 ^ryM ryh � 0 24 Sao 516 ROLLING CN o m 504 250 O d � O � O N J P O � O v � O A n liQ � v I� 'm 1750 N v � v � 0 N 414 v nA v v v 910 o v v 0 v vv } a 0 19gp 1980 2000 w x 'o z U 2100 2118 2120 215D m •� �� u 0 m rAaS"•�' Q 2300 2354 m 114 0 11 � �w w Mo (7w 2110 s � N r'rn j ry 2120 250 270 N N w — E S ZA15-032 Zoning Change and Site Plan 0 500 1,000 2,000 Feet Case No. ZA15-032 Attachment B Page 1 JUSOUTHLAKE SPIN MEETING REPORT Case Number: ZA15-032 SPIN Item Number: SPIN2015-11 Project Name: Cambria Suites Hotel SPIN Neighborhood: SPIN #4 Meeting Date: April 28, 2015 Meeting Location: 1400 Main Street, Southlake, TX City Council Chambers Total Attendance: 21 Host: Sherry Berman, Community Engagement Committee Applicant(s) Presenting: Kevin Schoolcraft, Fillmore Hospitality City Staff Present: Jerod Potts, Planner I; Shannon Hamons, Director of Economic Development and Tourism City Staff Contact: Richard Schell, Principal Planner Town Hall Forums can be viewed in their entirety by visiting hftp:/Avww.cityofsouthlake.com and clicking on "Learn More" under Video On Demand; forums are listed under SPIN by meeting date. FORUM SUMMARY Property Situation: Kimball Park (SH 114 and Kimball) Development Details: The Cambria was previously approved through Planning and Zoning and City Council Presenter noted the drawings have been completed and submitted for permits, and staff had identified some changes or modifications to what was previously approved, and required the applicant to go through the P&Z and City Council process Presenter mentioned they tried to maintain the original concept through the changes but staff did note some changes. Some of the changes presented by the applicant from the originally approved site plan and the item currently moving through the development process include: o Different view of the conference center entrance o Pool and amenity area has increased in size to create a larger feel o Metal banding on the exterior of the hotel was removed and moved to spandrel glass o Spandrel glass windows used, not metal spandrel Case No. Attachment C ZA15-032 Page 1 o Green space was moved closer to the hotel to take advantage of more trees to screen the pool amenity, which may be changed depending ❑n what City Council wants the applicant to do with it o Removed the mullions on the guest room windows (As indicated on original plan) o Front canopy was originally designed without considering the wind loads, so it was redesigned to be more structurally sound — presenter noted that P&Z asked if the awnings on the conference space could match this look c The main entry tower in the original rendering was angled, and now the tower has been straightened and squared off — presenter noted that the original look was based on an older Cambria prototype. Presenter noted that there are luxury suites from the second floor up that occupy the entire tower space o Louvers for the VTAC were not previously indicated on the original rendering o The original plans referenced EIFS, when it is actually a 3-coat stucco system o Conference space increased in square feet o Meeting rooms were ❑riginally 5,100 square feet and they are at 5,079 square feet Kitchen decreased in square feet from the original plan — presenter noted they are adding a satellite kitchen/pantry area in the conference space to serve the conference guests c The board room increased in square feet from the original plan o Breakout room decreased in square feet from the original plan — presenter noted the square feet shifted to the board room o The fitness center decreased in square feet from the original plan — presenter discussed the change in layout from the original plan to the item being presented o The tower interior ceiling height was originally two stories — this has been changed to one story and a luxury suite was added to the tower Presented at SPIN: Case No. Attachment C ZA15-032 Page 2 T SE%ECURVESUPAWRY ANDOn MATERALS3RrvERED'NCORNECFO MREWITHA9E PROPRIETARY TO FILLMORE HOSPIM tt.L:C. rl-ESEWTEFIALSHAVE all PROVIDED IN CONFIDENCE WITH THE UNDERSTANDING FHAT MF RECIPIENT wll NOT DISCLOSE COPY DISSEMINATE DISTPoRNTF OR USE THE. INPORLMTION SFT FORTH HFRFIN OTNER THAN FOR THE INFFNi5F'D PURPOSE IF TWIT IS NOT TFE CASE, YOU SHOULD PRro V o7i RETURN TEAS DOCUGIENT AID THE ACCOMFYNYNuG MATERIALS TO'ILLADRE HOSPITAU" LLC. IF YOU HAVE RECEIVED TMSDOCLNFNT IN ERROR. PLEASE mi F1LLMURE F10MIALITY. LLC IMAEOnTELY FOR RETURN INSMUCRONS.DO 1WERY—Ore: APa?a?O15 nin-r ul niminaum. The Information n this doaanent is furnished on a confidential basis exclusively for your use and retention and, by acceping thus docurrent, you agree not to transank reproduce or make available to an other person (other than your Segal, to, accounting and other advisers) all or any part of this document without the express written Munnissionof Fillmore Hospitality, LLC ("FM). This dpcurrentis protected by copyrghtof FH and tai lavhs, all rights reserved. Fnniiene Laskin c_Fatnnenfe and Proleeted Prmem and Manaeenni Results This doarmerat curt ins forward -looking staterents based on FHs experience and expectations about the markets in which it Invests and assets it manages and the methods by which FH expects to invest and manage in those markets Those statements are eonwtimee irdicatad by vwrda such ae'expectn"'beievee,' beelro."'may, 'intenoe."'oftonr ,' %,ilr and Fimilar expresaiona. Such forYaerd-kokirg alummu ta, includng IlR'a analysis and projections regarding property and management operating and investment results are not guaranties of future performance and are subject to many risks, uncertainties and assumptions Mat are III to predict Therefore, actual operating pedoTnance and returns could deter maternally and aversely from Nose expresses or implied n any forward -looking statements as a resut of various factors FH undertakes no obligation to mYise or update any forward-Irokin o stau ni for any reason. FH's expected results and projections are p—ded for informeaon regarding the FH's investment and management analysis, not as any guarantee or elpeclation of operating pedornrance end iwouIl rent result, fOr the Funds investment portoio. Case No. Attachment C ZA15-032 Page 3 FITS / v 4 - l CONF"NML-Falnu P­%O1 y CPAABRIA Washmg[On, DC _ + y •I • Invites you to hang out Convenient options obi.. A few things done well j A Sense of spaciousness Thoughtful efficiency Stylish, yet warm and • comfortable Choiceful, relevant pre -arrival •• • •.•• Feels like an upgrade communication CPMBRIA I Cbelsop, NY Amazing first impression Technologically smart Choice Privileges front and center Integrated, mixed use space Interesting seating choices and:,^ options Technologically smart { �'XI CONFIDENn&.Fa In dP­01r 3 Cart Rendming -1429 _ Cambria offers Prior Reedeney Upscale, modern, inviting design; Options for guests to personalize their stay; •' Unexpected service delighters; and a Loyalty program with opportunities to earn more immediate rewards. cou.oF�nu - fa irrr.+ee v.n.. n.y ��.. _'1/ s c..r ,-e arid., q �' ��• wit �i ArA II Prior Reneerg r s Exterior Planning Issues Poo!/Amenity Area Concern that pool and amenity area was reduced from original submittal Metal Band • Concorn that motal bond vros romovod from Original plan Spandrel on Windows Concern that window area on every floor was replaced with metal spandrel Rear Parking Green Space Concern that a green space in rear parking lot had been removed Guest Room Windows • Concern that windows were "split' with too many mullions Front Canopy Angle • Concern that front canopy angleldesign had changed Entry Tower Angle • Concern that Entry Tower angle had been changed Louvers for VTAC • Concern that louvers were not on original concept drawng EFTS vs Stucco • Concern that plans show EFIS rather than approved Stucco Pool/Amenity Area • Both pool and patio have actually increased in size • Original pool design was 452sf — new design is 469sf • Original patio area was 6,250sf — new design is 8,250sf • The metal band was removed and replaced with spandrel glass to croato a cloanor, slookor look to those sections • Actually. spandrel glass •nos used — not metal spandrel — so it will look the same, but hide the necessary structural elements with opaque glass Green space was moved closer to the building, but we can return it to original approval location d necessary Moved to improve civil design. landscape and runoff • We have moved the furniture off the wall and removed the mullion Change was done to create more visually appealing and structurally sound design • This was done to update design to Cambria 2.0 prototype (old Cambria 1.4 prototype had angled design — Plano version is old design) • It was always intended to do upgraded VTAC units rather than PTAC units, and this was discussed during original presentation • VVe have designed the louver as part of window configuration to minimize visual impact and create clean look • Term EFIS vras an error on plans — it will be a 3-coat system per the original approvals Case No. ZA15-032 Attachment C Page 6 Pool/Amenity Area Exterior Plannina Issues Pool/Amenity Ana • Concern that pool and amenity area was reduced from original submittal Metal Band • Concern that metal band vas romovod from Original plan Spandrel on Windows Concern that window area on every floor was replaced with metal spandrel Rear Parking Green Space • Concern that a green space in rear parking lot had been removed Guest Room Windows • Concern that windows were "split' with too many mullions Front Canopy Angle • Concern that front canopy angle/design had changed Entry Tower Angle • Concern that Entry Tower angle had been changed Louvers for VTAC • Concern that louvers were not on original concept draving EFIS vs Stucco • Concern that plans show EFIS rather than approved Stucco • Both pool and patio have actually increased in size • Original pool design was 452sf — new design is 469sf • Original patio area was 6,250sf — new design is 8,251 The metal band was removed and replaced with spandrel glass to croato a cleaner, slookor look to those sections • Actually, spandrel glass eras used — not metal spandrel — so it will look the same, but hide the necessary structural elements with opaque glass • Green space was moved closer to the building, but we can return it to original approval location if necessary • Moved to improve civil design. landscape and runoff • We have moved the furniture offthe wall and removed the mullion • Changewas done to create more visually appealing and structurally sound design This was done to update design to Cambria 2.0 prototype (old Cambria 1.4 prototype had angled design — Plano versior is old design) • It was ahvays intended to do upgraded VTAC units ratherthan PTAC units, and this was discussed during original presentation • M have designed the louver as partof vnndow configuration to minimize visual impact and create clean look Term EFIS was an error on plans — itwill be a 3-coat system per the original approvals Case No. Attachment C ZA15-032 Page 7 Exterior Planning Issues M6. City of Southlake Plan Concerns Pool/Amenity Area Concern that pool and amenity area was reduced from original submittal Metal Band • Concern that metal band was removed from Original plan Spandrel on Windows Concern that window area on every floor was replaced with metal spandrel Rear Parking Green Space • Concern that a green space in rear parking lot had been removed Guest Room Windows • Concern that windows were "split' with too many mullions Front Canopy Angle • Concern that front canopy angleldesign had changed Entry Tower Angle • Concern that Entry Tower angle had been changed Louvers for VTAC • Concern that louvers were not on original concept dravring EFIS vs Stucco • Concem that plans show EFIS rather than approved Stucco • Both pool and pa lio have actually increased in size Original pool design was 452sf — nevi design is 469sf Original patio area was 6.250sf — new design is 8.250sf The metal band was removed and replaced vrith spandrel glass to create a cloanor, sleeker look to those sections • Actually. spandrel glass was used — not metal spandrel — so it will look the same, but hide the necessary structural elements_ with opaque glass Green space was moved closer to the building, but we can return it to original approval location If necessary • Moved to improve civil design, landscape and runoff • We have moved the furniture off the wrall and removed the mullion • Change was done to create more visually appealing and structurally sound design • This was done to update design to Cambria 2.0 prototype (old Cambria 1.4 prototype had angled design — Plano version is old design) • It was aWays intended to do upgraded VTAC units rather than PTAC units, and thiswas discussed during original presentation We have designed the louver aspartof vnndow configuration to minimize visual impact and create clean look • Term EFIS was an error on plans — it will be a 3-coat system per the original approvals Exterior Planning Issues City of Southlake Plan Concerns PoorlAmeniry Area Both pool and patio ha= eased in size Concern that pool and amenity area was reduced from Original pool design was 452sf — new design is 469sf original submittal Original patio area was 6,250sf — new design is 8,250sf Metal Band I The metal band was removed and replaced with spandrel • Concern that metal band vras removed from Original plan glass to create a cleaner, sleeker look to those sections Spandrel on Windows Concern that window area on every floor was replaced with metal spandrel Rear Parking Green Space • Concern that a green space in rear parking lot had been removed Guest Room Windows • Concern that windows were "split' Mth too many mullions Front Canopy Angle • Concern that front canopy angle/design had changed Entry Tower Angle Concern that Entry Tower angle had been changed Louvers for VTAC • Concern that louvers werenoton original concept drawing EFIS vs Stucco • Concern that plans show EFIS rather than approved Stucco • Actually, spandrel glass was used — not metal spandrel — so it will look the same, but hide the necessary structural elements with opaque glass • Green space was moved closer to the building, but we can return it to original approval location if necessary • Moved to improve civil design, landscape and runoff • We have moved the furniture off the wall and removed the mullion • Change was done to create more visually appealing and structurally sound design This was done to update design to Cambria 2.0 prototype (old Cambria 1.4 prototype had angled design — Plano version is old design) • It was aNvays intended to do upgraded VTAC units rather than PTAC units, and thisvms discussed during original presentation • We have designed the louver as part of vnndow configuration to minimize visual impact and create clean look • Term EFIS vas an error on plans — it will be a 3-coat system per the original approvals Case No. Attachment C ZA15-032 Page 8 Exterior Planning Issues Pool/Amenity A rea Concern that pool and original submittal Metal Band • Concern that metal band was romovod from Original plan Spandrel on Windows Concern that window area on every floor was replaced with metal spandrel Rear Parking Green Space • Concern that a green space in rear parking lot had been removed Guest Room Windows • Concern that windows were "split" with too many mullions Front Canopy Angle • Concern that front canopy angleldesign had changed Entry Tower Angle • Concern that Entry Tower angle had been changed Louvers for VTAC • Concern that louvers were not on original concept drawing EFIS vs Stucco • Concern that plans show EFIS rather than approved Stucco Exterior Plannina Issues Poef/Amenity Area Concern that pool and amenity area vas reduced from original submittal Metal Band • Concern that motel band was removed from Original plan Spandrel on Windows Concern that window area on every floor was replaced with metal spandrel Rear Parking Green Space • Concern that a green space in rear parking lot had been removed Guest Room Windows • Concern that windows were "split" with too many mullions Front Canopy Angle • Concern that front canopy angleldesign had changed Entry TowerAngle • Concern that Entry Tower angle had been changed Louvers for VTAC • Concern that louvers were not on original concept drawing EFIS vs Stucco • Concern that plans show EFTS rather than approved Stucco • Both pool and patio have actually increased in size Original pool design was 452sf — new design is 469sf • Original patio area was 6,250sf — new design is 8,250sf • The metal band was removed and replaced with spandrel glass to create a cleaner, sleeker look to those sections • Actually, spandrel glass vas used — not motal spandrel —so it will look the same, but hide the necessary structural elements with opaque glass • Green space was moved closer to the building, but we can return it to original approval location if necessary • Moved to improve civil design, landscape and runoff • We have moved the furniture off the wall and removed the mullion • Change was done to create more visually appealing and structurally sound design • This was done to update design to Cambria 2.0 prototype (old Cambria 1.4 prototype had angled design — Plano vemior is old design) • It was always intended to do upgraded VTAC units rather than PTAC units, and this was discussed during original presentation • We have designed the louver as part of vdndow, configuration to minimize visual impact and create clean look • Term EFIS vras an error on plans — it will be a 3-coat system per the original approvals 11 • Both pool and patio have actually Increased in size Original pool design was 452sf — newdesign is 469sf • Original patio area was 6,250sf — new design is 8,250sf The metal band was removed and replaced with spandrel glass to create a cleaner, sleeker look to those sections • Actually, spandrel glass was used — not metal spandrel — so it will look the same, but hide the necessary structural elements with opaque glass • Green space was moved closer to the building, but we can return it to original approval location if necessary • Moved to improve civil design, landscape and runoff • We have moved the furniture off the wall and removed the mullion • Change was done to create more visually appealing and structurally sound design This was done to update design to Cambria 2.0 prototype (old Cambria 1.4 prototype had angled design — Plano version is old design) • It was aMmys intended to do upgraded VTAC units rather than PTAC units, and this was discussed during original presentation • We have designed the louver as part of vundow configuration to minimize visual impact and create clean look • Term EFIS was an error on plans — it will be a 3-coat system per the original approvals Case No. Attachment C ZA15-032 Page 9 r �ww �--; COf*JDEN?7AL-FwlnWdP@ftSO* CONFJDEf4nAL-FwllWftdPsm 0-4y ILI w 15 Is Exterior Planning Issues Pool/Amenity Area Concern that pool and amenity area was reduced from original submittal Metal Band • Concern that metal band was removed from Original plan Spandrel on Windows • Concern that window area on every floor was replaced with metal spandrel Rear Parking Green Space Concern that a green space in rear parking lot had been removed Guest Room Windows • Concern that windows were "split' with too many mullions Front Canopy Angle • Concern that front canopy angleidesign had changed Entry Tower Angle • Concern that Entry Tower angle had been changed Louvers for VTAC • Concern that louvers were not on original concept drawing EFTS vs Stucco • Concern that plans show EFIS rather than approved Stucco Exterior Plannina Issues Pool/Amenlry Area Concern that pool and amenity area was reduced from original submittal Metal Band • Concorn that metal band vrus removed from Original plan Spandrel on Windows Concern that window area on every floor was replaced with metal spandrel Rear Parking Green Space Concern that a green space in rear parking lot had been removed Guest Room Windows • Concern that windows were "split" with too many mullions Front Canopy Angle • Concern that front canopy angleidesign had changed Entry Tower Angle • Concern that Entry Tower angle had been changed Louvers for VTAC • Concern that louvers were not on original concept drawing EFIS vs Stucco Concern that plans show EFIS rather than approved Stucco ] • Both pool and patio have actually Increased in size I Original pool design was 452sf — new design is 469sf • Original patio area vvas 6,250sf — new design is 8,250sf The metal band was removed and replaced with spandrel glass to create a cleaner, sleeker look to those sections • Actually, spandrel glass was used — not metal spandrel —so it will look the same, but hide the necessary structural elements with opaque glass • Green space was moved closer to the building, but we can return it to original approval location 9 necessary • Moved to improve civil design, landscape and runoff We have moved the furniture off the wall and removed the mullion Change was done to create more visually appealing and structurally sound design This was done to update design to Cambria 2.0 prototype (old Cambria 1 .4 prototype had angled design — Plano version is old design) • It was always intanded to do upgraded VTAC units rather than PTAC units, and this was discussed during original presentation • VVe have designed the louver as part of vrindow configuration to minimize visual impact and create clean look • Term EFTS vras an error on plans — itwill be a 3-coat system per the original approvals • Both pool and patio have actually increased in size Original pool design was 452sf — new design is 469sf Original patio area was 6,250sf — new design is 8,250sf The metal band was removed and replaced with spandrel glass to create a cleaner, sleeker look to those sections • Actually, spandrel glass was used — not metal spandrel — so it will look the same, but hide the necessary structural elements with opaque glass • Green space was moved closer to the building, but we can return it to original approval location if necessary Moved to improve civil design, landscape and runoff • VVe have moved the furniture off the wall and removed the mullion Change was done to create more visually appealing and structurally sound design • This was done to update design to Cambria 2.0 prototype (old Cambria 1.4 prototype had angled design — Plano version is old design) It was always intended to do upgraded VTAC units rather than PTAC units, and this was discussed during original presentation • VVe have designed the louver as part of window configuration to minimize visual impact and create clean look • Term EFIS was an error on plans — it will be a 3-coat system per the original approvals IV Case No. ZA15-032 Attachment C Page 11 �i All Ulf of n :fei CONFIDENn4L-Fa I,Wn dP.m.. Oty w6ilm WESTIN I Dallas, TX OOUBLETREE I Loverield TX i sn �t alu i4. • aar. 1 /M�. •rat .s a � n -aft. . 1 : ar - - .raat •. . .art 1 .rtq tr t//_ I .matt L .rat tMt..1 -a1 t trrt tY/tt t�rrs.. ■ n t ■ram• .�•st trrray. . •illy trim .HF PLTC'Dl � fa11 g TX t n t 1 DOIIBLETR EE CONFIDENAAL - Fa irWdod P. 04y Exterior Planning Issues City of Southlake Plan Concerns PoollAmenify area Concern that pool and amenity area was reduced from original submittal Metal Band • Concern that metal band was removed from Original plan Spandrel on Windows • Concern that window area on every floor was replaced wilh metal spandrel Rear Parking Green Space Concern that a green space in rear parking lot had been removed Guest Room Windows • Concern that windows were "split" with too many mrdlions Front Canopy Angle • Concern that front canopy angleldesign had changed Entry Tower Angle • Concern that Entry Tower angle had been changed Louvers for VTAC • Concern that louvers were not on original concept drawing EFTS vs Stucco • Concern that plans show EFIS rather than approved Stucco Exterior Planning Issues ,-City of Southlake Plan Concerns Pool/Amenlry Area • Concern that pool and amenity area was reduced from original submittal Metal Band • Concern that metal band was romovod from Original plan Spandrel on Windows • Concern that window area on every floor was replaced with metal spandrel Rear Parking Green Space Concern that a green space in rear parking lot had been removed Guest Room Windows • Concern that windows were "split' with too many mullions Front Canopy Angle • Concern that front canopy angleldesign had changed Entry Tower Angle Concern that Entry Tower angle had been changed Louvers for VTAC • Concern that louvers were not on original concept drawing EFTS vs Stucco • Concern that plans show EFIS rather than approved Stucco • Both pool and patio have achtally increased in size - Original pool design was 452sf - new design is 469s4 • Original patio area was 6,250sf - new design is 8,250sf • The metal band was removed and replaced with spandrel glass to create a cleaner, sleeker look to those sections • Actually. spandrel glass ryas used - not metal spandrel - so Ha will look the same, but hide the necessary structural tlements with opaque glass • Green space was moved closer to the building, but we can return it to original approval location if necessary • Moved to improve civil design, landscape and runoff • We have moved the furniture off the wall and removed the ' mullion • Change was done to create more visually appealing and structurally sound design • This was done to update design to Cambria 2.0 prototype (old Cambria 1.4 prototype had angled design - Plano version is old design) • It was allays intended to do upgraded VTAC units rather than PTAC units, and this was discussed during original presentation • N19 have designed the louver as part of window configuration to minimize visual impact and create clean look • Term EFIS was an error on plans - it will be a 3-coat system per the original approvals • of It I 1 ■ • Both pool and patio have actually increased in size • Original pool design was 452sf - new design is 469sf • Original patio area was 6,250sf - new design is 8,250st • The metal band was removed all replaced with spandrel glass to create a cleaner, sleeker look to those sections • Actually. spandrel glass was used - not metal spandrel - soZ will look the same, but hide the necessary structural eleme with opaque glass • Green space was moved closer to the building, but we can return it to original approval location if necessary Moved to improve civil design. landscape and runoff • Vie have moved the furniture off the mall and removed the mullion Change was done to create more visually appealing and structurally sound design This was done to update design to Cambria 2.0 prototype (old Cambria 1.4 prototype had angled design -Plano version is old design) • It was always intended to do upgraded VTAC units rather than PTAC units, and this was discussed during original presentation VVe have designed the louver as part of window configuration to minimize visual impact and create clean look Term EFIS was an error on plans - twill be a 3-coat system per the original approvals Case No. Attachment C ZA15-032 Page 13 Interior Planninq Issues Conference Center Total SF • Square Footage of Conference Centerchanged Meeting Space Total SF • Concern that Meeting Room SF decreased from 5.100sf to 5,079sf Breakout Rooms shifted from 1,44Dsf to 1,372sf Kitchen SF • Concern that Kitchen SF decreased from 1,200sf to 920s1 Boardroom SF • Squaro Footago of Boardroom chongod Extra Breakout Room SF • Concern that Extra Breakout Roorn SF changed Fitness Center SF • Concern that Fitness Center SF changed from 1.995sf to 1,061 sf Tower Interior Ceiling Height • Concern that interior Tower ceiling height was changed from2-stories to 1-story • Overall Conference Center square footage INCREASED from 8,380sf to 8,738sf • Most of this space was shifted to increase Boardroom space, and improve overall layout • Added additional restrooms • Original Ordinance document was incorrect — totaled 5,076sf, not 5,100sf • Still working on the final Kitchen SF • W I likely add satellite pantry/prep area to Conference space which vAll Increase Kitchen SF to almost 1,200sf Boardroom SF was INCREASED from 288sf to 507sf to accommodate 14 pooplo instoad of original 10 • Boardroom will be focal point of Conference Center Square Footage changed from 468sf to 456sf • Original Fitness Center layout blocked access to Outdoor Amenity area — moved to allow connection between Indoor and Outdoor space Space was shifted to create Pub/Bar area and larger dining space • Created much more Resort -style amenity with better flour be ween Bar/ Pub/Fite Pit/Pool area • The 2-story ceding was part of the old Cambria prototype design. which was found to feel cold and cavernous, resulting in very few guests utilizing the area • Interior 1st floor ceiling heights are still 12 feet • The proportion and scale of the space is better at 1 story • This allows us to add a Luxury Suite in the Tower space with glass walls throughout the room Interior Plannina Issues Conference Center Total SF • Square Footage of Conference Center changed Meeting Space Total SF • Concern that Meeting Room SF decreased from 5.100sf to 5.079sf Breakout Rooms shifted from 1,44Dsf to 1,372sf Kitchen SF Concern that Kitchen SF decreased from 1,200sf to 920s1 Boardroom SF • Squaro Footage of Boardroom changod Extra Breakout Room SF • Concern that Extra Breakout Roorn SF changed Fitness Center SF • Concern that Fitness Center SF changed from 1,995sf to 1, 061 sf Tower Interior Ceiling Height • Concern that interior Tower ceiling height was changed from 2-stories to 1-story C M. • Overall Conference Center square footage INCREASED from 8,380sf to 8,738s( Most of this space was shifted to increase Boardroom space, and improve overall layout • Added additional restrooms Original Ordinance document was incorrect — totaled 5,076sf, not 5,100sf • Still working on the final Kitchen SF • W I likely add satellite pantry/prep area to Conference space which vnll Increase Kitchen SF to almost 1,200st Boardroom SF was INCREASED from 288sf to 507sf to accommodate 14 pooplo instoad of original 10 • Boardroom will be focal point of Conference Center • Square Footage changed from 468sf to 456sf • Original Fitness Center layout blocked access to Outdoor Amenity area — moved to allow connection between Indoor and Outdoor space Space was shifted to create PubfBar area and larger dining space • Created much more Resort -style amenity with better flow between Bar/ Pub/Fite Pit/Pool area • The 2-story ceding was part of the old Cambria prototype design. which was found to feel cold and cavernous, resulting in very few guests utilzing the area • Interior ist floor ceiling heights are still 12 feet • The proportion and scale of the space is better at 1 story • This allows us to add a Luxury Suite in the Tower space with glass walls throughout the room Case No. Attachment C ZA15-032 Page 14 Interior Plannina Issues Conference Center Total SF • Square Footage of Conference Center changed Meeting Space Total SF Concern that Meeting Room SF decreased from 5.100sf to 5,079sf Breakout Rooms shifted from 1,440sf to 1,372sf Kitchen SF Concern that Kitchen SF decreased from 1,200sf to 920sf Boardroom SF • Square Footage of Boardroom changed Extra Breakout Room SF • Concern that Extra Breakout Room SF changes Fitness Center SF • Concern that Fitness Center SF changed from 1 995sf to 1,061 sf Overall Conference Center square footage INCREASED from 8,3805f to 8,738s( • Most of this space was shifted to increase Boardroom space, and improve overall layout • Added additional restrooms • Original Ordinance document was incorrect — totaled 5,076sf, not 5,100sf • Still working on the final Kitchen SF • Wl likely add satellite pantry/prep area to Conference space which vtill increase Kitchen SF to almost 1,200sf • Boardroom SF was INCREASED from 288sf to 507sf to accomrodate 14 people instead of original 10 • Boardroom will be focal point of Conference Center • Square Footage changed from 468sf to 456sf • Original Fitness Center layout blocked access to Outdoor Amenity area — moved to allow connection between Indoor and Outdoor space • Space was shifted to create Pub/Bar area and larger dining space Created much more Resort -style amenity with better flow between Bar/ PublFire Pit/Pool area Tower Inferior Ceiling Height The 2-story ceiling was part of the old Cambria prototype design. which • Concern that interior Tower ceiling height was was found to feel cold and cavernous, resulting in very few guests changed from 2-stories to 1-story utilizing the area • Interior 1st floor ceiling heights are still 12 feet • The proportion and scale of the space is better at 1 story • This allows us to add a Luxury Suite in the Tower space with glass walls throughout the room Interior Planning Issues Comments Conference lbtal SF j&• Square Footage of Conference Center changed WMeeting Space Total SF Concern that Meeting Room SF decreased from 5.100sf to 5.079sf Breakout Rooms shifted from 1,4413sf to 1,372sf Kitchen SF Concern that Kitchen SF decreased from 1,200sf to 920sf Boardroom SF • Squaro Footago of Boardroom chongod Extra Breakout Room SF • Concern that Extra Breakout Room SF changed Fitness Center SF Concern that Fitness Center SF changed from 1,995sf to 1,061 sf Tower Interior Ceiling Height • Concern that interior Tower ceiling height was changed from2-stories to 1-story Overall Conference Center square footage INCREASED from 8,380sf to 8,738s( • Most of this space was shifted to increase Boardroom space, and improve overall layout • Added additional restrooms Original Ordinance document was incorrect— totaled 5,076sf, not 5,100sf • Still working on the final Kitchen SF • WII likely add satellite pantry/prep area to Conference space which vtill increase Kitchen SF to almost 1,200sf Boardroom SF was INCREASED from 288sf to 507sf to accommodate 14 pooplo instoad of original 10 Boardroom will be focal point of Conference Center • Square Footage changed from 468sf to 456sf • Original Fitness Center layout blocked access to Outdoor Amenity area — moved to allowconnection between Indoor and Outdoor space • Space was shifted to create Pub/Bar area and larger dining space • Created much more Resort -style amenity with better flow between Bar/ Pub/Fire PttlPool area • The 2-story ceiling was part of the old Cambria prototype design. which was found to feel cold and cavernous, resulting in very few guests utilizing the area Interior 1st floor ceiling heights are still 12 feet • The proportion and scale of the space is better at 1 story • This allows us to add a Luxury Suite in the Tower space with glass walls throughout the room Case No. ZA15-032 Attachment C Page 15 Boardroom SF 11111 111111.� Ib ■ '..11=■ f� a UPGRADED GLASS WALLS FOCAL POINT OF UPGRADED _ CONFERNECE BUILT IN SERVE CENTER STATIONS Interior Plannina Issues • Square Footage of Conference Center changed Meeting Space Total SF • Concern that Meeting Room SF decreased from 5.100sf to 5.079sf Breakout Rooms shifted from 1,440sf to 1,372sf Kitchen SF Concern that Kitchen SF decreased from 1,200sf to 920sf Boardroom SF • Squaro Footago of Boardroom chongod Extra Breakout Room SF • Concern that Extra Breakout Room SF changed Fitness Center SF Concern that Fitness Center SF changed from 1,995sf to 1,061 sf Tower Interior Ceiling Height • Concern that intenor Tower ceiling height was changed from2-storiesto 1-story PRE -FUNCTION MEETING 11J.')M • Overall Conference Center square footage INCREASED from 8.380sf to 8,738sf • Most of this space was shifted to increase Boardroom space, and improve overall layout • Added additional restrooms Original Ordinance document was incorrect— totaled 5,076sf, not 5,100sf • Still working on the final Kitchen SF • WII likely add satellite pantry/prep area to Conference space which vdll increase Kitchen SF to almost 1,200sf • Boardroom SF was INCREASED from 288sf to 507sf to accommodate 14 pooplo instoad of original 10 • Boardroom will be focal point of Conference Center Square Footage changed from 468sf to 456sf • Original Fitness Center layout blocked access to Outdoor Amenity area — moved to allow connection between Indoor and Outdoor space • Space was shifted to create Pub/Bar area and larger dining space • Created much more Resort -style amenity with better flow between Bar/ PublFlre Pit/Pool area • The 2-story ceiling was part of the old Cambria prototype design. which was found to feel cold and cavernous, resulting in very few guests utilizing the area • Interior 1st floor ceiling heights are still 12 feet • The proportion and scale of the space is better at 1 story • This allows us to add a Luxury Suite in the Tower space with glass walls throughout the room Case No. Attachment C ZA15-032 Page 16 Interior Planning Issues City of Southlake Plan Concerns], _i Conference Center Total SF • Overall Conference Center square footage INCREASED from 8,380sf to • Square Footage of Conference Center changed 8.738sf Meeting Space Total SF Concern that Meeting Room SF decreased from 5.100sf to 5,079sf Breakout Rooms shifted from 1,440sf to 1,372sf Kitchen SF Concern that Kitchen SF decreased from 1.200sf i to 92Csf Boardroom SF Square Footage of Boardroom changed Frtra Breakout Room SF • Concern that Extra Breakout Room SF changed Fitness Center SF • Concern that Fitness Center SF changed from 1,ggssf to 1.061 sf Tower Interior Ceiling Height • Concem that interior Tower ceiling height was changed from 2-stories to 1-story • Most of this space %vas shifted to increase Boardroom space, and improve overall layout Added additional restrooms • Original Ordinance document was incorrect— totaled 5,076sf, not 5.100sf • Still working on the final Kitchen SF • Will likely add satellite pantrylprep area to Conference space which vtill increase Kitchen SF to almost 1,200sf Boardroom SF was INCREASED from 288sf to 507sf to accommodate 14 people instead of original 10 • Boardroom will be focal point of Conference Center • Square Footage changed from 468sf to 456sf • Original Fitness Center layout blocked access to Outdoor Amenity area — moved to allow connection between Indoor and Outdoor space • Space was shifted to create Pub/Bar area and larger dining space • Created much more Resort -style amenity with better flow between Bar/ Pub/Fire Pit/Pool area • The 2-story ceiling was part of the old Cambria prototype design. which was found to feel cold and cavernous, resulting in very few guests utilizing the area • Interior 1st floor ceiling heights are still 12 feet The proportion and scale of the space is better at 1 story • This allows us to add a Luxury Suite in the Tower space with glass walls throughout the room Interior Planning Issues Conference Ce Overall Conference Center square a INCREASED from 8.380sf to • Square Footage of Conference Center changed 8,738s( Meeting Space Total SF • Concern that Meeting Room SF decreased from 5.100sf to 5,079sf Breakout Rooms shifted from 1,440sf to 1,372sf Kitchen SF Concern that Kitchen SF decreased from 1,200sf to 920sf Boardroom SF • Squaro Footage of Boardroom changed Extra Breakout Room SF • Concern that Extra Breakout Room SF changed Fitness Center SF • Concern that Fitness Center SF changed from 1,995sf to 1,061 sf Tower Interior Ceiling Height • Concern that interior Tower telling height was changed from 2-stories to 1-story • Most of this space %vas shifted to increase Boardroom space, and improve overall layout • Added additional restrooms Original Ordinance document was incorrect— totaled 5,076sf, not 5,100sf • Still working on the final Kitchen SF • Will likely add satellite pantrylprep area to Conference space which vnll increase Kitchen 5F to almost 1,200sf • Boardroom SF was INCREASED from 288sf to 507sf to accommodate 14 people instead of original 10 Boardroom will be focal point of Conference Center • Square Footage changed from 468sf to 456sf • Original Fitness Center layout blocked access to Outdoor Amenity area — moved to allow connection between Indoor and Outdoor space • Space was shifted to create Pub/Bar area and larger dining space • Created much more Resort -style amenity with better flow between Bar/ Pub/Fite Pit/Pool area • The 2-story ceiling was part of the old Cambria prototype design which was found to feel cold and cavernous, resulting in very few guests utilizing the area • Interior lstfloor ceiling heights are still 12 feet • The proportion and scale of the space is better at 1 story • This allows us to add a Luxury Suite in the Tower space with glass walls throughout the room Case No. Attachment C ZA15-032 Page 17 QUESTIONS ! CONCERNS: None SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official meeting minutes, rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council. Case No. Attachment C ZA15-032 Page 18 USOUTHLA14,'E SPIN MEETING REPORT CASE NO. ZA13-135 PROJECT NAME SPIN DISTRICT: MEETING DATE: MEETING LOCATION: TOTALATTENDANCE Kimball Park SPIN # 4 January 6, 2014; 6:00 PM 1400 Main Street, Southlake, TX City Council Chambers Twenty-two (22) • SPIN REPRESENTATIVE(S) PRESENT: Vic Awtry #7 • APPLICANT(S) PRESENTING: Jeff Medici and 3 others • STAFF PRESENT: Patty Moos, Planner I STAFF CONTACT: Richard Schell, Planner 11: (817)748-8602 or rschell(Qci.southlake.tx.us EXECUTIVE SUMMARY Property Situation • The property is located at 400 N. Kimball Avenue (the northwest corner of SH 114 and N. Kimball Avenue). The plan presented at SPIN: 77 r i. I`•"- i�+�i, wl�ri•� a W_ Case No. Attachment C ZA15-032 Page 19 Kimball Avenue Entrance Hotel Site Hotel East Facade Case No. Attachment C ZA15-032 Page 20 ■1 Mi i1�u ��mini ■1 i ■1 1E. ■1 1�� 1�, n:,1� _ milli � ' LI � 11�111111111111 I! ' . U�m Mimbali Park Cambria Suites Hotel 5 TES f" A Pool and Patio Development Details: • 15.5 acres • Entrances off SH114 and N. Kimball Avenue • 175 suite, 4 story hotel (upscale rating) with conference rooms, ballrooms, pool, full service, and fitness area. • Room size average 405 sf • Shuttle to Town Square • Phase I will be drives, hotel and drainage/park improvements • Masonry for hotel near 100% masonry • Other phases will include 2 restaurant pads, 1 fitness/health/restaurant pad, and 1 office (96,000 sf) building(s) pad to be developed at a later date • Circular drop-off feature on interior drive • Drainage are to be improved for park area with above ground detention • Shared parking agreements for entire development • Delivery and trash pick-up times limited QUESTIONS / CONCERNS Did the hotel location move from the proposed hotel in 2012? The layout moved north a short distance and the layout is compressed from the original concept. Why did you set the hotel back off SH 114 and not along the frontage road? The hotel was set back to allow parking in the front of the entrance and the area along the frontage road was too narrow to site the hotel. The location also allows for the circular drive, office building, and restaurant/health building to tie together. Did the SH 114 restaurant location move? No, it is in the same location. Comment: The entrance from SH114 seems hidden. There will be a sign along the SH114 entrance. Will there still be a sewer tap on the west side of the property for the newly constructed office building to tie into as required by the City? Yes, the sewer can tie into this location. Case No. Attachment C ZA15-032 Page 22 How wide are the drives and can they be wider? Parking lots are 24' wide and drive is 26' wide. We can look at widening the drives. Are you required by TOOT to provide a decel lane? The TIA and TxDOT do not require the decel lane. What variances are being requested with this development? Stacking depth at entry drive and private drive with lots fronting on private drive Who will maintain the private drives? The development owners association will maintain the private drives. Are you buying the metal buildings along N. Kimball Avenue? No. What happened to the Embassy Suites hotel and does this hotel have suites? The hotel has changed and the hotel is all suites. The suites are separated by partitions and some have separate rooms. Is there a restaurant in the hotel? Yes. What types of restaurants are on the property? 3 potential restaurants: sit down restaurant on SH 114 frontage, drive thru, and spa/wellness/restaurant Comment: Drive thru restaurant needs to have enough stacking depth in drive thru lane. Meeting presentation adjourned at 7:15 pm SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official meeting minutes, rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council. Case No. Attachment C ZA15-032 Page 23 S-P-2 REGULATIONS ,Adams April 15, 2)015 Kimball Park Proposed Permitted Uses and Development Regulations for "S-P-2" Zoning Permitted Uses: This property is divided into six lots. Lot 1, consisting of 3.59 acres, shall include the permitted uses as found in the "HC" Hotel District, Lot 3 shall include permitted uses found in the "0-2" Office District and Lots 2, 4, and 5 shall include the permitted uses as found in "C-2" Local Retail Commercial District of Zoning Ordinance No. 480, as amended, with the following exceptions: Lot 1: "HC" Hotel District uses to also include: • Restaurant and bar which are accessed from an interior lobby • Conference Center totaling 8,738 square feet of meeting and support space that includes the ballroom, board room, meeting room, pre -function area and storage. Lot 2, 4 & 5: "C-2" Local Retail Commercial District uses limited to: • Restaurant (Bar is a permitted accessory use) • Coffee Shop/ Restaurant with Drive-Thru Service on Lot 4 only (excludes fast food) • Retail • Health & Well Being businesses (massage therapy, fitness, health related products) • Spa Lot 3: "0-2" Office District uses to also include: • Multi -story office buildings up to 4 above grade floors with grade level floor used for parking. • Allow for initial or future parking deck to meet additional parking demands with a parking ratio of 4 spaces per 1000sf. Lot 6: Open Space lot with natural vegetation, existing creek channel, new plantings and detention area. Primary area will serve as a drainage easement. Development Regulations: This property shall be subject to the development regulations for the "HC" Hotel District for Lot 1, the "C-2" Local Retail Commercial District for Lot 2, 4 & 5, and "0-2" Office District for Lot 3 and all other applicable regulations with the following exceptions: • Parking agreements will be in place prior to permitting to satisfy the combined parking requirements for the development. Required parking will be as shown on plan. • To facilitate a contiguous development, buffer yards will not be required along internal boundary lines. 910 S. Kimball Avenue • Southlake, Texas 76092 8173283200 • PAX 817.328.3299 TBPE Reg. No. F-1002; www.adams-engineering.com Case No. Attachment D ZA13-135 Page 1 • Given the long runs along portions of the fagade, an overuse of building articulations will distract from a more stream -lined architectural intent. For this reason, articulation for Lot 1 will be as shown on the architectural site plan, conceptual floor plans, and exterior elevations. Articulation will be dimensioned on the floor plans for clarity. • Delivery to the property will be scheduled and limited to occur between the hours of 7:00am — 7:00pm daily and trash pick-up will be limited to occur between the hours of 7:00am — 7:00pm Monday — Saturday (must conform to the Contract for Residential and Commercial Refuse and Collection). • The western property line adjacent to the multi -family residential lots will be screened with a vegetated screening of. existing plant material, required plantings within the buffer and additional large shrubs and accent trees planted within the buffer yard. Plantings consisting of both existing and new plant material will achieve a solid screening to 8' in height and will be shown on the landscape plan. • Loading zones are positioned within each lot as shown on plan and in the site data summary chart. • As in internalized development with a shared common access easement and parking the building lines will be allowed as shown on plan. • Vary from each lot fronting a right-of-way to allow the lot configuration as shown on plan • Stacking depths at both the Kimball and Hwy 114 entrance allowed by approval of the attached Variance Request letter. • With the close proximity of the proposed buildings and cross parking layout impervious calculations will vary to allow for an overall impervious area of 70%. Use and Operation The project overview entails a hotel and office development with an out parcel fronting on SH 114 and two internal parcels that will be developed into a mixture of uses to include restaurant, retail, health & well-being and coffee shop with drive-thru. The following is a lot by lot breakdown with the primary emphasis on the Lot 1 Site Plan. Lot 1 (Site Plan Application) Site plan proposes a Cambria Suites `all -suites' hotel with an upscale rating according to Smith Travel Research. Indoor services/ uses to include: • Restaurant with lounge • Bar with on -site alcohol consumption • 175 guest suites • Ballroom with partitions for a capacity of approximately 307 people • Administrative office space • Retail sundry space • 8,738 sf Conference Center that contains 5,079 sf of meeting space • Business Center • 1,061 sf Fitness Center Proposed outdoor services/ uses to include (it should be noted that all patios are interconnected): • Patio containing leisure area with pool, • Patio containing fire pit and dining • Roll -out bar service • Patio for Conference Center spill out 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 • FAx 817.328.3299 WE Reg. No. F-1002; www.adams-engineering.com Case NO. Attacnment L) ZA13-135 Page 2 9Adams • Shuttle service to points of interest Exterior Design of the Proposed Cambria Suites Hotel The proposed hotel is four (4) stories in height and totals approximately 111,897 square feet. The footprint of the building is approximately 29,514 square feet, and is 5l'-0" to the top of the primary parapet and 59'-4" to the top of the tower structure. The building design is contemporary and includes an identification tower adjacent to the hotel lobby entrance. This tower identifies the hotel from all access points to the site including when approaching the development from the airport. The base of the tower contains a single height hotel lobby while the upper floors contain executive suites. Arrival to the hotel is also signified by a contemporary Porte Cochere which contains an expressive cantilevered structural system consisting of brick piers and a clear polycarbonate clad canopy anchored in place by cable stanchions. The exterior finish materials of the building include brick, stucco, metal and glass. Brick will be used primarily at the towers, along the entire base of the building, at projecting wall frame elements, and in select locations to create additional articulation between building volumes. At the upper floors, at infill walls within the projecting frames, and on all non -street facing elevations (north and west), a stucco finish is proposed. Two colors will be utilized: a medium taupe for the lower portions of the walls and a light tan for the upper floor. Summary of use and operations — Cambria Suites Hotel: The developer proposes to develop a Cambria Suites hotel. The proposed hotel is programmed to have 175 guest suites, a 8,738 square foot Conference Center containing 5,079 sf of meeting space, restaurant and bar, fitness center, and pool. The restaurant/ bar operation will consist of approximately 2,700 primary dining / lounge space and utilize the outdoor courtyard on select occasions. The restaurant and bar will primarily service hotel guests and adjacent office building tenants, although it will be open to the public as well. A 920 sf kitchen is positioned in the floor plan to efficiently service the dining area as well as to service the meeting rooms. In addition the hotel courtyard will be well appointed for both a relaxing and vibrant atmosphere with a pool, fireplace and periodic live entertainment. Hotel hours of operation: - Food Service / Restaurant typically opens at 6:00am and closes no later than 11:OOpm, 7 days a week. - Bar Service typically opens at 10:00am and closes no later than 2:00am Mon -Sat; typically opens at 11:00am and closes no later than 2:00am on Sunday. - Live Music will end no later than 12:00am, 7 days a week. - Outdoor Speakers — sound system will be shut off no later than 12:00 am and any outdoor music will be discontinued no later than 12:00 am, 7 days a week. The proposed conference space is included in the footprint of the hotel and is programmed primarily to host group events such as corporate meetings and social events. The meeting space will have a prominent second entrance for access from the adjacent office buildings. The proposed ballroom is 4,116 square feet and has a programmed capacity of 307. The ballroom will have a large conference patio that connects to the pool area and fire pit. The room is divisible into three break-out rooms of approximately 1,350 square feet each. The program also includes a break-out meeting room containing 456 square feet and has a 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 • Prix 817.328.3299 TBPE Reg. No. F-1002; www.adams-engineering.com Case No. Attachment D ZA13-135 Page 3 9Adams capacity of 27. The program also includes a board room containing 507 square feet and has a capacity of 14. Operationally the hotel will be able to host all size corporate events with activities, leisure, banquets, break-out meetings, dining and lodging. For non -corporate or smaller events the facilities will be available by reservation to rent the ballroom and meeting rooms. Conference space hours of operation: - Normal hours (corporate events) — 9:00am-9:00pm Mon -Sat/ 11:00am-7:00pm Sun - Special event hours — 7:00am-2:00am Mon -Sat/ 11:00am-11:00pm Sun Lot 2 Concept plan proposes an out -parcel lot for a restaurant. • Concept plan is intended to show scale of what can fit on the out -parcel in accordance with the Comprehensive Zoning Ordinance and the SH 114 Corridor overlay. Site data for what is shown in the concept consists of a single story 10,000sf footprint and 63 parking spaces. Also shown is an outdoor waiting area with bar service. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance and the SH 114 Corridor Overlay but should generally conform to the concept plan. • Development will be a restaurant. • Majority of parking requirements shall be provided on -site and the remaining will be subject to a combined parking agreement with the other lots within the development. • Restaurant will have the ability to include an outdoor waiting area with bar service and limited seating. • A 15 X 25 sign easement as shown on the site plan will run with the sale of the property. • The fire lane illustrated along the Lot 2 boundary line and access point to the main entry drive will remain as shown on the Site Plan. Lot 3 Concept plan proposes the development of a three-story office development that could develop as a four- story structure with parking on the ground level or have a parking deck to facilitate future parking demands. • Concept plan is intended to show scale of what can fit on the proposed lot with structure and parking in accordance with the Comprehensive Zoning Ordinance. Site data for what is shown in the concept consists of a three story office building with a 32,000 footprint for a total of 96,000sf and 326 parking spaces. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance but should generally conform to the concept plan. Lot 4 Concept plan proposes the development of a restaurant/ coffee -shop with drive-thru. • Concept plan is intended to show scale of what can fit on the proposed lot in accordance with the Comprehensive Zoning Ordinance. Site data for what is shown in the concept consists of a single story 4,500sf footprint and 52 parking spaces. Also shown is a dedicated drive-thru lane. • Any restaurant use will exclude fast-food franchises. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance but should generally conform to the concept plan. Lot 5 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 0 FAx 817.328.3299 TBPE Reg. No. F-1002; www.adams-engineering.com Case No. Attachment D ZA13-135 Page 4 Concept plan proposes the development of a restaurant/ retail building. • Concept plan is intended to show scale of what can fit on the proposed lot in accordance with the Comprehensive Zoning Ordinance. Site data for what is shown in the concept consists of a single story 9,222sf footprint and 54 parking spaces. Also shown is ample space for outdoor dining and plaza space. • Development is conceptually proposed to be a multi -tenant structure with uses relative to restaurant, retail and/or health and well-being. Possible health and well-being uses could consist of massage therapy, fitness, spa and health related products and services. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance but should generally conform to the concept plan. • Majority of parking requirements shall be provided on -site and the remaining will be subject to a combined parking agreement with the other lots within the development. Phasing Intent Phasing Intent It is the intent of the developer to move forward with construction documents for the hotel immediately upon Site Plan approval from Council. The entirety of all elements shown on Lot 1 will be part of the construction package and bidding as will the primary drive aisle loop from Hwy 114 to Kimball Ave and the POA lot which includes the detention. The fire lane that is split by the Lot 2 boundary and Lot 3 boundary will be built as well. Lots 2-5 will come on-line as each lot is put under contract. It is unknown at this time what the order of take -down will be. Lot 1 Parking Analysis (Hotel Parking as shown on the plan includes 211 spaces within Lot 1 and 495 spaces within Lot 2-5 for a total of 706 spaces. Required parking for Lot 1 per the City of Southlake ordinance was calculated as follows: - 175 rooms @ 1 per room =175 spaces - Additional provided for accessory uses = 36 spaces - Bar/ Restaurant (accessory use to the hotel) @ 1/100sf X approx 2,700sf = 28 spaces (25% of spaces required are additional to the hotel use = 7 spaces. The balance 75% is accessory to the hotel and no additional spaces to those allocated to guestrooms are proposed) - Meeting space (accessory use to the hotel) @ 1/ 3 seats X 348 seats = 116 required spaces from occupant load calcs; 25% of spaces required are additional to the hotel use = 116 X .25 = 29 spaces. The balance 75% is accessory to the hotel and no additional spaces to those allocated to guestrooms are proposed) - Total spaces required =175 + 7 + 29 = 211 Lot 1 Total = 211 provided spaces 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 0 FAX 817.328.3299 TBPEReg. No. F-1002; www.adams-engineering.com Case No. Attachment D ZA13-135 Page 5 APPLICANT'S COMMENTS Cambria Southlake Exterior Planning Issues City of Southlake Plan Concerns Comments Pool/Amenity Area Both pool and patio have actually increased in size • Concern that pool and amenity area was reduced from original Original pool design was 452sf — new design is 469sf submittal Original patio area was 6,250sf — new design is 8,250sf Spandrel on Windows Actually, spandrel glass was used — not metal spandrel — so it • Concern that window area on every floor was replaced with will look the same, but hide the necessary structural elements metal spandrel with opaque glass Rear Parking Green Space Green space was moved closer to the building, but we can • Concern that a green space in rear parking lot had been return it to original approval location if necessary removed Moved to improve civil design, landscape and runoff Guest Room Windows We have moved the furniture off the wall and removed the • Concern that windows were "split" with too many mullions mullion Front Canopy Angle Change was done to create more visually appealing and • Concern that front canopy angle/design had changed structurally sound design Entry Tower Angle This was done to update design to Cambria 2.0 prototype (old • Concern that Entry Tower angle had been changed Cambria 1.4 prototype had angled design — Plano version is old design) Louvers for VTAC It was always intended to do upgraded VTAC units rather than • Concern that louvers were not on original concept drawing PTAC units, and this was discussed during original presentation • We have designed the louver as part of window configuration to minimize visual impact and create clean look EFTS vs Stucco Term EFIS was an error on plans— it will be a 3-coat system per • Concern that plans show EFIS rather than approved Stucco the original approvals Case No. Attachment D ZA13-135 Page 6 APPLICANT'S COMMENTS Case No. Attachment D ZA13-135 Page 7 APPROVED RENDERING PROPOSED RENDERING IM Case No. Attachment D ZA13-135 Page 9 Case No. Attachment D ZA13-135 Page 10 M111;8Will kiINELVAIA4►&IIILTA ILYi Fill :vi Case No.: ZA15-032 Review No.: One Date of Review: 04/16/15 Project Name: Site Plan — Kimball Park APPLICANT: Brad McKissick ENGINEER: Jimmy Fechter Fillmore Hospitality Adams Engineering 910 S. Kimball Ave. Southlake, TX 76092 Phone: (817) 328-3215 E-mail: limmy.fechter(a�adams-engineerinq.com CITY STAFF HAS REVIEWED THE ABOVE REFERENCED PROJECT RECEIVED BY THE CITY ON 4/10/15 AND WE OFFER THE FOLLOWING STIPULATIONS. THESE STIPULATIONS ARE HEREBY MADE CONDITIONS OF SITE PLAN APPROVAL UNLESS SPECIFICALLY AMENDED BY THE CITY COUNCIL. IF YOU HAVE ANY QUESTIONS OR NEED FURTHER CLARIFICATION, PLEASE CONTACT DENNIS KILLOUGH AT (817) 748-8072. The proposed revisions are only to Lot 1 of the Kimball Park Development. All previously approved plans and conditions of approval remain in effect unless specifically revised as part of this request. Tree Conservation/Landscape Review E-mail: kmartin@ci.southlake.tx.us Keith Martin Landscape Administrator Phone: (817) 748-8229 TREE CONSERVATION COMMENTS: The submitted Development Regulations propose that the western property line adjacent to the multi- family residential lots will be screened with a vegetated screening of: existing plant material, required plantings within the buffer and additional large shrubs and accent trees planted within the bufferyard. There are a significant amount of existing trees and associated vegetation along the west and north property lines. Identify these trees and designate if they will be preserved, removed, considered marginal, and show how the proposed west bufferyard landscaping will be integrated with the existing vegetation. Please be aware that all existing trees shown to be preserved on the City Council approved Tree Conservation Plan must be preserved and protected during all phases and construction of the development. Alteration or removal of any of the existing trees shown to be preserved on the approved Tree Conservation Plan is a violation of the Tree Preservation Ordinance and the zoning as approved by the Southlake City Council. Please ensure that the layout of all structures, easements, utilities, structures grading, and any other structure proposed to be constructed do not conflict with existing trees intended to be preserved. INTERIOR LANDSCAPE & BUFFERYARDS COMMENTS: The parking lot landscape islands are required to contain at least the minimum of the required canopy tree as shown along with shrubs, ground cover, ornamental grasses, seasonal color or a combination of these plant materials. Turf grass is not acceptable vegetation within the parking lot landscape Case No. Attachment E ZA15-032 Page 1 islands. Indicates informational comment. # Indicates required items comment. Public Works/Engineering Review Steve Anderson, P.E., CFM Civil Engineer Phone: (817) 748-8101 E-mail: sanderson@ci.southlake.tx.us PRELIMINARY UTILITY COMMENTS: 1. No 900 bends, use 2-450 bends. 2. All waterlines to be public and in easements. 3. 12" waterline not on the City's Master Water Plan, therefore no city participation in upsizing. 4. Any sanitary sewer lines crossing lot lines will need to be public and contained in easements. 5. Extend SS-1 west to property line. 6. Extend SS-4 to west property line. INFORMATIONAL COMMENTS: Submit 4 copies of the civil construction plans (22" X 34" full size sheets) and a completed Construction Plan Checklist as part of the first submittal for review directly to the Public Works Administration Department. The plans shall conform to the most recent construction plan checklist, standard details and general notes which are located on the City's website. A ROW permit shall be obtained from the Public Works Operations Department (817) 748-8082 to connect to the City's sewer, water or storm sewer system. A Developer's Agreement will be required for this development and may need to be approved by the City Council prior to any construction of public infrastructure. Construction plans for these improvements must be acceptable to Public Works prior to placing the Developer's Agreement on the City Council agenda for consideration. A separate bond will be required for the Maintenance Bond and bound only unto the City of Southlake for a period of two years for all development projects. The Maintenance Bond cannot be tied to the Performance and Payment Bond in any way. Any hazardous waste being discharged must be pretreated Ordinance No. 836. Fire Department Review Kelly Clements Assistant Fire Marshal Phone: (817) 748-8671 E-mail: klements@ci.southlake.tx.us Case No. Attachment E ZA15-032 Page 2 CrlEll kiIEllZUIKd91LY,I►YilEll ki III &I An automatic fire sprinkler system will be required for all commercial structures in excess of 6,000 square feet, with coverage extended into the attic if comprised of combustible construction. (per 2009 I.F.C. Sec. 903.3.1.3 as amended). Also, the restaurants classified as an A-2 occupancy will require an automatic sprinkler system with an occupant load in excess of 100. All sprinkled buildings are required to be equipped with a fire alarm in compliance with NFPA 72, the 2009 International Fire Code, and the City of Southlake amendments. A complete set of plans for the underground fire protection line, fire sprinkler system, and fire alarm system shall be submitted to Reed Fire Protection for review and approval at 14135 Midway Road in Addison, Texas 75001. Business phone is 214-638-7599. A Knox Box Rapid Key entry system shall be installed on the buildings near access to the riser room. Keys must be provided to access the riser room. The Knox Box can be ordered on the Internet at www.knoxbox.com. A 5 inch Fire Department Connection shall be installed on each building, with a locking Knox cap attached to the FDC to prevent debris from entering the connection. An exterior audible/visual fire alarm device must be installed above the Fire Department Connection on each sprinkled building to indicate when a fire alarm condition is present in the building, or located as near as possible to the FDC, on the building, if the FDC is installed remotely. Approved suite numbers and/or building address shall be posted on all new buildings in such a position as to be plainly visible and legible from the street or road fronting the property. All numbers shall contrast with their background. Electrical, Mechanical, Roof Access, Fire Alarm Panel, Sprinkler Riser and all other pertinent rooms must be labeled with appropriate signage. The required backflow protection (double check valve) for the sprinkler system can be located on the riser if the riser is within 100 feet of the water main. If the riser is further than 100 feet from the main, the double check valve shall be in a pit. Riser rooms shall be a minimum of 5'X5' if the double check is not located on the riser, or a minimum of 6'X6' if it is on the riser. FIRE LANE COMMENTS: Fire lanes require minimum 30 ft. inside turn radius and minimum 54 ft. outside turn radius. IaIN;a:WQ:7e1ki1111111d91LY,I►YilEll ki III &I Hydrants required at a maximum spacing of 300 feet for commercial locations that contain un- sprinkled buildings, and 600 feet for commercial locations that contain completely sprinkled buildings.(If all buildings in the complex are completely sprinkled, then hydrant locations are acceptable except for adding a hydrant at the South entrance into the complex off of the service road of State Highway 114)(If all building are not completely sprinkled, then hydrants will need to be added and relocated to meet requirements) A fire hydrant shall be within 100 feet of each Fire Department Connection, and the Fire Department Connection within 50 feet of fire lane access.(Fire Department Connection locations not indicated on plans) Case No. Attachment E ZA15-032 Page 3 General Informational Comments A SPIN meeting is scheduled for April 28, 2015. A SPIN meeting for the Kimball Park development was held January 6, 2014 A final plat must be approved and filed prior to issuance of a building permit. No review of proposed signs is intended with this site plan. A separate building permit is required prior to construction of any signs. All mechanical equipment must be screened of view from right-of-ways and residential properties in accordance with the Zoning Ordinance No. 480, as amended. All lighting must comply with the Lighting Ordinance No. 693, as amended with regard to type of lighting, intensity, glare and spill -over. All development must comply with the Drainage Ordinance No. 605 and the Erosion and Sediment Control Ordinance No. 946, as amended. It appears that this property lies within the 65 LDN D/FW Regional Airport Overlay Zone and will require construction standards that meet requirements of the Airport Compatible Land Use Zoning Ordinance No. 479. Development must comply with all requirements in Zoning Ordinance No. 480, Section 43, Overlay Zones. The applicant should be aware that prior to issuance of a building permit a Plat must be processed and filed in the County Plat Records, a fully corrected site plan, landscape plan, irrigation plan, and building plans, must be submitted for approval and all required fees must be paid. This may include but not be limited to the following fees: Park Fee, Perimeter Street Fee, Water & Sewer Impact and Tap Fees, and related Permit Fees. The Council motions for the previously approved S-P-2 Zoning Change and Concept/Site Plan for the Kimball Park development that was approved March 4, 2014 is included below for reference: Previous Planning and Zoning Commission motion: January 9, 2014; Tabled to the January 23, 2014 P&Z meeting. January 23, 2014; Tabled to the February 6, 2014 P&Z meeting. February 6, 2014; Approved (5-0) subject to Revised Concept/Site Plan Review Summary No. 2 and Staff Report dated January 31, 2014, approving the two variances requested: 1) The driveways do not meet the minimum required stacking depth of 150'. Approximately 17.6' of stacking depth is shown on the N. Kimball Ave. driveway and 34.2' of stacking depth is shown on the S.H. 114 driveway and 2) Subdivision Ordinance No. 483, Section 8.01(A), as amended, requires that every lot front on a public or a private street. A variance is requested to allow the lots to be configured as shown on the Concept Plan and noting the applicants willingness to address the following: 1) the entrance to the hotel on the southeast corner of the hotel, 2) the parking and landscaping on the east side of the hotel 3) the design and layout of the retail/restaurant component around the circle with the potential for patio space on the southern side of the building as well as the northern side, 4) clarify renderings of the hotel 5) refine the renderings to more closely resemble the materials Case No. Attachment E ZA15-032 Page 4 anticipated being used, 6) place the fountain in the renderings and 7) add pedestrian access from the hotel to the green space on the southeast portion of the lot. Previous City Council motions: February 18, 2014; Approved at 1st reading (6-1) subject to the following stipulations: approval of requested variances —driveway stacking depth and Subdivision Ordinance regarding the public and private street access that will be configured as shown on the concept plan; concept plan review summary No. 3, dated February 11, 2014; understanding that applicant must come forward before the second reading with the following matters to be appropriately detailed and discussed (1) detailed entry feature on front southeast corner of the hotel, which may include fountains, landscape islands and detailed renderings of such, (2) regarding Lot 6, a detailed landscape plan showing how that can be incorporated with the federal requirements to not disturb the floodway, (3) discussion of the property owners agreement and how that may work regarding the project, (4) detailed floor plans, more specifically the first floor and within that floor plan a detail of the outdoor public spaces and how those will be incorporated into the hotel, (5) also regarding Lot 6, noting what can be manicured to the extent to provide for periodic maintenance within the floodway in connection with Lot 6 landscape detail and provide detailed plant material for entire project, and (6) detailed renderings for convention center from the Kimball approach which would also include traffic circle. March 4, 2014; Approved at 2nd reading (6-1) pursuant to the following: revised concept plan review summary No. 3, dated February 26, 2014; approving requested variances —driveway and minimum required stacking and Subdivision Ordinance 483, Section 8.01(A), as amended, which requires every lot to be on a public or private street and as requested to allow the lots to be configured as shown on the revised concept plan; also noting the requirements under this motion are pursuant to: (1) the revised renderings that were presented to Council this evening; (2) the Declaration of Covenants, Restrictions, and easements (CCR) as presented to Council in the application this evening; (3) the revised landscape plan presented to Council; (4) the revised permitted uses, as presented from Adams Engineering in their letter dated March 4, 2014, noting that the drive -through service will only be allowed for Lot 4; (5) also noting the balance of the concept plan for the buildings that are not included in this site plan approval that it is Council's expectation there will be 100% masonry construction; (6) the permitted uses represented from Adams Engineering that the food service hours of operations as noted in the application that "they will close no later than 11:00 p.m." that it is Council's intention to have wording that mentions that it will be "no earlier than 11:00 p.m.; (7) the office building in the concept plan will be a four story construction and that additional parking will be presented on the first level underneath the building; (8) and pursuant to the revised concept/site plan as presented this evening. Denotes Informational Comment Case No. Attachment E ZA15-032 Page 5 SURROUNDING PROPERTY OWNERS Kimball Park 0 w E KIRKWOOD BLVD N 2419 2423 2469 W J 07 724 2237 O 23 2001 2420 2460 2480 2500 251 zzo6 zo GREENBOUG REENB N z208 f N LN 2417 2419 2421 2481 2511 1 20 2209 �1 1774 1778 G G � 2426 2504 516 2508 2620 2626 504 F�LN 2503 2505 2509 2613 2621 a Z 1750 c u c v = 414 1j30 � 1910 o? m �0 Ir 900 LU 1g2p llJ 0 2000 U 1980 100 21m - P 0 2150a�� 2300 2354 2540 774 2600 26s6 SPO # 1. Owner Hagar, Stephen T Zoning AG Address 000479 N Kimball Ave Acreage 4.08 Response NR 2. Chamathil, Varghese Etux Sara AG 000411 N Kimball Ave 1.67 NR 3. Victron Stores Lp C3 000401 N Kimball Ave 0.89 NR 4. Ekstrom, Delton E SF1-A 000650 Cherry Ct 0.99 NR 5. St Laurence Episcopal Church CS 000517 N Kimball Ave 5.59 NR 6. Ivester, Emory O Etux Marlene AG 000501 N Kimball Ave 3.62 NR 7. T2T Property Holdings Llc 01 000000 Cherry Ln 1.02 NR 8. T2T Property Holdings Llc 01 000000 Cherry Ln 0.99 NR 9. Aos Investments Group Inc 01 000000 Cherry Ln 1.01 NR 10. Fusselman, Bruce Etux Michelle C3 002100 E State Hwy 114 1.80 NR 11. Tate, John T SP2 002120 E State Hwy 114 0.92 NR 12. Mayse, Richard A SP2 002110 E State Hwy 114 0.75 NR 13. Sandco Holdings Lp SP2 000420 N Kimball Ave 0.54 NR 14. Texas Petro Corp III SP2 002150 E State Hwy 114 1.16 F 15. Juneja, Vikas Etux Ashita M RPUD 002201 Cotswold Valley Ct 0.30 NR 16. Corp Of Episcopal Diocese Fw AG 000549 N Kimball Ave 0.94 NR 17. Harris, Kimberly Susan SF1-A 000700 Cherry Ct 0.94 NR 17 First Financial Trust & Asset MF1 000675 Cherry Ln 0.98 NR 18. Van Til, John J MF1 000627 Cherry Ln 1.01 NR 19. Reynal, John Etux Beverly S MF1 000575 Cherry Ln 1.14 NR 20. Halim, Emil A MF1 000725 Cherry Ct 0.96 NR 21. Mdp Southlake Llc SP2 000400 N Kimball Ave 9.33 NR 22. Vision Southlake Dev Llc SP2 000572 N Kimball Ave 0.39 NR 23. Kimball Road Lp 11 000500 N Kimball Ave 1.61 NR Case No. Attachment F ZA15-032 Page 1 24. Oncor Electric Delivery Co Llc CS 000000 N Kimball Ave 2.55 NR 25. Tdc Manaagement Llc SP2 000560 N Kimball Ave 0.48 NR 26. Lee, K Wayne SP2 000566 N Kimball Ave 0.66 NR 27. Vision Southlake Dev Llc SP1 000600 N Kimball Ave 4.41 NR 28. Bo-Fam Investments Ltd 11 000400 N Kimball Ave 0.37 NR 29. Mdp Southlake Llc SP2 000400 N Kimball Ave 6.13 NR 30. Bo-Fam Investments Ltd 11 000400 N Kimball Ave 0.32 NR 31. Hagar, Stephen T AG 000479 N Kimball Ave 4.08 NR Responses: F: In Favor O: Opposed To U: Undecided Notices Sent Within 200': Thirty-one (31) Responses Received: One (1) - Attached NR: No Response Case No. ZA15-032 Attachment F Page 2 Notification Response Form ZA15-032 Meeting Date: April 23, 2015 at 6:30 PM Texas Petro Corp III 13642 Omega Rd Dallas Tx 75244 Direct questions and mail responses to: City of Southlake Planning & Development Services Notti"ication Response 1400 Main St; Ste 310 Southlake, TX 76092 Phone: (817)748-8621 Fax: (81T)748-8077 PLEASE PROVIDE COMPLETED FORMS VIA MAIL, FAX OR HAND DELIVERY BEFORE THE START OF THE SCHEDULED PUBLIC HEARING. Being the owner(s) of the property so noted above, are hereby i�favorof opposed to undecided about (circle or underline one) the proposed Zoning Change and Site Plan referenced above. Space for comments regarding your position: Signature: Additional Signature: Printed Name(s): �—HAfZILE'S 1Vl j (q Must be property owner(s) whose name(s) are printed at top. Ott Phone Number (optional): Date: 4 2 I Z 016' Date: c6r6act the Planning Department. One form per property. Case No. ZA15-032 Attachment F Page 3 CITY OF SOUTHLAKE, TEXAS ORDINANCE NO. 480-657a AN ORDINANCE AMENDING ORDINANCE NO.480, AS AMENDED, THE COMPREHENSIVE ZONING ORDINANCE OF THE CITY OF SOUTHLAKE, TEXAS; GRANTING A ZONING CHANGE ON A CERTAIN TRACT OR TRACTS OF LAND WITHIN THE CITY OF SOUTHLAKE, TEXAS BEING LEGALLY DESCRIBED AS TRACTS 3A1A AND 3A2A, THOMAS MAHAN SURVEY, ABSTRACT NO. 1049, CITY OF SOUTHLAKE, TARRANT COUNTY, TEXAS, BEING APPROXIMATELY 15.518 ACRES, AND MORE FULLY AND COMPLETELY DESCRIBED IN EXHIBIT "A" FROM "S-P-2" GENERALIZED SITE PLAN DISTRICT TO "S-P-2" GENERALIZED SITE PLAN DISTRICT, AS DEPICTED ON THE APPROVED CONCEPT AND SITE PLANS ATTACHED HERETO AND INCORPORATED HEREIN AS EXHIBIT "B", SUBJECT TO THE SPECIFIC REQUIREMENTS CONTAINED IN THIS ORDINANCE; CORRECTING THE OFFICIAL ZONING MAP; PRESERVING ALL OTHER PORTIONS OF THE ZONING ORDINANCE; DETERMINING THAT THE PUBLIC INTEREST, MORALS AND GENERAL WELFARE DEMAND THE ZONING CHANGES AND AMENDMENTS HEREIN MADE; PROVIDING THAT THIS ORDINANCE SHALL BE CUMULATIVE OF ALL ORDINANCES; PROVIDING A SEVERABILITY CLAUSE; PROVIDING FOR A PENALTY FOR VIOLATIONS HEREOF; PROVIDING A SAVINGS CLAUSE; PROVIDING FOR PUBLICATION IN THE OFFICIAL NEWSPAPER; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Southlake, Texas is a home rule City acting under its Charter adopted by the electorate pursuant to Article XI, Section 5 of the Texas Constitution and Chapter 9 of the Texas Local Government Code; and, WHEREAS, pursuant to Chapter 211 of the Local Government Code, the City has the authority to adopt a comprehensive zoning ordinance and map regulating the location and use of buildings, other structures and land for business, industrial, residential and other purposes, and to amend said ordinance and map for the purpose of promoting the public health, safety, morals and general welfare, all in accordance with a comprehensive plan; and, WHEREAS, the hereinafter described property is currently zoned as "S-P-2" Generalized Case No. Attachment G ZA15-032 Page 1 Site Plan District under the City's Comprehensive Zoning Ordinance; and, WHEREAS, a change in the zoning classification of said property was requested by a person or corporation having a proprietary interest in said property; and, WHEREAS, the City Council of the City of Southlake, Texas, at a public hearing called by the City Council did consider the following factors in making a determination as to whether these changes should be granted or denied: safety of the motoring public and the pedestrians using the facilities in the area immediately surrounding the sites; safety from fire hazards and damages; noise producing elements and glare of the vehicular and stationary lights and effect of such lights on established character of the neighborhood; location, lighting and types of signs and relation of signs to traffic control and adjacent property; street size and adequacy of width for traffic reasonably expected to be generated by the proposed use around the site and in the immediate neighborhood; adequacy of parking as determined by requirements of this ordinance for off-street parking facilities; location of ingress and egress points for parking and off-street loading spaces, and protection of public health by surfacing on all parking areas to control dust; effect on the promotion of health ad the general welfare; effect on light and air; effect on the over -crowding of the land; effect on the concentration of population, and effect on transportation, water, sewerage, schools, parks and other public facilities; and, WHEREAS, the City Council of the City of Southlake, Texas, further considered among other things the character of the districts and their peculiar suitability for particular uses and the view to conserve the value of the buildings, and encourage the most appropriate use of the land throughout this City; and, WHEREAS, the City Council of the City of Southlake, Texas, does find that there is a public necessity for the zoning changes, that the public demands them, that the public interest clearly requires the amendments, and that the zoning changes do not unreasonably invade the rights of Case No. Attachment G ZA15-032 Page 2 those who bought or improved property with reference to the classification which existed at the time their original investment was made; and, WHEREAS, the City Council of the City of Southlake, Texas, does find that the changes in zoning lessen the congestion in the streets, helps secure safety from fire, panic, and other dangers, promotes the health and the general welfare, provides adequate light and air, prevents the over -crowding of land, avoids undue concentration of population, and facilitates the adequate provision of transportation, water, sewerage, schools, parks and other public requirements; and, WHEREAS, the City Council of the City of Southlake, Texas, has determined that there is a necessity and need for the changes in zoning and has also found and determined that there has been a change in the conditions of the property surrounding and in close proximity to the tract or tracts of land requested for a change since the tract or tracts of land were originally classified and therefore feels that the respective changes in zoning classification for the tract or tracts of land are needed, are called for, and are in the best interest of the public at large, the citizens of the city of Southlake, Texas, and helps promote the general health, safety and welfare of the community. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF SOUTHLAKE, TEXAS: SECTION 1. That Ordinance No. 480, the Comprehensive Zoning Ordinance of the City of Southlake, Texas, passed on the 19th day of September, 1989, as originally adopted and amended, is hereby amended so that the permitted uses in the hereinafter described areas be altered, changed and amended as shown and described below: Being described as Tracts 3A1A and 3A2A, Thomas Mahan Survey, Abstract No. 1049, City of Southlake, Tarrant County, Texas, being approximately 15.518 acres, and more fully and completely described in Exhibit "A" from "S-P-2" Generalized Site Plan District to "S-P-2" Generalized Site Plan District as depicted on the approved Concept and Site Plans attached hereto and incorporated herein as Exhibit "B", and Case No. Attachment G ZA15-032 Page 3 subject to the following conditions: S-P-2 Regulations for Ordinance No. 480-657 Case No. ZA15-032 Attachment G Page 4 t )Adams March 4, 2014 Kimball Park Proposed Permitted Uses and Development Regulations for "S-P-2" Zoning Permitted Uses. This property is divided into six lots. Lot 1, consisting of 3.59 acres, shall include the permitted uses as found in the "HC" Hotel District, Lot 3 shall include permitted uses found in the "0-2" Office District and Lots 2, 4, and 5 shall include the permitted uses as found in "C-2" Local Retail Commercial District of Zoning Ordinance No. 480, as amended, with the following exceptions: Lot 1: "HC" Hotel District uses to also include: • Restaurant and bar which are accessed from an interior lobby • Conference Center totaling 8,380 square feet of meeting and support space Lot 2, 4 & 5: "C-2" Local Retail Commercial District uses limited to: • Restaurant (Bar is a permitted accessory use) • Coffee Shop/ Restaurant (excludes fast food) on Lots 2, 4, & 5 with Drive-Thru Service allowed on Lot 4 only (per Council motion). • Retail • Health & Well Being businesses (massage therapy, fitness, health related products) • Spa Lot 3: "0-2" Office District uses to also include: • Multi -story office buildings up to 4 above grade floors with grade level floor used for parking. • Allow for initial or future parking deck to meet additional parking demands with a parking ratio of 4 spaces per 1000sf. Lot 6: Open Space lot with natural vegetation, existing creek channel, new plantings and detention area. Primary area will serve as a drainage easement. Development Regulations: This property shall be subject to the development regulations for the "HC" Hotel District for Lot 1, the "C-2" Local Retail Commercial District for Lot 2, 4 & 5, and "0-2" Office District for Lot 3 and all other applicable regulations with the following exceptions: • Parking agreements will be in place prior to permitting to satisfy the combined parking requirements for the development. Required parking will be as shown on plan. • To facilitate a contiguous development, buffer yards will not be required along internal boundary lines. 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 0 FAX 817.328.3299 TBPEReg. No. F-1002; www.adams-engineering.com Case No. Attachment G ZA15-032 Page 5 Adams • Given the long runs along portions of the fayade, an overuse of building articulations will distract from a more stream -lined architectural intent. For this reason, articulation will be as shown on the architectural site plan, conceptual floor plans, and exterior elevations. Articulation will be dimensioned on the floor plans for clarity. • Delivery to the property will be scheduled and limited to occur between the hours of 7:00am — 7:00pm daily and trash pick-up will be limited to occur between the hours of 7:00am — 7:00pm Monday — Saturday (must conform to the Contract for Residential and Commercial Refuse and Collection). • The western property line adjacent to the multi -family residential lots will be screened with a vegetated screening of: existing plant material, required plantings within the buffer and additional large shrubs and accent trees planted within the buffer yard. Plantings consisting of both existing and new plant material will achieve a solid screening to 8' in height and will be shown on the landscape plan. • Loading zones are positioned within each lot as shown on plan and in the site data summary chart. • As in internalized development with a shared common access easement and parking the building lines will be allowed as shown on plan. • Vary from each lot fronting a right-of-way to allow the lot configuration as shown on plan • Stacking depths at both the Kimball and Hwy 114 entrance allowed by approval of the attached Variance Request letter. • With the close proximity of the proposed buildings and cross parking layout impervious calculations will vary to allow for an overall impervious area of 70%. Use and Operation The project overview entails a hotel and office development with an out parcel fronting on SH 114 and two internal parcels that will be developed into a mixture of uses to include restaurant, retail, health & well-being and coffee shop with drive-thru. The following is a lot by lot breakdown with the primary emphasis on the Lot 1 Site Plan. Lot 1 (Site Plan Application) Site plan proposes a Cambria Suites `all -suites' hotel with an upscale rating according to Smith Travel Research. Indoor services/ uses to include: • Restaurant with lounge • Bar with on -site alcohol consumption • 175 guest suites (table indicating unit mix and square footages is at the end of this narrative) • Ballroom with partitions for a capacity of 264 people • Administrative office space • Retail sundry space • Conference Center containing 5,100 square feet of meeting space • Business Center • 1,995sf Fitness Center Proposed outdoor services/ uses to include (it should be noted that all patios are interconnected): • Patio containing leisure area with pool, • Patio containing fire pit and dining • Roll -out bar service • Patio for Conference Center spill out 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 0 FAx 817.328.3299 TBPEReg. No. F-1002; www.adams-engineering.com Case No. Attachment G ZA15-032 Page 6 9Adams • Shuttle service to points of interest Exterior Design of the Proposed Cambria Suites Hotel The proposed hotel is four (4) stories in height and totals approximately 118,315 square feet. The footprint of the building is approximately 31,840 square feet, and is 47'-5" to the top of the primary parapet and 59'-3" to the top of the tower structure. The building design is contemporary and includes an identification tower adjacent to the hotel lobby entrance. This tower identifies the hotel from all access points to the site including when approaching the development from the airport. The base of the tower contains a double height hotel lobby while the upper floors contain executive suites. Arrival to the hotel is also signified by a contemporary Porte Cochere which contains an expressive cantilevered structural system consisting of brick piers and a metal clad canopy anchored in place by cable stanchions. The exterior finish materials of the building include brick, stucco, metal and glass. Brick will be used primarily at the towers, along the entire base of the building, at projecting wall frame elements, and in select locations to create additional articulation between building volumes. At the upper floors, at infill walls within the projecting frames, and on all non -street facing elevations (north and west), a stucco finish is proposed. Two colors will be utilized: a medium taupe for the lower portions of the walls and a light tan for the upper floor. Summary of use and operations — Cambria Suites Hotel: The developer proposes to develop a Cambria Suites hotel. The proposed hotel is programmed to have 175 guest suites, a 8,380 square foot Conference Center containing 5,100sf of meeting space, restaurant and bar, fitness center, and pool. The restaurant/ bar operation will consist of a 1,900sf primary dining / lounge space and utilize the outdoor courtyard on select occasions. The restaurant and bar will primarily service hotel guests and adjacent office building tenants, although it will be open to the public as well. A 1,200sf kitchen is positioned in the floor plan to efficiently service the dining area as well as to service the meeting rooms. In addition the hotel courtyard will be well appointed for both a relaxing and vibrant atmosphere with a pool, fireplace and periodic live entertainment. Hotel hours of operation: - Food Service / Restaurant typically opens at 6:00am and closes no Wff earlier than 11:00pm, 7 days a week. - Bar Service typically opens at 10:00am and closes no later than 2:00am Mon -Sat; typically opens at 11:00am and closes no later than 2:00am on Sunday. - Live Music will end no later than 12:00am, 7 days a week. - Outdoor Speakers — sound system will be shut off no later than 12:00 am and any outdoor music will be discontinued no later than 12:00 am, 7 days a week. The proposed conference space is included in the footprint of the hotel and is programmed primarily to host group events such as corporate meetings and social events. The meeting space will have a prominent second entrance for access from the adjacent office buildings. The proposed ballroom is 4,320 square feet and has a programmed capacity of 264. The ballroom will have a large conference patio that connects to the pool area and fire pit. The room is divisible into three break-out rooms of 1,440 square feet each. The program also includes a break-out meeting room containing 468 square feet and has a capacity of 32. The 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 • FAX 817.328.3299 TBPE Reg. No. F-1002; www.adams-engineering.com Case No. Attachment G ZA15-032 Page 7 9Adams program also includes a board room containing 288 square feet and has a capacity of 10. Operationally the hotel will be able to host all size corporate events with activities, leisure, banquets, break-out meetings, dining and lodging. For non -corporate or smaller events the facilities will be available by reservation to rent the ballroom and meeting rooms. Conference space hours of operation: - Normal hours (corporate events) — 9:00am-9:00pm Mon -Sat/ 11:00am-7:00pm Sun - Special event hours — 7:00am-2:00am Mon -Sat/ 11:00am-11:00pm Sun Lot 2 Concept plan proposes an out -parcel lot for a restaurant. • Concept plan is intended to show scale of what can fit on the out -parcel in accordance with the Comprehensive Zoning Ordinance and the SH 114 Corridor overlay. Site data for what is shown in the concept consists of a single story 10,000sf footprint and 63 parking spaces. Also shown is an outdoor waiting area with bar service. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance and the SH 114 Corridor Overlay but should generally conform to the concept plan. • Development will be a restaurant. • Majority of parking requirements shall be provided on -site and the remaining will be subject to a combined parking agreement with the other lots within the development. • Restaurant will have the ability to include an outdoor waiting area with bar service and limited seating. • A 15 X 25 sign easement as shown on the site plan will run with the sale of the property. • The fire lane illustrated along the Lot 2 boundary line and access point to the main entry drive will remain as shown on the Site Plan. Lot 3 Concept plan proposes the development of a three-story office development that could develop as a four- story structure with parking on the ground level or have a parking deck to facilitate future parking demands. • Concept plan is intended to show scale of what can fit on the proposed lot with structure and parking in accordance with the Comprehensive Zoning Ordinance. Site data for what is shown in the concept consists of a three story office building with a 32,000 footprint for a total of 96,000sf and 326 parking spaces. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance but should generally conform to the concept plan. Lot 4 Concept plan proposes the development of a restaurant/ coffee -shop with drive-thru. • Concept plan is intended to show scale of what can fit on the proposed lot in accordance with the Comprehensive Zoning Ordinance. Site data for what is shown in the concept consists of a single story 4,500sf footprint and 52 parking spaces. Also shown is a dedicated drive-thru lane. • Any restaurant use will exclude fast-food franchises. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance but should generally conform to the concept plan. Lot 5 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 9 FAX 817.328.3299 TBPE Reg. No. F-1002; www.adams-engineering.com Case No. Attachment G ZA15-032 Page 8 9Adams Concept plan proposes the development of a restaurant/ retail building. • Concept plan is intended to show scale of what can fit on the proposed lot in accordance with the Comprehensive Zoning Ordinance. Site data for what is shown in the concept consists of a single story 9,222sf footprint and 54 parking spaces. Also shown is ample space for outdoor dining and plaza space. • Development is conceptually proposed to be a multi -tenant structure with uses relative to restaurant, retail and/or health and well-being. Possible health and well-being uses could consist of massage therapy, fitness, spa and health related products and services. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance but should generally conform to the concept plan. • Majority of parking requirements shall be provided on -site and the remaining will be subject to a combined parking agreement with the other lots within the development. Phasing Intent Phasing Intent It is the intent of the developer to move forward with construction documents for the hotel immediately upon Site Plan approval from Council. The entirety of all elements shown on Lot 1 will be part of the construction package and bidding as will the primary drive aisle loop from Hwy 114 to Kimball Ave and the POA lot which includes the detention. The fire lane that is split by the Lot 2 boundary and Lot 3 boundary will be built as well. Lots 2-5 will come on-line as each lot is put under contract. It is unknown at this time what the order of take -down will be. Lot 1 Parking Analysis (Hotel): Parking as shown on the plan includes 211 spaces within Lot 1 and 495 spaces within Lot 2-5 for a total of 706 spaces. Required parking for Lot 1 per the City of Southlake ordinance was calculated as follows: 175 rooms @ 1 per room = 175 spaces - Additional provided for accessory uses = 36 spaces - Bar/ Restaurant (accessory use to the hotel) @ 1/100sf X 1900sf = 19 spaces (25% of spaces required are additional to the hotel use = 5 spaces. The balance 75% is accessory to the hotel and no additional spaces to those allocated to guestrooms are proposed) Meeting space (accessory use to the hotel) @ 1/ 3 seats X 306 seats = 102 required spaces (assumes 15sf per person @ 5,400 sf); 25% of spaces required are additional to the hotel use = 102 X .25 = 26 spaces. The balance 75% is accessory to the hotel and no additional spaces to those allocated to guestrooms are proposed) - Total spaces required = 175 + 5 + 26 = 206 Lot 1 Total = 211 provided spaces 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 a rnx 817.328.3299 TBPE Reg. No. F-1002; www.adams-engineering.com Case No. Attachment G ZA15-032 Page 9 Adams • Given the long runs along portions of the fayade, an overuse of building articulations will distract from a more stream -lined architectural intent. For this reason, articulation will be as shown on the architectural site plan, conceptual floor plans, and exterior elevations. Articulation will be dimensioned on the floor plans for clarity. • Delivery to the property will be scheduled and limited to occur between the hours of 7:00am — 7:00pm daily and trash pick-up will be limited to occur between the hours of 7:00am — 7:00pm Monday — Saturday (must conform to the Contract for Residential and Commercial Refuse and Collection). • The western property line adjacent to the multi -family residential lots will be screened with a vegetated screening of: existing plant material, required plantings within the buffer and additional large shrubs and accent trees planted within the buffer yard. Plantings consisting of both existing and new plant material will achieve a solid screening to 8' in height and will be shown on the landscape plan. • Loading zones are positioned within each lot as shown on plan and in the site data summary chart. • As in internalized development with a shared common access easement and parking the building lines will be allowed as shown on plan. • Vary from each lot fronting a right-of-way to allow the lot configuration as shown on plan • Stacking depths at both the Kimball and Hwy 114 entrance allowed by approval of the attached Variance Request letter. • With the close proximity of the proposed buildings and cross parking layout impervious calculations will vary to allow for an overall impervious area of 70%. Use and Operation The project overview entails a hotel and office development with an out parcel fronting on SH 114 and two internal parcels that will be developed into a mixture of uses to include restaurant, retail, health & well-being and coffee shop with drive-thru. The following is a lot by lot breakdown with the primary emphasis on the Lot 1 Site Plan. Lot 1 (Site Plan Application) Site plan proposes a Cambria Suites `all -suites' hotel with an upscale rating according to Smith Travel Research. Indoor services/ uses to include: • Restaurant with lounge • Bar with on -site alcohol consumption • 175 guest suites (table indicating unit mix and square footages is at the end of this narrative) • Ballroom with partitions for a capacity of 264 people • Administrative office space • Retail sundry space • Conference Center containing 5,100 square feet of meeting space • Business Center • 1,995sf Fitness Center Proposed outdoor services/ uses to include (it should be noted that all patios are interconnected): • Patio containing leisure area with pool, • Patio containing fire pit and dining • Roll -out bar service • Patio for Conference Center spill out 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 0 FAx 817.328.3299 TBPEReg. No. F-1002; www.adams-engineering.com Case No. Attachment G ZA15-032 Page 10 9Adams • Shuttle service to points of interest Exterior Design of the Proposed Cambria Suites Hotel The proposed hotel is four (4) stories in height and totals approximately 118,315 square feet. The footprint of the building is approximately 31,840 square feet, and is 47'-5" to the top of the primary parapet and 59'-3" to the top of the tower structure. The building design is contemporary and includes an identification tower adjacent to the hotel lobby entrance. This tower identifies the hotel from all access points to the site including when approaching the development from the airport. The base of the tower contains a double height hotel lobby while the upper floors contain executive suites. Arrival to the hotel is also signified by a contemporary Porte Cochere which contains an expressive cantilevered structural system consisting of brick piers and a metal clad canopy anchored in place by cable stanchions. The exterior finish materials of the building include brick, stucco, metal and glass. Brick will be used primarily at the towers, along the entire base of the building, at projecting wall frame elements, and in select locations to create additional articulation between building volumes. At the upper floors, at infill walls within the projecting frames, and on all non -street facing elevations (north and west), a stucco finish is proposed. Two colors will be utilized: a medium taupe for the lower portions of the walls and a light tan for the upper floor. Summary of use and operations — Cambria Suites Hotel: The developer proposes to develop a Cambria Suites hotel. The proposed hotel is programmed to have 175 guest suites, a 8,380 square foot Conference Center containing 5,100sf of meeting space, restaurant and bar, fitness center, and pool. The restaurant/ bar operation will consist of a 1,900sf primary dining / lounge space and utilize the outdoor courtyard on select occasions. The restaurant and bar will primarily service hotel guests and adjacent office building tenants, although it will be open to the public as well. A 1,200sf kitchen is positioned in the floor plan to efficiently service the dining area as well as to service the meeting rooms. In addition the hotel courtyard will be well appointed for both a relaxing and vibrant atmosphere with a pool, fireplace and periodic live entertainment. Hotel hours of operation: - Food Service / Restaurant typically opens at 6:00am and closes no Wff earlier than 11:00pm, 7 days a week. - Bar Service typically opens at 10:00am and closes no later than 2:00am Mon -Sat; typically opens at 11:00am and closes no later than 2:00am on Sunday. - Live Music will end no later than 12:00am, 7 days a week. - Outdoor Speakers — sound system will be shut off no later than 12:00 am and any outdoor music will be discontinued no later than 12:00 am, 7 days a week. The proposed conference space is included in the footprint of the hotel and is programmed primarily to host group events such as corporate meetings and social events. The meeting space will have a prominent second entrance for access from the adjacent office buildings. The proposed ballroom is 4,320 square feet and has a programmed capacity of 264. The ballroom will have a large conference patio that connects to the pool area and fire pit. The room is divisible into three break-out rooms of 1,440 square feet each. The program also includes a break-out meeting room containing 468 square feet and has a capacity of 32. The 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 • FAX 817.328.3299 TBPE Reg. No. F-1002; www.adams-engineering.com Case No. Attachment G ZA15-032 Page 11 9Adams program also includes a board room containing 288 square feet and has a capacity of 10. Operationally the hotel will be able to host all size corporate events with activities, leisure, banquets, break-out meetings, dining and lodging. For non -corporate or smaller events the facilities will be available by reservation to rent the ballroom and meeting rooms. Conference space hours of operation: - Normal hours (corporate events) — 9:00am-9:00pm Mon -Sat/ 11:00am-7:00pm Sun - Special event hours — 7:00am-2:00am Mon -Sat/ 11:00am-11:00pm Sun Lot 2 Concept plan proposes an out -parcel lot for a restaurant. • Concept plan is intended to show scale of what can fit on the out -parcel in accordance with the Comprehensive Zoning Ordinance and the SH 114 Corridor overlay. Site data for what is shown in the concept consists of a single story 10,000sf footprint and 63 parking spaces. Also shown is an outdoor waiting area with bar service. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance and the SH 114 Corridor Overlay but should generally conform to the concept plan. • Development will be a restaurant. • Majority of parking requirements shall be provided on -site and the remaining will be subject to a combined parking agreement with the other lots within the development. • Restaurant will have the ability to include an outdoor waiting area with bar service and limited seating. • A 15 X 25 sign easement as shown on the site plan will run with the sale of the property. • The fire lane illustrated along the Lot 2 boundary line and access point to the main entry drive will remain as shown on the Site Plan. Lot 3 Concept plan proposes the development of a three-story office development that could develop as a four- story structure with parking on the ground level or have a parking deck to facilitate future parking demands. • Concept plan is intended to show scale of what can fit on the proposed lot with structure and parking in accordance with the Comprehensive Zoning Ordinance. Site data for what is shown in the concept consists of a three story office building with a 32,000 footprint for a total of 96,000sf and 326 parking spaces. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance but should generally conform to the concept plan. Lot 4 Concept plan proposes the development of a restaurant/ coffee -shop with drive-thru. • Concept plan is intended to show scale of what can fit on the proposed lot in accordance with the Comprehensive Zoning Ordinance. Site data for what is shown in the concept consists of a single story 4,500sf footprint and 52 parking spaces. Also shown is a dedicated drive-thru lane. • Any restaurant use will exclude fast-food franchises. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance but should generally conform to the concept plan. Lot 5 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 9 FAX 817.328.3299 TBPE Reg. No. F-1002; www.adams-engineering.com Case No. Attachment G ZA15-032 Page 12 9Adams Concept plan proposes the development of a restaurant/ retail building. • Concept plan is intended to show scale of what can fit on the proposed lot in accordance with the Comprehensive Zoning Ordinance. Site data for what is shown in the concept consists of a single story 9,222sf footprint and 54 parking spaces. Also shown is ample space for outdoor dining and plaza space. • Development is conceptually proposed to be a multi -tenant structure with uses relative to restaurant, retail and/or health and well-being. Possible health and well-being uses could consist of massage therapy, fitness, spa and health related products and services. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance but should generally conform to the concept plan. • Majority of parking requirements shall be provided on -site and the remaining will be subject to a combined parking agreement with the other lots within the development. Phasing Intent Phasing Intent It is the intent of the developer to move forward with construction documents for the hotel immediately upon Site Plan approval from Council. The entirety of all elements shown on Lot 1 will be part of the construction package and bidding as will the primary drive aisle loop from Hwy 114 to Kimball Ave and the POA lot which includes the detention. The fire lane that is split by the Lot 2 boundary and Lot 3 boundary will be built as well. Lots 2-5 will come on-line as each lot is put under contract. It is unknown at this time what the order of take -down will be. Lot 1 Parking Analysis (Hotel): Parking as shown on the plan includes 211 spaces within Lot 1 and 495 spaces within Lot 2-5 for a total of 706 spaces. Required parking for Lot 1 per the City of Southlake ordinance was calculated as follows: 175 rooms @ 1 per room = 175 spaces - Additional provided for accessory uses = 36 spaces - Bar/ Restaurant (accessory use to the hotel) @ 1/100sf X 1900sf = 19 spaces (25% of spaces required are additional to the hotel use = 5 spaces. The balance 75% is accessory to the hotel and no additional spaces to those allocated to guestrooms are proposed) Meeting space (accessory use to the hotel) @ 1/ 3 seats X 306 seats = 102 required spaces (assumes 15sf per person @ 5,400 sf); 25% of spaces required are additional to the hotel use = 102 X .25 = 26 spaces. The balance 75% is accessory to the hotel and no additional spaces to those allocated to guestrooms are proposed) - Total spaces required = 175 + 5 + 26 = 206 Lot 1 Total = 211 provided spaces 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 e rnx 817.328.3299 TBPE Reg. No. F-1002; www.adams-engineering.com Case No. Attachment G ZA15-032 Page 13 DAdams January 3, 2014 City of Southlake Department of Planning & Development Services 1400 Main Street, Suite 310 Southlake, TX 76092 Re: Request for Variances Kimball Park Addition Lots 1 thru 6 ACEI Project No: 2012.156 This request for variances is to address lot frontage on a public or private street and the stacking distance at driveways into the property. The Southlake Ordinance No. 483, Section 8.01(A) requires that every lot front on a public or private street. As a contiguous development that extends deep off of Hwy 114 and will have a mixture of uses on individual lots it is requested that a variance be granted to allow the lot configuration as shown on plan. The Southlake Driveway Ordinance No. 634 requires a stacking depth of 150 feet from the adjacent R.O.W. to the nearest parking stall or intersecting drive lane pavement edge within the property. The adjoining parcels along Kimball Ave. and Hwy 114 are controlling the location of the cross access intersection and thus setting the stacking distance. Refer to the site plan submitted to illustrate both driveways and common access points. The adjacent property along Hwy 114, Lot 7R, Block 1 Mesco Addition, was approved by the City of Southlake zoning case ZA96-109. The concept plan in this zoning case includes a common access driveway/easement approximately 34 feet outside the HWY 114 R.O.W. The Kimball Park site plan allows for approximately 34 feet of stacking distance in the driveway from HWY 114 due to this approved common access driveway. The adjacent property along Kimball Ave., Lot 1, Block 1 Mesco Addition, has two existing drives paralleling Kimball approximately 17 feet and 102 feet outside the Kimball R.O.W. The Kimball Park site plan allows connection to both of these existing drives which forces a stacking distance less that the required 150 feet. We herein request a lot fronting on public or private street variance and a driveway stacking distance variance for both Kimball Park driveways. Thank you for your time and consideration regarding this issue. Please do not hesitate to contact us regarding any questions, Sincerely, Jimmy Fechter, RLA Project Manager Adams — Engineering and Development Consultants 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 0 FAx 817.328.3299 TBPGReg. No. F-1002; irn-ir.adanis-engineerriig.cam Case No. Attachment G ZA15-032 Page 14 S-P-2 Regulations for Ordinance No. 480-657a DA&ms April 15, 2)015 Kimball Park Proposed Permitted Uses and Development Regulations for "S-P-2" Zoning PermittP.d TTCP.C' This property is divided into six lots. Lot 1, consisting of 3.59 acres, shall include the permitted uses as found in the "HC" Hotel District, Lot 3 shall include permitted uses found in the "0-2" Office District and Lots 2, 4, and 5 shall include the permitted uses as found in "C-2" Local Retail Commercial District of Zoning Ordinance No. 480, as amended, with the following exceptions: Lot 1: "HC" Hotel District uses to also include: • Restaurant and bar which are accessed from an interior lobby • Conference Center totaling 8,738 square feet of meeting and support space that includes the ballroom, board room, meeting room, pre -function area and storage. Lot 2, 4 & 5: "C-2" Local Retail Commercial District uses limited to: • Restaurant (Bar is a permitted accessory use) • Coffee Shop/ Restaurant with Drive-Thru Service on Lot 4 only (excludes fast food) • Retail • Health & Well Being businesses (massage therapy, fitness, health related products) • Spa Lot 3: "0-2" Office District uses to also include: • Multi -story office buildings up to 4 above grade floors with grade level floor used for parking. • Allow for initial or future parking deck to meet additional parking demands with a parking ratio of 4 spaces per 1000sf. Lot 6: Open Space lot with natural vegetation, existing creek channel, new plantings and detention area. Primary area will serve as a drainage easement. Development Regulations: This property shall be subject to the development regulations for the "HC" Hotel District for Lot 1, the "C-2" Local Retail Commercial District for Lot 2, 4 & 5, and "0-2" Office District for Lot 3 and all other applicable regulations with the following exceptions: • Parking agreements will be in place prior to permitting to satisfy the combined parking requirements for the development. Required parking will be as shown on plan. • To facilitate a contiguous development, buffer yards will not be required along internal boundary lines. 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 • FAX 817.329.3299 TBPE Reg. No. F-1002; www.adams-engineering.com Case No. Attachment G ZA15-032 Page 15 • Given the long runs along portions of the fagade, an overuse of building articulations will distract from a more stream -lined architectural intent. For this reason, articulation for Lot 1 will be as shown on the architectural site plan, conceptual floor plans, and exterior elevations. Articulation will be dimensioned on the floor plans for clarity. • Delivery to the property will be scheduled and limited to occur between the hours of 7:OOam — 7:00pm daily and trash pick-up will be limited to occur between the hours of 7:OOam — 7:00pm Monday — Saturday (must conform to the Contract for Residential and Commercial Refuse and Collection). • The western property line adjacent to the multi -family residential lots will be screened with a vegetated screening of. existing plant material, required plantings within the buffer and additional large shrubs and accent trees planted within the buffer yard. Plantings consisting of both existing and new plant material will achieve a solid screening to 8' in height and will be shown on the landscape plan. • Loading zones are positioned within each lot as shown on plan and in the site data summary chart. • As in internalized development with a shared common access easement and parking the building lines will be allowed as shown on plan. • Vary from each lot fronting a right-of-way to allow the lot configuration as shown on plan • Stacking depths at both the Kimball and Hwy 114 entrance allowed by approval of the attached Variance Request letter. • With the close proximity of the proposed buildings and cross parking layout impervious calculations will vary to allow for an overall impervious area of 70%. Use and Operation The project overview entails a hotel and office development with an out parcel fronting on SH 114 and two internal parcels that will be developed into a mixture of uses to include restaurant, retail, health & well-being and coffee shop with drive-thru. The following is a lot by lot breakdown with the primary emphasis on the Lot 1 Site Plan. Lot 1 (Site Plan Application) Site plan proposes a Cambria Suites `all -suites' hotel with an upscale rating according to Smith Travel Research. Indoor services/ uses to include: • Restaurant with lounge • Bar with on -site alcohol consumption • 175 guest suites • Ballroom with partitions for a capacity of approximately 307 people • Administrative office space • Retail sundry space • 8,738 sf Conference Center that contains 5,079 sf of meeting space • Business Center • 1,061 sf Fitness Center Proposed outdoor services/ uses to include (it should be noted that all patios are interconnected): • Patio containing leisure area with pool, • Patio containing fire pit and dining • Roll -out bar service • Patio for Conference Center spill out 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 • FAx 817.328.3299 WE Reg. No. F-1002; www.adams-engineering.com Case NO. Attacnment G ZA15-032 Page 16 9Adams • Shuttle service to points of interest Exterior Design of the Proposed Cambria Suites Hotel The proposed hotel is four (4) stories in height and totals approximately 111,897 square feet. The footprint of the building is approximately 29,514 square feet, and is 5l'-0" to the top of the primary parapet and 59'-4" to the top of the tower structure. The building design is contemporary and includes an identification tower adjacent to the hotel lobby entrance. This tower identifies the hotel from all access points to the site including when approaching the development from the airport. The base of the tower contains a single height hotel lobby while the upper floors contain executive suites. Arrival to the hotel is also signified by a contemporary Porte Cochere which contains an expressive cantilevered structural system consisting of brick piers and a clear polycarbonate clad canopy anchored in place by cable stanchions. The exterior finish materials of the building include brick, stucco, metal and glass. Brick will be used primarily at the towers, along the entire base of the building, at projecting wall frame elements, and in select locations to create additional articulation between building volumes. At the upper floors, at infill walls within the projecting frames, and on all non -street facing elevations (north and west), a stucco finish is proposed. Two colors will be utilized: a medium taupe for the lower portions of the walls and a light tan for the upper floor. Summary of use and operations — Cambria Suites Hotel: The developer proposes to develop a Cambria Suites hotel. The proposed hotel is programmed to have 175 guest suites, a 8,738 square foot Conference Center containing 5,079 sf of meeting space, restaurant and bar, fitness center, and pool. The restaurant/ bar operation will consist of approximately 2,700 primary dining / lounge space and utilize the outdoor courtyard on select occasions. The restaurant and bar will primarily service hotel guests and adjacent office building tenants, although it will be open to the public as well. A 920 sf kitchen is positioned in the floor plan to efficiently service the dining area as well as to service the meeting rooms. In addition the hotel courtyard will be well appointed for both a relaxing and vibrant atmosphere with a pool, fireplace and periodic live entertainment. Hotel hours of operation: - Food Service / Restaurant typically opens at 6:00am and closes no later than 11:00pm, 7 days a week. - Bar Service typically opens at 10:00am and closes no later than 2:00am Mon -Sat; typically opens at 11:00am and closes no later than 2:00am on Sunday. - Live Music will end no later than 12:00am, 7 days a week. - Outdoor Speakers — sound system will be shut off no later than 12:00 am and any outdoor music will be discontinued no later than 12:00 am, 7 days a week. The proposed conference space is included in the footprint of the hotel and is programmed primarily to host group events such as corporate meetings and social events. The meeting space will have a prominent second entrance for access from the adjacent office buildings. The proposed ballroom is 4,116 square feet and has a programmed capacity of 307. The ballroom will have a large conference patio that connects to the pool area and fire pit. The room is divisible into three break-out rooms of approximately 1,350 square feet each. The program also includes a break-out meeting room containing 456 square feet and has a 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 • Prix 817.328.3299 TBPE Reg. No. F-1002; www.adams-engineering.com Case No. Attachment G ZA15-032 Page 17 9Adams capacity of 27. The program also includes a board room containing 507 square feet and has a capacity of 14. Operationally the hotel will be able to host all size corporate events with activities, leisure, banquets, break-out meetings, dining and lodging. For non -corporate or smaller events the facilities will be available by reservation to rent the ballroom and meeting rooms. Conference space hours of operation: - Normal hours (corporate events) — 9:00am-9:00pm Mon -Sat/ 11:00am-7:00pm Sun - Special event hours — 7:00am-2:00am Mon -Sat/ 11:00am-11:00pm Sun Lot 2 Concept plan proposes an out -parcel lot for a restaurant. • Concept plan is intended to show scale of what can fit on the out -parcel in accordance with the Comprehensive Zoning Ordinance and the SH 114 Corridor overlay. Site data for what is shown in the concept consists of a single story 10,000sf footprint and 63 parking spaces. Also shown is an outdoor waiting area with bar service. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance and the SH 114 Corridor Overlay but should generally conform to the concept plan. • Development will be a restaurant. • Majority of parking requirements shall be provided on -site and the remaining will be subject to a combined parking agreement with the other lots within the development. • Restaurant will have the ability to include an outdoor waiting area with bar service and limited seating. • A 15 X 25 sign easement as shown on the site plan will run with the sale of the property. • The fire lane illustrated along the Lot 2 boundary line and access point to the main entry drive will remain as shown on the Site Plan. Lot 3 Concept plan proposes the development of a three-story office development that could develop as a four- story structure with parking on the ground level or have a parking deck to facilitate future parking demands. • Concept plan is intended to show scale of what can fit on the proposed lot with structure and parking in accordance with the Comprehensive Zoning Ordinance. Site data for what is shown in the concept consists of a three story office building with a 32,000 footprint for a total of 96,000sf and 326 parking spaces. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance but should generally conform to the concept plan. Lot 4 Concept plan proposes the development of a restaurant/ coffee -shop with drive-thru. • Concept plan is intended to show scale of what can fit on the proposed lot in accordance with the Comprehensive Zoning Ordinance. Site data for what is shown in the concept consists of a single story 4,500sf footprint and 52 parking spaces. Also shown is a dedicated drive-thru lane. • Any restaurant use will exclude fast-food franchises. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance but should generally conform to the concept plan. Lot 5 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 0 FAx 817.328.3299 TBPE Reg. No. F-1002; www.adams-engineering.com Case No. Attachment G ZA15-032 Page 18 Concept plan proposes the development of a restaurant/ retail building. • Concept plan is intended to show scale of what can fit on the proposed lot in accordance with the Comprehensive Zoning Ordinance. Site data for what is shown in the concept consists of a single story 9,222sf footprint and 54 parking spaces. Also shown is ample space for outdoor dining and plaza space. • Development is conceptually proposed to be a multi -tenant structure with uses relative to restaurant, retail and/or health and well-being. Possible health and well-being uses could consist of massage therapy, fitness, spa and health related products and services. • Ultimate site plan will consist of what fits within the parameters of the Comprehensive Zoning Ordinance but should generally conform to the concept plan. • Majority of parking requirements shall be provided on -site and the remaining will be subject to a combined parking agreement with the other lots within the development. Phasing Intent Phasing Intent It is the intent of the developer to move forward with construction documents for the hotel immediately upon Site Plan approval from Council. The entirety of all elements shown on Lot 1 will be part of the construction package and bidding as will the primary drive aisle loop from Hwy 114 to Kimball Ave and the POA lot which includes the detention. The fire lane that is split by the Lot 2 boundary and Lot 3 boundary will be built as well. Lots 2-5 will come on-line as each lot is put under contract. It is unknown at this time what the order of take -down will be. Lot 1 Parking Analysis (Hotel Parking as shown on the plan includes 211 spaces within Lot 1 and 495 spaces within Lot 2-5 for a total of 706 spaces. Required parking for Lot 1 per the City of Southlake ordinance was calculated as follows: - 175 rooms @ 1 per room =175 spaces - Additional provided for accessory uses = 36 spaces - Bar/ Restaurant (accessory use to the hotel) @ 1/100sf X approx 2,700sf = 28 spaces (25% of spaces required are additional to the hotel use = 7 spaces. The balance 75% is accessory to the hotel and no additional spaces to those allocated to guestrooms are proposed) - Meeting space (accessory use to the hotel) @ 1/ 3 seats X 348 seats = 116 required spaces from occupant load calcs; 25% of spaces required are additional to the hotel use = 116 X .25 = 29 spaces. The balance 75% is accessory to the hotel and no additional spaces to those allocated to guestrooms are proposed) - Total spaces required =175 + 7 + 29 = 211 Lot 1 Total = 211 provided spaces 910 S. Kimball Avenue • Southlake, Texas 76092 817.328.3200 0 FAX 817.328.3299 TBPEReg. No. F-1002; www.adams-engineering.com Case No. Attachment G ZA15-032 Page 19 Council Motion at 1st Reading of Ordinance No. 480-65T February 18, 2014; Approved (6-1) subject to the following stipulations: approving the requested variances for driveway stacking depth and the Subdivision Ordinance requirement that lots front on a public or private street to allow the lots to be configured as shown; Concept Plan Review Summary No. 3, dated February 11, 2014; understanding that the applicant must come forward before the second reading with the following matters to be appropriately detailed and discussed (1) detailed entry feature on front southeast corner of the hotel, which may include fountains, landscape islands and detailed renderings of such, (2) detailed landscape plan, to include detailed plant material for Lot 6 to show how landscaping can be incorporated within federal requirements to not disturb the floodway, (3) discussion of the property owners agreement and how that may work regarding the project, (4) detailed floor plans, more specifically the first floor plan and within that floor plan a detail of outdoor public spaces and how those will be incorporated into the hotel, (5) also regarding Lot 6, noting what can be manicured and what type of periodic maintenance can be provided within the floodway in connection with landscape detail for Lot 6 and also provide detailed plant material for the entire project, and (6) detailed renderings for convention center from the Kimball approach which would include the traffic circle. Council Motion at 2nd Reading of Ordinance No. 480-65T March 4, 2014; Approved at 2nd reading (6-1) pursuant to the following: 1. Approving requested variances —driveway and minimum required stacking and Subdivision Ordinance 483, Section 8.01(A), as amended, which requires every lotto be on a public or private street and as requested to allow the lots to be configured as shown on the revised concept plan; 2. Also noting the requirements under this motion are pursuant to: a. the revised renderings that were presented to Council this evening; b. the Declaration of Covenants, Restrictions, and easements (CCR) as presented to Council in the application this evening; c. the revised landscape plan presented to Council (included in Attachment "B" of this Ordinance); d. the revised permitted uses, as presented from Adams Engineering in their letter dated March 4, 2014, noting that the drive -through service will only be allowed for Lot 4 (correction made in S-P-2 regulations); e. also noting the balance of the concept plan for the buildings that are not included in this site plan approval that it is Council's expectation there will be 100% masonry construction; f. the permitted uses represented from Adams Engineering that the food service hours of operations as noted in the application that "they will close no later than 11.00 p.m." that it is Council's intention to have wording that mentions that it will be "no earlier than 11.00 p.m. (correction made in S-P-2 regulations); Case No. Attachment G ZA15-032 Page 20 g. the office building in the concept plan will be a four story construction and that additional parking will be presented on the first level underneath the building; h. pursuant to the revised concept/site plan as presented this evening and (included in Attachment "B" of this Ordinance); 3. Concept Plan Review Summary No. 3, dated February 26, 2014: 2. Please make the following changes the Concept and/or Site Plans: a. Show, label and dimension the width of the R.O.W. adjacent to the site. b. One 10' x 50' loading space is required for the hotel and that space is provided on the west side of the building. Staff recommends adding a loading space on the east side of the building adjacent to the bar and restaurant or show how deliveries to the kitchen and bar area will be made. C. Subdivision Ordinance No. 483, Section 8.01(A), as amended, requires that every lot front on a public or a private street. Council approval of a variance will be required to allow the lot configuration as shown. A variance was granted by City Council. 3. Please move the S-P-2 regulation regarding building articulation to the section for Lot 1. The way the regulation is written, all future buildings would be allowed to not meet the articulation requirements before City Council has a chance to see the proposed elevations (corrected in the S-P- 2 regulations). 4. Revise the parking provided for Lot 1 in the Site Data Summary Chart on the Concept Plan to 212 spaces. 5. Revise the office square footage in the first paragraph of Section 2.2 of the TIA (48,000 s.f. should be 96,000 s.f.). The square footage is correctly shown in Table 1 —Trip Generation Summary just below the paragraph. 6. Please make the following changes with regard to easements: a. Label the existing common access easement on Lots 6R and 7R, Block 1, Mesco Addition as shown on the plat recorded as Instrument No. D211037987, Plat Records, Tarrant County, Texas. 7. All driveways/points of ingess/egress must comply with the Driveway Ordinance No. 634, as amended). The following changes are needed: a. The proposed driveway onto E. SH 114 does not meet the minimum 250 feet of spacing (60 feet shown) from an approved driveway and common access easement located on Lot 7R, Block 1, Mesco Addition (case ZA96- Case No. Attachment G ZA15-032 Page 21 109). The driveway/common access easement on Lot 7R1, Block 1 is labeled to be abandoned. Prior to issuance of a permit for the proposed driveway on SH 114, a copy of the executed and recorded instrument(s) for the off -site and on -site common access easements and agreement to abandon the common access easement and driveway on the approved Lot 7R, Block 1, Mesco Addition (case ZA96-109) must be provided. 8. Revise the renderings and/or the Concept and Site Plans so that the landscaped and sidewalk areas adjacent to the hotel entrance match. The renderings are showing a landscaped area where a paved area is shown on the Concept and Site Plans. Tree Conservation Comments: 1. The submitted Development Regulations propose that the western property line adjacent to the multi -family residential lots will be screened with a vegetated screening of: existing plant material, required plantings within the buffer and additional large shrubs and accent trees planted within the bufferyard. There are a significant amount of existing trees and associated vegetation along the west and north property lines. Identify these trees and designate if they will be preserved, removed, considered marginal, and show how the proposed west bufferyard landscaping will be integrated with the existing vegetation. 2. The Preliminary Grading Plan shows that the McPherson Branch Creek on Lot 6 is proposed to be graded and improved. There is one large Post Oak tree on the back of Lot 7R, Block 1, Mesco Addition that might be on the Kimball Park, Lot 6 property. The proposed grading and south access drive look like they may alter the existing tree. Please locate and identify this tree on the submitted plans. Interior Landscape and Bufferyard Comments: 1. Some of the parking lot islands measure less than 12' in width from back -of -curb to back -of -curb. Parking lot islands shall have a minimum width of 12' back-to-back if curbed or 13' edge -to -edge if no curb is intended, and shall be equal to the length of the parking stall. 2. No bufferyard is proposed along the east property line of Lot 6 in the Summary Chart, but a bufferyard is shown on the concept plan. The east bufferyard along the east property line of Lot 6 is required to be a 5' — A, adjacent to the commercial and office properties , and a 10' — E along North Kimball Avenue. Include an S-P-2 regulation if a bufferyard will not be provided. 3. Some of the Bufferyards on the Concept Plan and the Bufferyard Summary Charts do not match. 1. Lot 3, west bufferyard is required to be a 10'— B, and is labeled 10' — C on the Concept Plan, and 5' —A in the Bufferyard Summary Chart. 4. The parking lot landscape islands are required to contain at least the minimum of the required canopy tree as shown along with shrubs, Case No. Attachment G ZA15-032 Page 22 ground cover, ornamental grasses, seasonal color or a combination of these plant materials. Turf grass is not acceptable vegetation within the parking lot landscape islands. Public Works/Engineering Review General Comments: 1. Please provide an updated traffic impact analysis. Preliminary Utility Comments: 7. No 900 bends, use 2-450 bends. 8. All waterlines to be public and in easements. 9. 12" waterline not on the City's Master Water Plan, therefore no city participation in upsizing. 10. Any sanitary sewer lines crossing lot lines will need to be public and contained in easements. 11. Extend SS-1 west to property line. 12. Extend SS-4 to west property line. Planning and Zoning Commission Motion for Ordinance No. 480-657a: April 23, 2015; Approved (5-0) subject to Site Plan Review Summary No. 1, dated April 16, 2015, subject to the following: 1. Staff report dated April 17, 2015, approving each of the proposed changes as presented; 2. Noting for the record the applicant's willingness to get with Commissioner Springerto explore alternate options to the louver window issue and cooling towers; 3. Noting the applicant's willingness prior to coming to Council to prepare a rendering of the entryway so they can see the difference between the approved two story height versus the twelve foot height that is being proposed; 4. Noting the applicant's willingness to try to match the proposed entry feature at the front of the hotel with the entry at the conference center entrance. SECTION 2. That the City Manager is hereby directed to correct the Official Zoning map of the City of Southlake, Texas, to reflect the herein changes in zoning. SECTION 3. That in all other respects the use of the tract or tracts of land herein above described shall be subject to all the applicable regulations contained in said Zoning Ordinance and all other applicable and pertinent ordinances for the City of Southlake, Texas. All existing sections, Case No. Attachment G ZA15-032 Page 23 subsections, paragraphs, sentences, words, phrases and definitions of said Zoning Ordinance are not amended hereby, but remain intact and are hereby ratified, verified, and affirmed. SECTION 4. That the zoning regulations and districts as herein established have been made in accordance with the comprehensive plan for the purpose of promoting the health, safety, morals and the general welfare of the community. They have been designed, with respect to both present conditions and the conditions reasonably anticipated to exist in the foreseeable future; to lessen congestion in the streets; to provide adequate light and air; to prevent over -crowding of land; to avoid undue concentration of population; and to facilitate the adequate provision of transportation, water, sewerage, drainage and surface water, parks and other commercial needs and development of the community. They have been made after a full and complete hearing with reasonable consideration among other things of the character of the district and its peculiar suitability for the particular uses and with a view of conserving the value of buildings and encouraging the most appropriate use of land throughout the community. SECTION 5. That this ordinance shall be cumulative of all other ordinances of the City of Southlake, Texas, affecting zoning and shall not repeal any of the provisions of said ordinances except in those instances where provisions of those ordinances are in direct conflict with the provisions of this ordinance. SECTION 6. That the terms and provisions of this ordinance shall be deemed to be severable and that if the validity of the zoning affecting any portion of the tract or tracts of land described herein shall be declared to be invalid, the same shall not affect the validity of the zoning of the balance of said tract or tracts of land described herein. Case No. Attachment G ZA15-032 Page 24 SECTION 7. Any person, firm or corporation who violates, disobeys, omits, neglects or refuses to comply with or who resists the enforcement of any of the provisions of this ordinance shall be fined not more than Two Thousand Dollars ($2,000.00) for each offense. Each day that a violation is permitted to exist shall constitute a separate offense. SECTION 8. All rights and remedies of the City of Southlake are expressly saved as to any and all violations of the provisions of Ordinance No. 480, as amended, or any other ordinances affecting zoning which have accrued at the time of the effective date of this ordinance; and, as to such accrued violations and all pending litigation, both civil and criminal, whether pending in court or not, under such ordinances, same shall not be affected by this ordinance but may be prosecuted until final disposition by the courts. SECTION 9. The City Secretary of the City of Southlake is hereby directed to post the proposed ordinance in its entirety on the City website together with a notice setting out the time and place for a public hearing thereon at least ten (10) days before the second reading of this ordinance, and if this ordinance provides for the imposition of any penalty, fine or forfeiture for any violation of any of its provisions, then the City Secretary shall additionally publish this ordinance in the official City newspaper one time within ten (10) days after passage of this ordinance, as required by Section 3.13 of the Charter of the City of Southlake. SECTION 10. This ordinance shall be in full force and effect from and after its passage and publication as required by law, and it is so ordained. Case No. Attachment G ZA15-032 Page 25 PASSED AND APPROVED on the 1st reading the day of , 2015. MAYOR ATTEST: CITY SECRETARY PASSED AND APPROVED on the 2nd reading the day of , 2015. MAYOR ATTEST: CITY SECRETARY APPROVED AS TO FORM AND LEGALITY: CITY ATTORNEY DATE: ADOPTED: EFFECTIVE: Case No. Attachment G ZA15-032 Page 26 EXHIBIT "A" Being described as Tracts 3A1A and 3A2A, Thomas Mahan Survey, Abstract No. 1049, City of Southlake, Tarrant County, Texas, being approximately 15.518 acres, and more fully and completely described below: LEGAL DESCRIPTION BEING a parcel of land located in the City of Southlake, Tarrant County, Texas, a part of the Thomas Mahan Survey, Abstract Number 1049, and being a part of that tract of land described in a special warranty to NCI Group, Inc. as recorded in Document Number D208018532, Tarrant County Deed Records, and being further described as follows: BEGINNING at a 4-inch pipe fence post found at the northwest comer of said NCI tract of land, said point being in the east line of Briarwood Estates, Phase I, an addition to the City of Southlake as recorded in Volume 388-139, Page 7, Tarrant County Plat Records said point being the southwest comer of Rodgers Addition, an addition to the City of Southlake as recorded in Cabinet A, Slide 3538, Tarrant County Plat Records; THENCE along the north line of said NCI tract of land and along the south line of said Rodgers Addition as follows: South 88 degrees 50 minutes 10 seconds East, 311.90 feet to a one-half inch iron rod found for comer; South 89 degrees 49 minutes 28 seconds East, 55.61 feet to a five -eighths inch iron rod found at the most northerly northeast comer of said NCI tract, said point being the northwest comer of Lot 1, Block 1, Mesco Addition, an addition to the City of Southlake as recorded in Cabinet A, Slide 3232, Tarrant County Plat Records; THENCE South 01 degrees 30 minutes 55 seconds West, 511.41 feet to a one-half inch iron rod found at the southwest comer of said Lot 1; THENCE North 83 degrees 56 minutes 10 seconds East, 152.74 feet along the south line of said Lot 1 to a "X" in a concrete driveway set for comer in the west right-of-way line of North Kimball Avenue (a variable width right-of-way); THENCE along the west right-of-way line of North Kimball Avenue as follows: South 00 degrees 01 minutes 01 seconds East, 206.36 feet to a one-half inch iron rod set for comer, Southwesterly, 64.71 feet along a curve to the right which has a central angle of 02 degrees 43 minutes 48 seconds, a radius of 1358.00 feet, a tangent of 32.36 feet and whose chord bears South 01 degrees 20 minutes 53 seconds West, 64.70 feet to a one-half inch iron rod set for comer; Suuthwesterly, 45.30 feet along a curve to the left which has a central angle of 01 degrees 47 minutes 59 seconds, a radius of 1442.00 feet, a tangent of 22.65 feet, and whose chord bears South 01 degrees 48 minutes 53 seconds West, 45.30 feet to a one-half inch iron rod set for comer in the north line of that tract of land described in a special warranty deed JTE Investments, Ltd. and Charles W. Anderson as recorded in Volume 15405, Page 216, Tarrant County Deed Records; THENCE South 89 degrees 59 minutes 17 seconds West, 113.94 feet to a one-half inch iron rod found at the northwest comer of said JTE tract of land; THENCE South 21 degrees 40 minutes 10 seconds West, 281.86 feet to a one-half inch iron rod found for comer in the west line of Lot 4, Block 1, Mesco Addition, an addition to the City of Southlake as recorded in Cabinet A, Slide 3619, Tarrant County Plat Records; THENCE Southwesterly, 101.86 feet along a curve to the right which has a central angle of 58 degrees 21 minutes 34 seconds, a radius of 100.00 feet, a tangent of 55.84 feet, whose chord bears South 50 degrees 51 minutes 00 seconds West, 97.51 feet to a one-half Inch iron rod found for comer in the north line of Lot 6R, Block 1, Mesco Addition, an addition to the City of Southlake as recorded in Document Number D211037987, Tarrant County Plat Records; THENCE South 80 degrees 01 minutes 50 seconds West, 106.45 feet to a one-half inch iron rod found for comer in the north line of Lot 7R, Block 1, Mesco Addition, an addition to the City of Southlake as recorded in Document Case No. Attachment G ZA15-032 Page 27 Number D211037987, Tarrant County Plat Records; THENCE along the north and west line of said Lot 7R as follows: Southwesterly, 17.53 feet along a curve to the left which has a central angle of 20 degrees 05 minutes 15 seconds, a radius of 50.00 feet, a tangent of 8.86 feet, whose chord bears South 69 degrees 59 minutes 07 seconds West, 17.44 feet to a one-half inch iron rod found for comer; South 59 degrees 56 minutes 25 seconds West, 103.21 feet to a one-half inch Iron rod found for comer; Southwesterly, 97.68 feet along a curve to the left which has a central angle of 55 degrees 57 minutes 53 seconds, a radius of 100.00 feet, a tangent of 53.13 feet, whose chord bears South 31 degrees 57 minutes 26 seconds West, 93.84 feet to a point in a drainage ditch for comer: South 03 degrees 58 minutes 27 seconds West, 59.17 feet to a point in a drainage ditch at the southwest comer of said Lot 7R, said point being in the north right-of-way of State Highway 114 (a variable width right-of-way); THENCE North 85 degrees 59 minutes 38 seconds West, 145.01 feet along the north right-of-way line of State Highway 114 to a one-half inch iron rod found for corner in the west line of said NCI tract of land and in the east line of said Briarwood Estates, Phase 1; THENCE along the west line of said NCI tract of land and along the east line of said Briarwood Estates, Phase 1 as follows: North 00 degrees 26 minutes 10 seconds West, 850.14 feet to a five -eighths inch iron rod found for comer; North 04 degrees 28 minutes 13 seconds East, 102.90 feet to a five -eighths inch iron rod found for comer; North 26 degrees 44 minutes 15 seconds East, 440.44 feet to the POINT OF BEGINNING and containing 675,965 square feet or 15.518 acres of land. Case No. Attachment G ZA15-032 Page 28 EXHIBIT "B" Reserved for approved plans Case No. Attachment G ZA15-032 Page 29