Item 4BCITY OF SOUTHLAKI MEMORANDUM (May 19, 2015) To: Shana Yelverton, City Manager From: Robert H. Price, P.E., Public Works Director Item 413 Subject: Award construction contract to Pavecon Public Works LP for the Brumlow Avenue Widening Improvements project in an amount not to exceed $680,000 Action Requested: Award construction contract to Pavecon Public Works LP for the Brumlow Avenue Widening Improvements project in an amount not to exceed $680,000 Background Information: Roadway construction of SH 26 is ongoing and TxDOT is constructing northbound dual left turn lanes on eastbound SH 26 at Brumlow Avenue. The City of Grapevine has also constructed an additional free right -turn lane at northbound Pool Road and SH 26, resulting in two through lanes feeding directly into Brumlow Avenue located within the city of Southlake. The existing configuration of Brumlow Avenue does not include the required transition length on the north side of the intersection to accept two through lanes of traffic. This construction contract for the Brumlow Avenue Widening Improvements project will include widening of Brumlow Avenue to 4 lanes with a center dual turn lane which extends approximately 1,400 feet between SH26 and the Alpine Materials driveway. The construction will also include additional transition improvements which will allow for the necessary two through lanes of traffic from westbound SH26 and northbound Pool Road. The proposed improvement will relieve traffic congestion in the AM (>500 vehicles) and PM (>800 vehicles) peaks, add capacity and utilize the newly constructed improvements made by TxDOT and City of Grapevine. On the City's Master Thoroughfare Plan, Brumlow Avenue is proposed as a 4-lane divided roadway with 100 feet of right of way; however, the construction of the section of Brumlow Avenue between SH 26 and the Brumlow Avenue/North Carroll Avenue/Continental Blvd. roundabout is not in the city's approved five year Capital Improvement Plan. Two (2) bids were received on April 28, 2015. The bids have been reviewed by the consulting engineer and the City Staff and are tabulated as follow: BIDDER BID AMOUNT Pavecon Public Works LP $646,708.25 Stabile & Winn, Inc. $738,599.80 The above bid amount does not contain any project contingency. The Public Works staff is requesting authorization of an amount not to exceed $680,000 (includes approximately 5% of construction cost as a project contingency) to cover unforeseen issues that may arise during the construction phase of the project. Attached to this memorandum submitted for your consideration is a letter from the consulting engineer recommending award of this contract to Pavecon Public Works LP. The construction is anticipated to begin in early June 2015 with 180 calendar days in the contract for completion of the construction. Timing for the award of this contract and beginning of construction of these improvements was planned for the summer months where there is limited or minimal school traffic. Two lanes of traffic (one lane in each direction) are proposed to be maintained throughout construction. In addition, once the construction of the project is complete under this contract, Public Works staff will work with the Community Services staff to landscape the east side of Brumlow Avenue adjacent to the Fuel Farm to improve the aesthetic appearance of this entry into the city. Funds are available for this landscaping work in the previously authorized budgeted funds for this project. Financial Considerations: Funding for this project is available in the approved Capital Improvement Plan. This project is funded by the General Fund and Roadway Impact Fee Fund for a total budget of $745,000. In addition, Tarrant County will participate in the cost of the project and reimburse the City $200,000 for this project per the Interlocal Agreement approved on March 11, 2014. To date, the City has spent $176,000 on engineering design, fence and irrigation relocation expenses. Strategic Link: The award of this construction contract links to the city's strategy map relative to the focus area of Mobility. The specific corporate objective that is met by this contract is to Invest to provide and maintain high quality assets. Citizen Input/ Board Review: None Legal Review: None Alternatives: The City Council may approve or deny the authorization of this construction contract. Supporting Documents: Bid Tabulation Engineers Recommendation Letter Project Location Map Staff Recommendation: Award construction contract to Pavecon Public Works LP for the Brumlow Avenue Widening Improvements project in an amount not to exceed $680,000. Staff Contact: Robert H. Price, P.E., Public Works Director Cheryl Taylor, P.E., City Engineer Om Gharty Chhetri, P.E., Civil Engineer O O O O O O O O O O O 000000000000000000000000000000 O O O O O . O O O O O O O O O O O O 0 0 O O O O O 1TN O o o 0 0 0 0 0 0 0 0 0 0 0 0 0 . Qp J O O O O O O O Ln N Ln O CO 0 O O O O C O O Or n O O O O O O O O O O O dO O Qj W (n U Q O ONO O r r r dCO ONO IT d) r m(D O M 0 0 0dOnOOOO Y Q Z C O O O O � O d) N Ln CO M M d) M 0 (D I3 O LO d) —7 CO LO CO ITLO M N o 0 co OCY)— O O (O N m (O I� O Ea Ea Ea M M ILn (O d) N M M O I� N CO69 M Ea Ea Ea oa J W C N O Ea Ea Ea Ea 69 N M O Ea Ea Ea Ea Ea Ea Ea Ea Ea 69 N 69 Ea Ea Ea oa N Ea Ea Ea Ea Ea Ea Ea Ea 69 Cl)oo = W Ea Ea Ea 69 N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O LO 00000000000000000000000000000 O O WO d U) O O O O O O O O O O O O O O O O N N O O O O O N N O O O O O O O O O O O O O"- O O p w a O m O O O O O O O O N N 0 0 0 O 0 m o O M Ea 0 N Ea IT 0 0 0 O N M r O O n n O O n O O O O O O O M O n 69 N N O Ea Ea Ea Ea Ea CO O Ea Ea Ea Ea O O m N Ln 00 O O O Ea Ea ITCO ^ LU >- C9 aR. Y) F-� 00 Ea Ea p N O Ln 69 N Ea Ea _ 69 a Ea Ea O I� Ln IT 69 O O (O N - Ea Ea CD Ea 69 69 Ea Ea Ln (O N co EH ea ea ea Ea ea ea ea to z z 69 U z w 69 Z Z W 0 a.0 O O I� O O CO 0 0 0 0 IT 0N CO O O O Ln CO 0 0N O O I� M O CO O Ln M N 0 0 0 coO O O O In z O Z Q WJ 0 � 0 O O (O (O O� 0 (O 0 0 Ln O M O CO N r N d) O M r O (O (O N� Ln r (O C N N Ln O r O O O O r N O O (O 0N0 M � M M O CO O �O0M0 0 O (WGV NCO O 00 E O OW YQ co Ln (O M O d) d) LnN(O LnrLn Ln O cLn NCCl) Ln (O dMMdr Q Q CO Cl) Cl) CO 69 69 69 O N C Li COMCl) O CO Ea (O Ea Ea Ea Ea Ea Ea Ea Ea Ea Ea Ea 69 69 co Z F- Cl) N N Ea Ea Ea Ea N Ea Ea Ea � N Ea 69 Ea Ea Ea Ea Ea Ea LLI ^ i U co u Q O O O 0 0 0 0 CO IT O) O O O 0 CO 0 M 0 0 O M 0 0 0 0 0 co 0 O co m W F- r O O N M Cl) N O Ln M N N I� r r I� r M M CO Ln O N N d) (O M N N I� r O (O Cl) O N M O Ln O r N O N (O Qa. L 0 O O CO O N I� LO M I� CO O LO LO N N I� CO O CO LO I� M CO N 0 CO 0 I� CO r 0 V 0 CO N M O Ea Ea N Ea Ea N Ea O 69 N Ea Ea N I� Ea Ea Ea Ea Ea Ea I� I� Ea Ea Ea Ea CO 000 I� O CO CO 0 LO E9 Ea M I� Ea Ea d) r O IT 69 Cl) Cl) CO Ea j H CO 69 Ea 69 Ea 69 1 M 69 Q 7 R Z Cl) .0 N N 69 <a <a <a <a <a mm a z <a <a <a O O Ln O O co 0 O 0 O 0 0 0 0 0 0 M 0 O 0 O IT 0 0 Ln O O O O O O O O O O O O (O O . O O M ONO (O Ln O O O M Ln (O Ln Ln 00 Lo (O 0 0 0 Ln O O O . app) J ONLn O 0 CO m O OO 'r'T � O 0 CO CO O CO M'T m O O CO O m mOO ON OM r(MO �Gp O O 0N0 OrM O M O ONco m O n Nr n IT co 0 O�N O Ln OCO G F- O O Cl) d) CO (O 0 0 CO m mrO 0 CO CO 0 0 C IT IT Cl) O 0 M m— NM M M 0N CO m 0m Ea Ea Ea Ea Ea co CA —7 COIT_6969N69N 69 N-(O _9 w F Ln Ea Ea Ea Ea Ea 69 d) Ea Ea a Ln a a Ea Ea Ea Ea Ea Ea Ea Ea 69 N Ea Ea Ea Ea Ea W Z Z Ea Ea Ea Ea Ea Ea EH z W ~ F- O 00 O 0 pOO � COO M O 0O0 CO d) CO O M Ln O 0O O LO co Lc)rOOc)CO O O Lc) Lc)rcy) O O O cy) co O ON O O (O ON CO L M M Ea Ea Ea N� Ea Ea Ea M Ln 0 0 0- I� N O CO Ln O pOj M COLI) O M CO Ea Ea Ea Ea Ea Ea Ea Ea Ea Ea Z LD 69 N Ea Ea Ea M 7 —7 - N Ea Z 69 69 Ea 69 Ea Ea Ea Ea Ea Ea Z O to to » to W> »> »> W w W W W W W Q Q W W W Q w Q W W W Q Q Q Q Q»> d J J C) C) J J U)� U) U) U) U) U) U) U) J J J J J J W W J J J W J W J J J W W W W W U) U) U) p C) O Cn W Q O O O 0 0 0 co O N O co co O O N NF- O,3Mm mO O OO O COO (O CLnN N Ln M a C F a C Z O N 6 W O LU > N W In z cn O a � aai _ � J J w U Cb W aCY). 0 C O J_ J_ J_ J J J_ W Z Cfl ~ — .� Q � O O O C) O O LL O t� m E O O O O O O p O C N Z Y O ° O z O d Z w o= a_� O 0 0 0 0 0 0 0 m U �_ _ >C� �aa U O Z Q O a W d� O m N a ~> Y W W> Y m m X m l co co U' Z rn d L1J p -O H W U .� Cr X - .� In _ N O a) Z 0 W M H N O C LLI D O m j N (O !6 - - - - M W W N Q- N` C m d d d W 0 Q 2 Y Q W Q W N a (n > () OD U (� (� T >> .� m U) U) o 0 (� _ y � �------} r _"��a�6iZ LLI J W 0 a 1 cco in MO co LJ d H H H H H F- H H C ~ _¢ ¢ O U) a- Q J d (n (n O O M U F- E .> a O f�/) f�/) f�/) CO O (6 (6 (6 O Z Z Z d' C O a L (6 O O C ���UU Q a C Q N L o����������am W mw O u Q .g�.�LU m (3 W ° Cj N C C Q Q X •-• �� aaa o === o �UQO (6 O>>>>>> (6 (6 >> L >>> E J J C� q z o .N o o Q o o o 2E o m m m m m m m a a m m (� (� (� (� �- a a a a a a a awo E`o ¢ w o z z o E C C E E_= o Q x o a r F F U F- W m m (7 z m F- 0 C� C� C� N 0 0 0�� C� C� � 0- IR IR IR IR IR Ir��� �ii a CO c� � E to in in in � m C� ao m W O N M Ln (O I� CO mO _ _ N M Ln CO I� CO d) O N M 0 CO I� CO MO N M IT CO CO I� CO CY)m O � Z � � � Cl) Cl) Cl) Cl) Cl) �� tnp April 29, 2015 teagve nnll F perkins www.tnpimcom engineers surveyors landscape architects Om Chhetri, P.E., CFM Civil Engineer City of Southlake 1400 Main Street, Suite 320 Southlake, TX 76092 RE: Recommendation of Award for Brumlow Avenue Widening Improvements Om, Bids for the referenced project were received and opened publicly on Tuesday, April 28, 2015 at the City of Southlake. A total of two bids were received. Below is a summary of the bids. A detailed bid tabulation is also attached. Bidder Total Bid Amount 1 Pavecon Public Works LP $646,708.25 2 Stabile & Winn, Inc. $738,599.80 Pavecon Public Works LP was the low of the two bidders with a total bid of $646,708.25. We checked the bids for errors and omissions and found none. Pavecon has been in business for many years, focusing mainly on site development. In recent years they have established a municipal construction division built with a number of very experienced construction supervisors from other companies. We have reviewed the qualification data provided by Pavecon, and found it to satisfactorily meet the bidder qualifications established in the specification documents. TNP has previous experience with Pavecon and they recently completed a project in Denton County with agreeable results. I did not gather any information that suggested that they cannot satisfactorily complete this project. Based on that information, I recommend awarding the contract to Pavecon Public Works LP for the contract amount of $646,708.25. Please call if you have any questions or need additional information. Sincerely, tnp teague nail & perkins 1 LM' +, Christopher M. Hartke, P.E. Fort Worth - 1 100 Macon Street- Fort Worth, Texas 76102 - 817.336.5773 +� Dallas- 17304 Preston Road, Suite 1 340- Dallas, Texas 75252 - 214.461.9867 Denton -1517 Centre Place Drive, Suite 320- Denton, Texas 76205 - 940.383AI 77 Sherman -200 North Travis Street, Suite 500 - Sherman, Texas 75090- 903.870.1089 Registered by the Texas Board of Professional Engineers, Firm No. F-230 - Registered by the Texas Board of Professional Surveyors, Firm No. 1001 16-00 s w c Yyy � IL _ 6 x W Elmo f� w L 3 _ l a CL c V