Item 4D MemorSr, C[TY OF OUTHLAKE MEMORANDUM (October 7, 2014) To: Shana Yelverton, City Manager From: Robert H. Price, P.E., Director of Public Works Item 4D Subject: Award contract to M.K. Painting, Inc. to repaint the Pearson Ground Storage Tanks - Interior GST#1 and Exterior GST#2 in the amount of $830,650.00 Action Requested: Award contract to M.K. Painting, Inc. to repaint the Pearson Ground Storage Tanks - Interior GST#1 and Exterior GST#2 in the amount of $830,650.00. Background Information: The Pearson Ground Storage Tanks (GST) site is located at Pump Station No. 1 near the northeast corner of Pearson Lane and Southlake Boulevard (FM1709). The site encompasses two 5 Million Gallon (MG) steel tanks built in 1996. Tanks are painted periodically to prevent corrosion of the steel (rusting) and oxidation of the paint (discoloration). In 2008, the exterior of GST #1 (west tank) and the interior of GST #2 (east tank) were painted and limited repairs were performed. This contract award involves the inverse of the previous work. As they stand today, the two tanks look slightly different in color because they were painted at two different periods (1996 and 2008). A base bid and an alternate bid were proposed. Base bid included the paint coating system similar to the previous work in 2008 including minor tank repairs. An alternate bid was proposed to evaluate the cost of painting both tank exteriors including minor repairs. The alternate bid differed from the base bid in two aspects: • The exterior surface of both tanks will be prepared using a power -wash cleaning technique as opposed to commercial sand blasting; and, • A two (2) paint coating system will be applied to the exterior of both tanks in lieu of a three (3) paint coating system. Staff recommends the alternate bid option because repainting both tanks will allow the paint to oxidize (discolor) at the same rate and thereby attaining a more appealing product as time progresses. Additionally, the issues of repainting the exteriors at different dates with different contracts and potentially different paint manufacturers and different coating systems are averted by accepting the alternate bid option. Five (5) bids were received on September 17, 2014. The bids have been reviewed by Neel -Schaffer and the City Staff and are tabulated as follows: BIDDER BASE BID ALTERNATE BID Corrosion Eliminators $834,470.00 $734,899. M.K. Painting, Inc. $842,650.00 $830,650.00 N.G Painting $754,150.00 $904,150.00 Classic Protective Coatings $940,950.00 $1,011,375.00 A&M Construction & Utilities $902,840.00 $1,160,840.00 * Bid error and withdrawal by the contractor At the bid opening, N.G painting was the apparent low bidder for the base bid while Corrosion Eliminators was the apparent low bidder for the alternate bid. After the bid opening, Corrosion Eliminators realized an error in their bid proposal and requested a bid unit price modification or withdrawal of their alternate bid. Local Government Code (LGC) states that a bid that has been opened cannot be changed to correct an error in the bid price. However, a bidder has a common law right to withdraw a bid that has a material mistake. In compliance with the LGC, the staff did not allow Corrosion Eliminators to correct the bid price and therefore they submitted a formal request not to consider their alternate bid. With Corrosion Eliminators bid withdrawal, the staff recommends to award the contract to the next responsible low bidder, M.K Painting, Inc. for the alternate bid in the amount of $830,650.00. The repairs and repainting of the Pearson Ground Storage Tanks are anticipated to begin early November 2014. The repairs and repainting are anticipated to be completed by end of March 2015. This construction time frame is typically the period when water consumption is the lowest in the City of Southlake. Therefore, distribution of water to the customer base is not anticipated to be adversely impacted. Financial Considerations: The funding for this project is within the budget amount allocated from the fiscal year 2014 Capital Improvements Projects Utility Fund. Strategic Link: The award of this service contract links to the city's strategy map relative to the focus areas of Infrastructure. The specific corporate objective that is met by this contract is to provide and maintain high quality public assets. Citizen Input/ Board Review: N/A Legal Review: This standard construction contract has been previously reviewed by the City Attorney. Alternatives: The City Council may approve or deny the contract to M.K. Painting, Inc. for the repair and repainting of the Pearson Ground Storage Tanks. Supporting Documents: Engineers Recommendation Letter Bid Tabulation Location Map Corrosion Eliminators withdrawal Letter for alternate bid Staff Recommendation: Award contract to M.K. Painting, Inc. to repaint the Pearson Ground Storage Tanks - Interior GST#1 and Exterior GST#2 in the amount of $830,650.00. Staff Contact: Robert H. Price, P.E., Director of Public Works Cheryl Taylor, P.E., Deputy Director of Public Works/City Engineer Chuck Kendrick, Deputy Director of Public Works -- Operations Om Gharty-Chhetri, P.E., Civil Engineer 11L NEED—SCHAFFER + Cheatham & Associates September 30, 2014 N-S Account No. 12146 Mr. Om Chhetri, P.E., C.F.M. Civil Engineer City of Southlake 1400 Main St., Suite 320 Southlake, TX 76092 REFERENCE: CITY OF SOUTHLAKE REPAINTING PEARSON GROUND STORAGE TANKS INTERIOR GST 41 AND EXTERIOR GST #2 Dear Mr. Chhetri: Sealed bids were received by the City of Southlake on September 16, 2014, for the referenced project. Five (5) contractors submitted bids for this project. Enclosed is a copy of the Bid Tabulation for the five (5) qualified bids submitted. The bid proposal included a base bid option, which was interior of GST#1 and exterior of GST42 and an alternate bid, which was the interior of GST#1 and the exterior of GST#1 and #2. Below are a summary of the bids of the qualified bidders on this project: Bidder Corrosion Eliminators, Inc. M.K. Painting, Inc. N.G. Painting A&M Construction & Utilities Classic Protective Coatings, Inc. Base Bid Alternate Bid $834,470.00 $734,809.00* $842,650.00 $830,650.00 $754,150.00 $904,150.00 $902,480.00 $1,160,840.00 $940,950,00 $1,011,375.00 Corrosion Eliminators, Inc. has provided a written request to withdraw their alternate bid due to a bid error. Our understanding is the City has selected the alternate bid for award in lieu of the base bid. With the withdrawal of Corrosion Eliminators, Inc., the lowest bid was submitted by M.K. Painting, Inc. of Wyandotte, Michigan in the amount of $830,650.00. We have reviewed and tabulated all bids received, and found no discrepancies with the exception of Corrosion Eliminators, Inc. We have previously worked with M.K. Painting, Inc. and have had a positive experience regarding their overall performance including their construction quality and timeliness. This contractor provided the T.W. King ground storage tank repainting project in 2012. We appreciate the opportunity to work with you on this important project. Please call if you need additional information. Sincerely, 7ek FFE INC. eatham, P.E. Vice President ARLINGTON • DALLAS • FORT WORTH - HOUSTON engineers - planners - surveyors - environmental scientists - emergency management 2501 Avenue J, Suite 120 • Arlington, TX 76006 - phone 817-548-0696 • fax 817-265-8532 • www.neel-schaffer.com & a m § 2 $ 0 w § - ® ---------------/ i i o \ \0/0� \\\\\\\\\\\\\\\\ _ -------- - ----& # £ :\\ §\}\� �n 000000\;0 0 M 02 10 ° &;& , „ ; w w 000000 \\\\\\\}\\� { .I \\\\} �£ �\N 2, ,«« 2 @\\ k\}\ 00 }}\\}}}§§®\\ \ \ -;;& - /}{/} { //\\\\§®§}®}®2}®}\ \ \ / }kk 00 ��\\�� co \ \\\\} �� �\\\\��\� )\ ),; 00 §,��;[� } ! IsIs� § k \z �_ -_ f _ _ - } \ _ 4§,§§:} _0 § )_/%%{ { ` k){{{\&;k#\.0 k >m LL _ ! ) ! ) f k § § r j _-~�\\\=2 % § .----_�-t -\\§ ) ! • \ § >- 0 �2-- �` z/j}}}i)/!\\!!))/) § § k m § corros`alf leCixtlfators, AC. A W W A SPECIALISTS P.O. BOX 1546 MINERAL WELLS, TEXAS 76068 Ph: (940) 325-8450 Fax: (940) 325-0502 i cei 0corrosioneiim inators.com Commercial September 22, 2014 City of Southlake Attn: City Secretary 1400 Main St. Southlake, TX 76092 Reference: Sid for Repainting of Pearson Ground Storage Tanks Derek Cheatham / Om Chhetri, Corrosion Eliminators cannot do the alternate bid for the price quoted. Alternate bid item no. 3A pricing was put in for only one tank not two tanks. The outside of two tanks cannot be completed for the price of $193,339.00. The paint materials alone for two tanks will cost approximately S175,000.00. We formally request that our bid not be considered for the alternate bid portion of this bid package. Org: City Secretary; CC: Derek Cheathem and Om Chhetri Sincerely, Corrosion Eliminators, Inc. fey o Presi ent / CEO tm Industrial