Item 4FCITY OF SOUTHLAKE MEMORANDUM August 28, 2014 To: Shana Yelverton, City Manager From: Chris Tribble, Director of Community Services 4F-1 Subject: Approve Guaranteed Maximum Price in the amount of $12,255,403 with Adolfson & Peterson Construction for Construction Manager at -Risk Services for Community Recreation Center. Action Requested: Approve the Guaranteed Maximum Price (GMP) amendment to the Construction Manager at -Risk agreement with Adolfson & Peterson (A&P) in the amount of $12,255,403 for construction of the Community Recreation Center. Background Information: Based on recommendations from the RFQ review committee, and a proven track record of a previous successful project within Southlake, as well as many other similar successful projects across the nation, the City Council awarded (6-0) a contract on December 19, 2013, for Construction Manager at -Risk (CMAR) services to Adolfson & Peterson Construction for the Community Recreation Center Project with the Guaranteed Maximum Price (GMP) amendment to be considered by City Council once actual construction costs are determined. Construction costs have been determined and the next step is consideration of the GMP at this time. This item has been placed on your agenda for City Council approval of the Guaranteed Maximum Price Amendment with Adolfson & Peterson Construction in the amount of $12,255,403 for Construction Manager at -Risk Services for Phase 1 of the Community Recreation Center project. Construction will include an events hall, multipurpose conference & meeting spaces, a club lounge, catering kitchen, senior center, an outdoor amphitheater and events space. Construction on the first phase is anticipated to begin City of Southlake Values. Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Shana Yelverton, City Manager Meeting Date — September 2, 2014 Page 2 of 4 4F -2 in September 2014 with a ground breaking planned for September 27cn Financial Consideration: On August 6, 2013, with the hiring of Barker Rinker Seacat Architecture to design the project, the Council established an overall project cost estimate of $46,500,000, and directed staff to design and build the project in two phases. On June 3, 2014 the Council approved the Site Plan for Phase 1 of the Community Recreation Center. As part of the approval, the Council directed staff to bring back an option to include additional exterior restrooms within Phase 1. On August 5, 2014, during the City Council's Work Session, staff presented a plan for the additional exterior restrooms, along with the associated cost of $400,000. At the direction of the City Council, the additional exterior restrooms are included in the current Phase 1 scope. With the approval of this item, the City Council is also revising the overall project cost estimate from $46,500,000 to $46,900,000 to accommodate the additional scope of the exterior restrooms. The CRC Phase 1 project is anticipated to be completed within this cost estimate. The approved project funding and anticipated costs are as follows. Expenditures to date: Design Development (BRS) $1,784,435 Topo Survey (Pacheco Koch) $15,500 Geotech Survey (Fugro) $45,440 CMAR Preconstruction Fee (A&P) $21,000 Total $1,866,375 Planned expenditures: CMAR GMP Amendment (A&P) $12,255,403 FF&E Allowance (City) $400,000 City Tap/Impact Fee Allowance (City) $25,000 Lab Testing Allowance (City) $75,000 Total $12,755,403 City of Southlake Values. Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Shana Yelverton, City Manager Meeting Date — September 2, 2014 Page 3 of 4 Phase 1 Aooroved Fundina vs. Anticioated Cost: 4F - 3 Phase 1 Approved Funding $15,109,234 Phase 1 Anticipated Cost $14,621,778 Total Under Budget $487,456 Strategic Link: This item is linked to the City's Strategy Map related to the focus area of Infrastructure and Quality Development and meets the corporate objectives to Provide Attractive and Unique Spaces for Enjoyment of Personal Interests and Invest to Provide and Maintain High Quality Public Assets. It also addresses the City's Critical Business Outcomes CB01 by continuing to implement Southlake 2030 Plan by focusing on short-term initiatives. Citizen Input/ Board Review: The City Council approved the agreement with Adolfson & Peterson Construction for Construction Manager at -Risk services for the Community Recreation Center on December 19, 2013. The City Council modified the Phase 1 scope and the overall project cost estimate to include additional exterior restrooms at their August 5, 2014 Work Session. Legal Review: The Construction Manager at -Risk agreement has been reviewed and approved by the City Attorney. Alternatives: Alternatives may include: ■ Approve Guaranteed Maximum Price amendment with A&P Construction as presented ■ Approve Guaranteed Maximum Price amendment with A&P Construction with input as desired ■ Not approve Guaranteed Maximum Price amendment Supporting Documents: ■ Document Al33 - Guaranteed Maximum Price Amendment City of Southlake Values. Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Shana Yelverton, City Manager Meeting Date — September 2, 2014 Page 4 of 4 Staff Recommendation: Approve Guaranteed Peterson Construction construction of the first Center 4F -4 Maximum Price with Adolfson & in the amount of $12,255,403 for phase of the Community Recreation City of Southlake Values. Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork AIA Document A133"- 2009Exhibit A Guaranteed Maximum Price Amendment for the foilowing PROJECT: (Name and address or location) Southlake Community Recreation Center ADDITIONS AND DELETIONS: Bicentennial Park The author of this document has 285 Shady Oaks bane added Information needed for its Southlake, TX 76092 completion. The author may also have revised the text of the original THE OWNER: AIA standard form. An Additions and (Name, legal status and address) Delletions Report that notes added information as well as revisions to the standard form text is available City of Southlake tY from the author and should be 1400 Main Street reviewed. A vertical line in the left Southlalre, TX 76092 margin of this document indicates where the author has added necessary information and where THE CONSTRUCTION MANAGER: the author has added to or deleted (Name, legal status and address) from the original AIA text. Adolfson & Peterson Construction This document has important legal 1900 Firman Drive, Ste 700 consequences. Consultation with an Richardson, TX 7508 i attorney is encouraged with respect to Its completion or modification. AIA Document A201'"' 2007, ARTICLE A.1 General Conditions of the Contract f A.1.1 Guaranteed Maximum Price for Construction, is adopted In this Pursuant to Section 2.2.6 of the Agreement, the Owner and Construction Manager hereby document by reference. Do not use amend the Agreement to establish a Guaranteed Maximum Price. As agreed by the with other general conditions unless Owner and Construction Manager, the Guaranteed Maximum Price is an amount that the this document is modified. Contract Sum shall not awed. The Contract Sum consists of the Construction Manager's Fee plus the Cost of the Work, as that term is defined in Article 6 of this Agreement. § A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Twelve million, two hundred fifl�r-five thousand, four hundred three dollars ($12,255,403 ), subject to additions and deductions by Change Orden' as provided in the Contract ,Documents. ,§ A.1.1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories, allowances, contingencies, alternates, the Construction Manager's Fee, and other items that comprise the Guaranteed Maximum Price. (Provide below or reference an attachment.) Reference Exhibit A: Adolfson & Peterson GNP Breakdown (Paragraphs deleted) 3 A.1.1.3 The Guaranteed Maximum Price is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other idendfication of accepted alternates. If the Contract Documents permit the Owner to accept other alternates subsequent to the execution of AIA Document A133"' — 2009 Exhibit A Copyright O 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This Inl4. AIA! Document Is protected by U.S. Copyright Law and International Trestles. Unauthorized reproduction or distribution of this AIA! Document, ar any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at I I A6:50 on Oaf M014 under Order No.739934657B 1 which expires an 0aM 512015. and Is not for resale. User Notes: (1144542538) this Amendment, attach a schedule of such other alternates showing the amount for each and the date wheno _ 6 amount expires.) I None § A.1.1.4 Allowances included in the Guaranteed Maximum Price, if any: (Identify allowance and state exclusions, if any, from the allowance price.) Item Price ($0.00) Site Discovery $20,000 Pier Casing $181,000 Steel Design $50,000 Signage $50,000 Rail 1 Step Lighting at Amphitheater & $40,000 Back Porch Amphitheater Stage Lighting $40,000 Amphitheater Sound System $50,000 § A.1.1.5 Assumptions, if any, on which the Guaranteed Maximum Price is based: j Reference Exhibit B: General Qualifications § A.1.1.6 The Guaranteed Maximum Price is based upon the following Supplementary and other Conditions of the Contract: Document title Date § A.1.1.7 The Guaranteed Maximum Price is based upon the following Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Reference Exhibit C: Specifications Section 'ride Date § A.1.1.8 The Guaranteed Maximum Price is based upon the following Drawings: (Either list the Drawings here, or refer to an exhibit attached to this Agreement.) Reference Exhibit D: Drawings Number Title Date Pages Pages § A.1.1.9 The Guaranteed Maximum Price is based upon the following other documents and information: (List any other documents or information here, or refer to an exhibit attached to this Agreement.) Reference Exhibit E: Other Documents ARTICLE A.2 § A.2.1 The anticipated date of Substantial Completion established by this Amendment: Eleven (11) months from the Notice to Proceed Ink� moment A133TM — 200g Exhibit A. Copyright 0 1991,2003 and 20W by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Low and Intemational Treaties. Unauthorized reproduction or distribution of this AIA Document, or 2 any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the mmdmum extent possible under the law. This document was produced by AIA software at 11.46:50 on 081 WO14 under Order No.73993465761 which expires an 0811512015, and is not for resale. User Notes: (1144642638) OWNER (Signature) John Terrell, Mayor, City of Southlake (Printed name and title) 4F - 7 CONSTRUMO MANAGER (Signature) Corbett Nichter, Senior Vice President (Printed name and title) AIA Document A133'■ — 2009 Exhibit A Copyright ® 1991, 2003 and 2009 by The American Instidute of Architects. All rights reserved. WARNING: This InIL Ale Document Is protected by U.S. Copyright Low and International Treaties. Unauthorized reproduction or distribution of this Ale Document, or any portion of It, may result In severe, civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11 A6:50 on 0612IM014 under Order No.7399346576 1 which expires an 0BM6/2015, and Is not for resale. Usar Notes: (1144542538) Additions and Deletions Report for AIA Document A 13e — 2009 Exhibit A 4F - 8 This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added to the standard farm AIA document in order to complete It, as well as any text the author may have added to or deleted from the original AIA text Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text. Note. This Additions and Deletions Report is provided for information purposes only and is not incorporated Into or constitute any part of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 11,46:60 on 08126/2014. PAGE 1 SoudAake Community Recreation Centex' Bicentennial Park 285 Shady Oaks Lane SouthWw. TX 76092 (Name, legal status and address) Ci y of Southlake 1400 Main Street Southlake, TX 76092 (Name, legal status and address) Adolfson & Peterson Construction 1900 Furman Drive, Ste 700 Mchardson, TX 75081 A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed f —Twelve million, two hundred Wfive thousand, four hundred three dollars ($12,255,403 ), subject to additions and deductions by Change Order as provided in the Contract Deeumel .Documents, .S A.1,1.2 Itemized Statement of the Guaranteed Maximum Price. Provided below is an itemized statement of the Cntaranteed Maximum Price organized by trade categories, allowances. contingencies, alternates, the Construction Manager's Fee, and other items that comvrise the Guaranteed Maximum Price. (Provide below or reference an attachment.) Reference Exhibit A: Adolfson & Peterson GAP Breakdown WOO I Additions and Deletions Report for AIA Document A133"' — 2000 Exhibit A Copyright m 1991. 2003 and 2009 byThe American Institute or Architects. All rights reserved. WARNING: This AIAe Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAe Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11 A8:50 on 00126/2014 under Order No.7399348570-1 which expires an 08/15J2015, and Is not for resale. User Notes: (1144542530) 4F - 9 PAGE 2 None Site Discovery $20,000 Pier Cas $181.000 Steel Desi $50,000 Sim $50.00U Rail / Step Lighting at Amphitheater $40,000 Back Porch Amphitheater Stage Lighting 40 000 Amphitheater Sound System $50,000 Reference Exhibit B: General Oualifications Reference Exhibit C: Sipecifications Reference Exhibit D: Drawings Reference Exhibit E: Other Documents Eleven (11) months from the Notice to Proceed PAGE 3 John Terrell, Mayor, City of Southlake Corbett Nichter, Senior Vice President Additions and Deletions Report for AIA Doaumwd A133'* — 2000 Exhibit A. Copyright m 1991, 2003 and 2009 by The American Institute of Architacb. All rights reserved. WARNING: This Ale Document la protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or 2 distribution of this AIAe Document, or any portion of It, may result In severe Civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11 A6.50 on 08/26/2014 under Order No.7399346575 1 which expires on 08/16/2015, and Is not for resale. User Notes: (1144542538) 4F-10 Certification of Document's Authenticity AIA® Document D4011m — 2003 I, Corbett Nichter, hereby certify, to the best of my knowledge, information and belief, that I created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 11:46:50 on 08/26/2014 under Order No. 73993465761 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AUO Document A133Tm — 2009 Exhibit A, Guaranteed Maximum Price Amendment, as published by the AIA in its software, other titan those additions and deletions shown in the associated Additions and Deletions Report. (ajgnegI Sly VIM �IA� nitre) 7, AIA Document D401'rr — 2003. Copyright G 1992 and 2003 by The American Institute of Architects. All rights reserved. WARNING: This Ale Document Is protected by U.S. Copyright Law and International Treatise. Unauthorized reproduction or distribution of this AIAe Document, or any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by ALA software at 11:46:50 on 08/26/2014 under Order No.7399346576_1 which mores on 08/15=5, and Is not for resale. User Notes: (1144642538) Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit A - Adolfson & Peterson GMP Breakdown August 26, 2014 Description gty Unit Cost General Conditions 11 Months $493,218 Temporary Fencing & Gates 3300 LF $14,850 Temporary Fencing & Gate Maintenance 11 Months $3,300 Project Layout/ Engineering 4 Weeks $12,952 Adjacent Property Clean-up 1 LS $20,000 Daily Project Clean-up 48 Weeks $28,800 Street Sweeping 14 EA $8,400 Construction Dumpsters 56 EA $25,200 Project Final Clean 27500 SF $8,250 Site Discovery Allowance Bid Package 31A - Earthwork & Site Demolition 1 1 ALL Sub $20,000 $258,721 Bid Package 32D -Termite Treatment 1 Sub $1,325 Bid Package 33A - Utilities 1 Sub $363,164 Bid Package - Pavers 1 Sub $43,220 Bid Package 32B - Fencing & Gates 1 Sub $127,219 Bid Package - Retaining Walls 1 Sub $99,037 Bid Package 13A - Pedestrian Bridge 1 Sub $78,050 Bid Package 32C - Pavement Markings 1 Sub $9,736 Bid Package 32A - Landscape & Irrigation / Site Furnishings 1 Sub $459,326 Bid Package 03A - Concrete 1 Sub $1,459,385 Pier Casing Allowance 1 ALL $181,000 Bid Package 04A - Masonry 1 Sub $673,500 Bid Package 05A - Steel Fabrication & Erection Steel Design Allowance 1 1 Sub ALL $789,897 $50,000 Bid Package 01A - General Trades 1 Sub $56,162 Bid Package 06A - Millwork 1 Sub $391,427 Bid Package 07B - Waterproofing & Joint Sealer 1 Sub $199,510 Bid Package 07C - Metal Wall Panels 1 Sub $54,515 Bid Package 07A - Roofing 1 Sub $334,100 Bid Package 08A - Doors, Frames, & Hardware 1 Sub $186,624 Bid Package 08B - Overhead Doors Bid Package 08C - Glazing 1 1 Sub Sub $5,185 $325,378 Bid Package 09A - Drywall Bid Package 09G - Plaster 1 1 Sub Sub $1,288,238 $5,000 Bid Package 09C - Ceramic Tiling 1 Sub $37,580 Bid Package 091 -Terrazzo Flooring 1 Sub $25,680 4F-11 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit A — Adolfson & Peterson GMP Breakdown August 26, 2014 Bid Package 09D - Resilient Flooring & Carpet Sub $84,127 Bid Package 09E - Wood Flooring 1 Sub $15,500 Bid Package 09H - Fluid Applied Flooring 1 Sub $8,268 Bid Package 09B - Painting 1 Sub $120,000 Bid Package 10B - Specialties 1 Sub $25,285 Bid Package 10D - Fireplace 1 Sub $10,990 Signage Allowance 1 ALL $50,000 Bid Package 10C- Folding Panel Partitions 1 Sub $155,245 Bid Package 09H - Stage Curtain 1 Sub $22,200 Bid Package 11A - Food Service Equipment 1 Sub $89,960 Bid Package - Floor Mats 1 Sub $15,000 Bid Package 12A - Window Treatments 1 Sub $31,543 Bid Package 22A & 23A - Plumbing & HVAC 1 Sub $864,149 Bid Package 21A - Fire Suppression 1 Sub $46,657 Bid Package 26A- Electrical Rail / Step Lighting at Amphitheater & Back Porch - Allowance 1 1 Sub ALL $851,960 $40,000 Amphitheater Stage Lighting Allowance Bid Package 27A - Communications 1 1 ALL Sub $40,000 $35,000 Bid Package 27B - Audio Visual Amphitheater Sound System Allowance 1 1 Sub ALL $188,227 $50,000 Bid Package 28A - Access Control & Security 1 Sub $121,485 Total Construction Cost $11,003,535 GMP Construction Contingency $300,000 Builder's Risk Insurance $8,803 Sub Bonding Insurance $137,544 Comprehensive General Liability Insurance $110,035 Performance, Labor & Material Bond $91,139 A&P's Fee $253,082 Total Project Cost $11,904,138 Additional Bathrooms Allowance $351,265 Total GMP $12,255,403 4F-12 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit B — General Qualifications August 26, 2014 General Oualifrcations / inclusions 1. A $300,000 construction contingency is included in this estimate. 2. This budget is based on an 11 month construction schedule. 3. Payment and Performance Bonds are included. 4. Insurance is included. 5. Pier Depths have been priced based on an average depth to bearing of 607. 6. The Amphitheater Roof is priced as a TPO application. General Exclusions 1. Abatement and site remediation 2. FF&E 3. TDLR Review 4. Permitting Cost 5. Lab Testing 6. Tap / City Impact Fees 4F-13 Page 1 of 1 South lake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit C — Specifications August 26, 2014 4F-14 DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 0 3100 AVAILABLE PROJECT INFORMATION Geotechnical Report (84 pages) 00 5000 CONTRACTING FORMS AND SUPPLEMENTS 00 6000 PROJECT FORMS Project Forms DIVISION 01- GENERAL REQUIREMENTS 011000 SUMMARY 012000 PRICE AND PAYMENT PROCEDURES 012200 UNIT PRICES 013000 ADMINISTRATIVE REQUIREMENTS 013114 FACILITY SERVICES COORDINATION 014000 QUALITY REQUIREMENTS 014100 REGULATORY REQUIREMENTS 014216 DEFINITIONS AND EXPLANATIONS 014533 CODE -REQUIRED SPECIAL INSPECTIONS 015000 TEMPORARY FACILITIES AND CONTROLS 015721 INDOOR AIR QUALITY CONTROLS 016000 PRODUCT REQUIREMENTS 016116 VOC CONTENT RESTRICTIONS 017000 EXECUTION AND CLOSEOUT REQUIREMENTS 017419 CONSTRUCTION WASTE MANAGEMENT 017800 CLOSEOUT SUBMITTALS 017900 DEMONSTRATION AND TRAINING 019113 GENERAL COMMISSIONING REQUIREMENTS Page 1 of 8 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit C — Specifications August 26, 2014 DIVISION 02 — EXISTING CONDITIONS 02 4100 DEMOLITION 4F-15 DIVISION 03 - CONCRETE 03 3000 CAST -IN -PLACE CONCRETE 03 4500 PRECAST ARCHITECTURAL CONCRETE 03 4900 GLASS -FIBER REINFORCED CONCRETE DIVISION 04 - MASONRY 04 0511 MASONRY MORTARING AND GROUTING 04 2000 UNIT MASONRY 04 4301 EXTERIOR STONE MASONRY VENEER DIVISION 05 — METALS 051200 STRUCTURAL STEEL FRAMING 05 2100 STEEL JOISTS 05 3100 STEEL DECK 05 3400 ACOUSTICAL STEEL DECKING 05 4000 COLD -FORMED METAL FRAMING 05 5000 METAL FABRICATIONS DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES 061000 ROUGH CARPENTRY 06 2000 FINISH CARPENTRY 06 4100 ARCHITECTURAL WOOD CASEWORK 06 4216 WOOD -VENEER PANELING 06 6420 DECORATIVE RESIN PANELS Page 2 of 8 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit C — Specifications August 26, 2014 4F-16 06 8200 GLASS FIBER REINFORCED PLASTIC (GFRP) DIVISION 07 - THERMAL AND MOISTURE PROTECTION 071113 BITUMINOUS DAMPPROOFING 07 2100 THERMAL INSULATION 07 2119 FOAMED -IN -PLACE INSULATION 07 2500 WEATHER BARRIERS 07 2616 INTEGRALLY BONDED UNDERSLAB VAPOR RETARDER 07 3113 ASPHALT SHINGLES 07 4264 METAL COMPOSITE MATERIAL (MCM) WALL PANELS 07 5200 MODIFIED BITUMINOUS MEMBRANE ROOFING 07 6200 SHEET METAL FLASHING AND TRIM 07 7200 ROOF ACCESSORIES 07 8400 FIRESTOPPING 07 9005 JOINT SEALERS DIVISION 08 - OPENINGS 081113 HOLLOW METAL DOORS AND FRAMES 081416 FLUSH WOOD DOORS 081433 STILE AND RAIL WOOD DOORS 08 3100 ACCESS DOORS AND PANELS 08 3315 OVERHEAD COILING WOOD COUNTER DOORS 08 4229 AUTOMATIC ENTRANCES 08 4313 ALUMINUM -FRAMED STOREFRONTS 08 4500 TRANSLUCENT ROOF ASSEMBLIES 08 6223 TUBULAR SKYLIGHTS 08 7100 DOOR HARDWARE Page 3 of 8 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit C — Specifications August 26, 2014 08 8000 GLAZING 08 8300 MIRRORS 4F-17 DIVISION 09 - FINISHES 09 0561 FLOORING PREPARATION 09 2116 GYPSUM BOARD ASSEMBLIES 09 2613 GYPSUM VENEER PLASTERING 09 3000 TILING 09 5100 ACOUSTICAL CEILINGS 09 5423 LINEAR METAL CEILINGS 09 6429 WOOD STRIP AND PLANK FLOORING 09 6500 RESILIENT FLOORING 09 6623 RESINOUS MATRIX TERRAZZO FLOORING 09 6700 FLUID -APPLIED FLOORING 09 6813 TILE CARPETING 09 7200 WALL COVERINGS 09 7733 FIBER GLASS REINFORCED PLASTIC (FRP) PANELS 09 8322 STAGE CURTAINS 09 8412 ACOUSTICAL ACCESSORIES 09 9000 PAINTING AND COATING 09 9600 HIGH-PERFORMANCE COATINGS DIVISION 10 - SPECIALTIES 101101 VISUAL DISPLAY BOARDS 101400 SIGNAGE 10 2226.33 FOLDING PANEL PARTITIONS 10 2601 MANUFACTURED WALL AND CORNER GUARDS Page 4 of 8 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit C — Specifications August 26, 2014 4F-18 10 2800 TOILET, BATH, AND LAUNDRY ACCESSORIES 10 3100 MANUFACTURED FIREPLACES 10 4400 FIRE PROTECTION SPECIALTIES DIVISION 11- EQUIPMENT 113100 RESIDENTIAL APPLIANCES 114000 FOOD SERVICE EQUIPMENT DIVISION 12 - FURNISHINGS 12 2420 ROLLER SHADES 12 3600 COUNTERTOPS AND HORIZONTAL SURFACES DIVISION 21— FIRE SUPPRESSION 210000 FIRE PROTECTION DIVISION 22 - PLUMBING 22 0000 GENERAL PLUMBING REQUIREMENTS 22 0010 PLUMBING RELATED WORK 22 0500 PIPE, VALVES & PIPE SPECIALTIES 22 0548 PLUMBING VIBRATION CONTROL 22 0553 PLUMBING IDENTIFICATION 22 0700 PLUMBING INSULATION 22 0800 COMMISSIONING OF PLUMBING SYSTEMS 22 2000 PLUMBING SYSTEMS DIVISION 23 - HVAC 23 0000 GENERAL MECHANICAL REQUIREMENTS Page 5 of 8 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit C — Specifications August 26, 2014 4F-19 23 0010 MECHANICAL RELATED WORK 23 0548 HVAC VIBRATION CONTROL 23 0553 MECHANICAL IDENTIFICATION 23 0593 TESTING, ADJUSTING, AND BALANCING 23 0700 MECHANICAL INSULATION 23 0800 COMMISSIONING OF HVAC 23 0923 TEMPERATURE CONTROL SYSTEMS — DDC 23 0995 TRENDING, HISTORICAL STORAGE, AND REMOTE MONITORING 23 2300 REFRIGERANT SYSTEMS 23 3000 AIR DISTRIBUTION 23 5400 ELECTRIC HEATING TERMINALS 23 7300 AIR HANDLING UNITS DIVISION 26 - ELECTRICAL 26 0500 COMMON WORK RESULTS FOR ELECTRICAL 26 0519 LOW -VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26 0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26 0529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 26 0533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 26 0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 0800 COMMISSIONING OF ELECTRICAL 26 0923 LIGHTING CONTROL DEVICES 26 0924 NETWORK LIGHTING CONTROLS 26 2200 LOW -VOLTAGE TRANSFORMERS 26 2413 SWITCHBOARDS 26 2416 PANELBOARDS 26 2726 WIRING DEVICES Page 6 of 8 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit C — Specifications August 26, 2014 4F - 20 26 2813 FUSES 26 2816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 26 4113 LIGHTNING PROTECTION FOR STRUCTURES 26 5100 INTERIOR LIGHTING 26 5600 EXTERIOR LIGHTING DIVISION 27 - COMMUNICATIONS 271100 COMMUNICATIONS EQUIPMENT ROOM FITTINGS 271500 COMMUNICATIONS HORIZONTAL CABLING 27 4116 AUDIO-VISUAL BASIC MATERIALS AND METHODS DIVISION 28 — ELECTRONIC SAFETY AND SECURITY 28 1300 ACCESS CONTROL SYSTEM 28 2300 ELECTRONIC SURVEILLANCE SYSTEM 28 3111 DIGITAL, ADDRESSABLE FIRE -ALARM SYSTEM DIVISION 31- EARTHWORK 311000 SITE CLEARING 312300 EARTHWORK 312500 EROSION AND SEDIMENTATION CONTROLS 313213.19 LIME TREATED BASE COURSES 316329 DRILLED PIERS DIVISION 32 - EXTERIOR IMPROVEMENTS 32 1313 PORTLAND CEMENT CONCRETE PAVING 321313.23 PEDESTRIAN CONCRETE PAVING Page 7 of 8 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit C -- Specifications August 26, 2014 DIVISION 33 - UTILITIES 33 1000 WATER UTILITIES 33 3000 SANITARY SEWERAGE UTILITIES 33 4000 STORM DRAINAG UTILITIES 33 4613.13 FOUNDATION AND DRAINAGE 33 5100 NATURAL GAS DISTRIBUTION 4F - 21 ***The Specifications Listed above are included in the Project Manual dated July 18, 2014 Page 8of8 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit D - Drawings August 26, 2014 DRAWINGS CIVIL Cl. I DEMOLITION PLAN C 1.2 PAVING PLAN C1.3 PAVING DETAILS C2.1 DIMENSIONAL CONTROL PLAN C2.2 DIMENSIONAL CONTROL PLAN C3.1 GRADING PLAN C3.2 GRADING PLAN C3.3 GRADING PLAN- RETAINING WALL C4.1 EXISTING DRAINAGE AREA MAP C4.2 PROPOSED DRAINAGE AREA MAP C4.3 STORM SEWER PLAN C4.4 DETENTION CALCULATIONS C5.0 SITE UTILITY PLAN C7.0 EROSION CONTROL PLAN C7.1 EROSION CONTROL DETAILS LANDSCAPE L1.00 MATERIALS LEGEND L1.01 ACCESSIBILITY PLAN L1.02 ACCESSIBILITY NOTES L1.03 HARDSCAPE NOTES L1.10 HARDSCAPE PLAN L1.I I HARDSCAPE PLAN L1.12 HARDSCAPE PLAN L1.13 HARDSCAPE PLAN L1.20 HARDSCAPE DETAILS L1.21 HARDSCAPE DETAILS L1.22 HARDSCAPE DETAILS L1.23 HARDSCAPE DETAILS L2.01 PLANTING LEGEND L2.02 PLANTING NOTES L2.03 PLANTING NOTES L2.04 PLANTING NOTES 4F - 22 L2.10 PLANTING PLAN L2.11 PLANTING PLAN L2.12 PLANTING PLAN L2.13 PLANTING PLAN L3.00 IRRIGATION DETAILS, NOTES& LEGEND L3.10 IRRIGATION PLAN L3.11 IRRIGATION PLAN L3.12 IRRIGATION PLAN Page 1 of 5 Southlake Community Recreation Center Guaranteed Maximum Price Amendment 4F - 23 Exhibit D — Drawings August 26, 2014 L3.13 IRRIGATION PLAN ARCHITECTURE A000 ABBREVIATIONS, SYMBOLS, AND GENERAL NOTES A001 WALL TYPES, ROOF TYPES, FLOOR TYPES A010 CODE ANALYSIS AO I MAIN LEVEL CODE PLAN A 101 FLOOR PLAN A102 CLERESTORY PLAN A 103 ROOF PLAN A210 FIRST LEVEL RCP A300 OVERALL BUILDING ELEVATIONS A301 OVERALL BUILDING ELEVATIONS A302 EXTERIOR ELEVATIONS A310 OVERALL BUILDING SECTIONS A311 OVERALL BUILDING SECTIONS A312 OVERALL BUILDING SECTIONS A400 WALL SECTIONS A401 WALL SECTIONS A402 WALL SECTIONS A403 WALL SECTIONS A404 WALL SECTIONS A405 WALL SECTIONS A500 STAIR PLANS AND SECTIONS A600 ACCESSORY SCHEDULES, ELEVATIONS & ENLARGED TOILET ROOM PLANS A601 ENLARGED RESTROOM PLANS, AND ELEVATIONS A602 INTERIOR ELEVATIONS, ENLARGED PLANS, LOBBY A603 INTERIOR ELEVATIONS, ENLARGED PLANS OF SENIOR LOUNGE A604 INTERIOR ELEVATIONS, SENIOR LOUNGE A605 INTERIOR ELEVATIONS, CLUB LOUNGE A606 INTERIOR ELEVATIONS, COMMUNITY ROOM A607 INTERIOR ELEVATIONS, COMMUNITY ROOM, CORRIDOR A608 INTERIOR ELEVATIONS, MEETING ROOM & CLASSROOM A609 INTERIOR ELEVATIONS, RECEIVING, KITCHEN, & SERVING A610 INTERIOR ELEVATIONS, LOBBY DESK A611 INTERIOR ELEVATIONS, SENIOR DESK A612 INTERIOR ELEVATIONS, CLUB LOUNGE BAR A630 GENERAL MILLWORK DETAILS A631 GENERAL MILLWORK DETAILS A632 GENERAL MILLWORK DETAILS A633 GENERAL MILLWORK DETAILS A634 GENERAL MILLWORK DETAILS A700 DOOR SCHEDULES AND TYPES A701 DOOR DETAILS Page 2 of 5 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit D — Drawings August 26, 2014 A702 DOOR DETAILS - OPERABLE PARTITION A703 EXTERIOR/INTERIOR WINDOW TYPES AND WINDOW COVERINGS Wills I110' CAt'lki 01*1LIRV"0 y A705 WINDOW DETAILS A710 PLAN DETAILS A711 PLAN DETAILS A712 PLAN DETAILS A720 SECTION DETAILS A721 SECTION DETAILS A722 SECTION DETAILS A730 PATIO PILASTER DETAILS A732 FIREPLACE DETAILS A734 TRASH ENCLOSURE DETAILS A740 CEILING DETAILS AA 101 AMPHITHEATER FLOOR PLAN AA 102 AMPHITHEATER ROOF AND RCP AA 300 AMPHITHEATER ELEVATIONS & INTERIOR ELEVATIONS AA 301 AMPHITHEATER ELEVATIONS, SECTION AND INTERIOR ELEVATIONS AA 302 AMPHITHEATER SECTIONS AND DETAILS AA 720 AMPHITHEATER DETAILS INTERIORS I000 FINISH LEGEND, GENERAL NOTES, AND ABBREVIATIONS I101 FIRST LEVEL FINISH FLOOR PLAN I600 ENLARGED FINISH PLANS I601 INTERIOR ELEVATIONS I602 INTERIOR DETAILS IF 101 FIRST LEVEL FURNITURE PLAN IS000 SIGNAGE SCHEDULE AND LEGEND IS001 FIRST LEVEL SIGNAGE PLAN STRUCTURAL S 101 STRUCTURAL NOTES 5102 STRUCTURAL NOTES & ABBREVIATIONS S 103 SPECIAL INSPECTIONS S201 FOUNDATION PLAN S202 LOW ROOF FRAMING PLAN S203 CLERESTORY & HIGH ROOF FRAMING PLANS 5301 TYPICAL CONCRETE DETAILS S302 CONCRETE DETAILS S303 CONCRETE DETAILS S501 TYPICAL STEEL DETAILS S502 TYPICAL STEEL DETAILS 5511 BRACE ELEVATIONS 4F - 24 Page 3 of 5 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit D — Drawings August 26, 2014 S512 BRACE ELEVATIONS S513 FRAME ELEVATIONS S514 BRACE DETAILS S601 TRUSS ELEVATION SA101 AMPHITHEATER & BRIDGE FOUNDATION PLAN SA102 AMPHITHEATER ROOF FRAMING PLAN 4F - 25 MECHANICAL M000 MECHANICAL COVER SHEET, LEGEND, GENERAL NOTES, AND SHEET INDEX Ml 10 LOWER LEVEL HVAC PLAN M111 AMPHITHEATER HVAC PLAN M120 COMMUNITY CENTER ROOF HVAC PLAN M400 HVAC SECTIONS M500 HVAC DETAILS AND SCHEDULES M600 HVAC SCHEDULES M700 TEMPERATURE CONTROL DRAWINGS PLUMBING FP 100 COMMUNITY CENTER FIRE PROTECTION PLANS P100 PLUMBING SITE PLAN P 110 COMMUNITY CENTER PLUMBING PLAN PI l AMPHITHEATER PLUMBING PLAN P120 COMMUNITY CENTER ROOF PLUMBING PLAN P300 ENLARGED SCALE PLUMBING PLANS P500 PLUMBING DETAILS P600 PLUMBING SCHEDULES P700 PLUMBING ISOMETRICS ELECTRICAL E001 ELECTRICAL LEGEND AND GENERAL NOTES E010 ELECTRICAL SITE PLAN -NORTH E011 ELECTRICAL SITE PLAN -SOUTH El 10 FIRST FLOOR POWER PLAN El 11 ROOF POWER PLAN E120 AMPHITHEATER POWER PLAN E210 FIRST FLOOR LIGHTING PLAN E220 AMPHITHEATER LIGHTING PLAN E501 ELECTRICAL ONE -LINE DIAGRAM E502 LOW VOLTAGE ONE -LINE & DIAGRAMS E503 LIGHTING CONTROL ONELINE DIAGRAMS E601 AUDIO VISUAL SYSTEM ONELINE DIAGRAMS E700 ELECTRICAL SCHEDULES E701 ELECTRICAL SCHEDULES E702 ELECTRICAL SCHEDULES Page 4 of 5 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit D — Drawings August 26, 2014 E703 ELECTRICAL SCHEDULES MGM 91J 4F - 26 TS-000 TECHNOLOGY SECURITY SYMBOLS & LEGEND TS-200 LOWER LEVEL FLOOR PLAN -TECHNOLOGY SECURITY TS-300 TECHNOLOGY SECURITY DETAILS TS-301 TECHNOLOGY SECURITY DETAILS TS-302 TECHNOLOGY SECURITY DETAILS TS-400 TECHNOLOGY SECURITY DIAGRAMS AND SCHEDULES KITCHEN KA101 KITCHEN AND BAR EQUIPMENT PLAN KA 102 ELECTRICAL KITCHEN PLAN KA103 PLUMBING KITCHEN PLAN KAi04 BUILDING CONDITIONS AND VENTILATION KA 106 WALK IN DETAIL All drawings listed above are dated July 18, 2014 Page 5 of 5 Southlake Community Recreation Center Guaranteed Maximum Price Amendment Exhibit E — Other Documents August 26, 2014 OTHER DOCUMENTS Addendum #1 — Dated July 31, 2014 Addendum #2 — Dated August 1, 2014 4F - 27 Adolfson & Peterson Bid Manual — Dated July 25, 2014 Page 1 of 1