Item 7A
Zoning Change and Concept/Site PlanSouthlake Office Plaza
ZA13-106
Owner: Chapel Crossing Medical Ltd.
Applicant: 3L Realty Group, LLC
Request: Approval of Zoning Change and Concept/Site Plan from “S-P-2” to “S-P-2” to develop an approximately 51,000 square foot, three-story office building in Phase 1 and Concept Plan
approval for an approximately 23,000 square foot expansion
Location: Southwest corner of E. State Hwy. 114 and N. White Chapel Blvd.
ZA13-106
Aerial View
Countryside Bible
Church
Countryside
White Chapel
Office Park
Carillon
Site Plan Approved August 7, 2007
Phase 1 and Phase 2 Concept Plan
S-P-2 Regulations
The proposed “S-P-2” uses and regulations are based on the “O-1” Office District uses and regulations with the following exceptions:
Permitted Uses
All uses permitted in the “O-1” Office District to include the following additional use by right:
Ambulatory Surgery Center
S-P-2 Regulations
Phase 1 Site Plan
20 Covered Parking Spaces
Variance Exhibit
Commercial driveway onto Countryside Ct., which is a local street
± 43’
± 48’
Site Data Summary
Phase 1 Landscape Plan
Tree Conservation Plan
30” Post Oak to be saved
Stucco
Stone
Stone
Stucco
Stucco
Stucco
Stone
Stone
Stone
Stone
Stone
Stone
North
East
West
South
North Elevation – Phase 1
Stone
Stone
Stucco
Stucco
Stone
Stone
South Elevation – Phase 1
Stone
Stone
Stone
Stone
Stucco
Stucco
East Elevation – Phase 1
Stucco
Stucco
Stone
Stone
Stone
West Elevation – Phase 1
Stucco
Stucco
Stone
Stone
Stone
Stone
Future Mechanical Yard Screen Wall
Stone
Stone
Stone
Covered Parking Structures
Stone
Stone
ZA13-106
Planning and Zoning Commission:
July 17, 2014; Approved (6-0) subject to the staff report dated July 11, 2014, subject to Site Plan Review Summary No. 3, dated July 11, 2014, specifically approving the variances requested
in the staff report dated July 11, 2014, and specifically noting the approval of Option “A” with the motion and the disallowance of Option “B” with the motion, also noting the applicant’s
willingness to work with the City as far as the timing and the installation of the deceleration lane onto Countryside Ct. up to City standards and further noting the applicant’s willingness
to work with the City as far timing and what would be required for a left turn lane on northbound White Chapel Blvd., referring to striping and asphalt as staff has presented it.
City Council:
August 5, 2014; the item was tabled on consent to the August 21, 2014 meeting.
Questions?
S-P-2 Regulations
Development Regulations
The development will follow O-1 regulations with the following exceptions:
Current zoning requires 1 space for every 150 square feet for medical office. We are requesting a reduction to 1 space for every 200 square feet overall.
Building height shall be increased to three stories (The O-1 Office District allows a maximum of 2 ½ stories).
Building height shall be increased to 60’ (The O-1 Office District allows a maximum height of 35 feet).
Vertical articulation on the south façade is permitted as shown on the elevations.
Covered parking for physicians (20 spaces) as indicated on the drawings.
Variances Requested
Section 5.2.c prohibits commercial driveways on local and collector streets. A variance is requested to allow a commercial driveway onto Countryside Ct., which is a local street.
Section 5.2.d requires a minimum stacking depth of 100’ for both driveways. A variance is requested to allow the stacking depths as shown on the Site Plan and Concept Plans with approximately
43’ of stacking depth shown on the E. S.H. 114 driveway and approximately 48’ of stacking depth shown on the Countryside Ct. driveway.
1st Floor Plan
Grading Plan
Drainage Area Map
Utility Plan
Storm Sewer Plan
Future North White Chapel
Option “B” Concept Plan