(April 15, 2014)
To: Shana Yelverton, City Manager
From: Robert H. Price, P.E., Director of Public Works
Subject: Approve Change Order No. 1 with Durable Specialties, Inc. for
the Illuminated Street Name Sign and Battery Back-up project
to include the construction of the traffic signal at N. Carroll
Avenue and Federal Way in the amount of $257,410.
Action
Requested: Approve Change Order No. 1 with Durable Specialties, Inc. for the
Illuminated Street Name Sign and Battery Back-up project to
include the construction of the traffic signal at N. Carroll Avenue
and Federal Way in the amount of $257,410.
Background
Information: The purpose of this item is to approve Change Order No. 1 to the
Illuminated Street Name Sign and Battery Back-up Unit Installation
project (ILSN) to include illuminated street name signs for the
Watermere/Jellico intersection with Southlake Boulevard and the
installation of a traffic signal at the intersection of N. Carroll Avenue
and Federal Way.
City Council awarded the ILSN construction contract to Durable
Specialties, Inc. on February 4, 2014. The signs are currently
being manufactured. Installation will begin upon delivery of the
signs.
TxDOT construction of the Watermere/Jellico at Southlake
Boulevard traffic signal and battery back-up began the week of April
7, 2014. TxDOT's construction contract did not include line items
for the illuminated street name sign. This change order will allow
for the installation of the ILSN concurrently with the remainder of
the Southlake Boulevard corridor.
The design of the Traffic Signal Installation at N. Carroll Avenue
and Federal Way is complete and right of way has been confirmed
for the right turn lane of westbound Federal Way to northbound
Carroll Avenue. The right turn lane and 8-foot sidewalk will be
constructed by th Public Works Street Department prior to
installation of the traffic signal. Manufacturing time of the signal
poles is eighteen to twenty weeks. In order to install the signal prior
to the 2014 "Home for the Holidays" event, this change order with
Durable Specialties, Inc. will expedite the order and manufacturing
of the traffic signal poles and mast arms.
The City Attorney's office has reviewed the request to change order
greater than 25% of the original contract and have offered an
opinion that it is acceptable in this case as it is "necessary to
preserve or protect the public health or safety of the municipality's
residents."
Financial
Considerations: The Traffic Signal Installation at N. Carroll Avenue and Federal
Way project is a City Council approved CIP project funded in FY13
and FY14 from the Red Light Camera Fund. Funding for this
project is available in project account 00008 and the approved
budget is $315,000 for engineering and construction.
The illuminated street name sign and battery back-up change order
line items for the Traffic Signal Installation Southlake Boulevard and
Watermere Drive/Jellico Circle W. project will be paid for out of
project's FY13 City Council approved CIP project account 00009.
Strategic Link: The installation of Illuminated Street Name Signs and Battery Back-
up Systems and the Traffic Signal Installation N. Carroll Avenue
and Federal Way project link to the city's strategy map relative to
focus areas of Infrastructure and Mobility. The project will serve
our customers by achieving the highest standards of safety and
security. It provides travel convenience within the City and region.
The specific corporate objectives that are met by this construction
project are to invest to provide and maintain high quality public
assets.
Citizen Input/
Board Review: N/A
Legal Review: The City Attorney has issued an opinion on the legality of this
change order.
Alternatives: The Council may approve the change order or deny it.
Supporting
Documents: Location Map
Change Order No
Staff
Recommendation: Approve Change Order No. 1 with Durable Specialties, Inc. for the
Illuminated Street Name Sign and Battery Back-up project to
include the construction of the traffic signal at N. Carroll Avenue
and Federal Way in the amount of $257,410.
Staff Contact: Robert H. Price, P.E., Public Works Director
Cheryl Taylor, P.E., Deputy Director Public Works/City Engineer
Steven D. Anderson, P.E., CFM, Civil Engineer
w
ti �v 1 i
I f
+ilk A r
117YYYYYY��~�� �-� • � .i1
- , i-•�_ Jay '•�'
' rl { -
0
1.
I.
At
_
I
-j
i
w
SOUTHLAKE CHANGE ORDER No. 1
Date: April 15, 2014
Project: Illuminated Street Name Sign and Battery Back-up System Installation FM1709 - SH114 to Pearson
Owner: City ofSouthlake
Contract: $470.000.00
To: Durable Specialties, Inc.
Contractor
Contract Date: February 4, 2014
You are directed to make the changes noted below in the subject contract for the dollar amount stated below including
all labor, equipment, materials, overhead, and profit:
Nature of changes: add ILSN for Watermere/Jellico, add traffic signal for N. Carroll Ave./Federal Way
Part I
Item
3. 6
5. 8
6. 9*
7. 10*
8. ll*
Part II
Item
1. 3
2. 4
4. 7
Part III
Item
9 1
10 2
11 3
12 4
13 5
14 6
15 7
16 8
17 9
18 10
19 11
20 12
21 13
22 14
ILSN Battery Back-up credit - Pad mounted to pole mounted
Description
Delete - Battery Back-up System for Signal Cabinets Stand Alone
Add - Battery Back-up System for Signal Cabinets Mount Unit
Delete - Concrete Pad
Delete - 1 1/2" PVC SCHD 40 Trench
Delete - BBU Wire
Qty
Unit
Unit Price
Total
14
Ea
$ 7,700.00
$ (107,800.00)
14
Ea
$ 7,400.00
$
103,600.00
14
Ea
$ 365.00
$
(5,110.00)
470
LF
$ 5.00
$
(2,350.00)
1410
LF
$ 1.00
$
(1,410.00)
Total Part I $ (13,070.00)
ILSN - Watermere/Jellico and FM1709
Description Qty Unit Unit Price
Add - Single -Sided Illuminated Street Name Sign Assemblies (8-11) 1 Ea $ 3,450.00 $ 3,450.00
Add - Single -Sided Illuminated Street Name Sign Assemblies (10-11) 3 Ea $ 5,050.00 $ 15,150.00
Add - Traf Sig Cbl (Ty A)(12 AWG)(3 Condr) 585 LF $ 2.00 $ 1,170.00
Total Part II $ 19,770.00
Traffic Signal Installation Carroll Ave. and Federal Way
Description
Qty
Unit
Unit
Price
Add - Drill Shaft (TRF SIG POLE) (24 IN)
24
LF
$
130.00
$
3,120.00
Add - Drill Shaft (TRF SIG POLE) (30 IN)
22
LF
$
200.00
$
4,400.00
Add - Drill Shaft (TRF SIG POLE) (36 IN)
26
LF
$
260.00
$
6,760.00
Add - Mobilization
1
LS
$
1,000.00
$
1,000.00
Add - Barricades, Signs and Traffic Handling
2
MO
$
1,000.00
$
2,000.00
Add - CONDT (PVC) (SCHD 40) (2")
220
LF
$
5.00
$
1,100.00
Add - CONDT (PVC) (SCHD 40) (3")
185
LF
$
9.00
$
1,665.00
Add - CONDT (PVC) (SCHD 40) (3") (BORE)
355
LF
$
18.00
$
6,390.00
Add - CONDT (RM) (2")
20
LF
$
10.00
$
200.00
Add - ELEC CONDT (No. 6) Insulated
30
LF
$
2.00
$
60.00
Add - ELEC CONDT (No. 8) Bare
415
LF
$
2.00
$
830.00
Add - ELEC CONDT (No. 8) Insulated
500
LF
$
2.00
$
1,000.00
Add - ELEC CONDT (No. 12) Insulated
840
LF
$
1.00
$
840.00
Add - Ground Box Ty A (122311) W/Apron
3
Ea
$
700.00
$
2,100.00
1 of 3
Change Order No. 2
23
15
Add - Ground Box Ty C (162911) W/Apron
1
Ea
$ 750.00
$
750.00
24
16
Add - ELC SRV Ty D 120/240 070 (NS)SS(E)PS(U)
1
Ea
$ 4,500.00
$
4,500.00
25
17
Add - Remove SM RD SN SUP & AM
1
Ea
$ 50.00
$
50.00
26
18
Add - Install HWY TRF SIG ( Isolated)
1
Ea
$18,000.00
$
18,000.00
27
19
Add - VEH SIG SEC (12 IN) LED (GRN ARW)
3
Ea
$ 250.00
$
750.00
28
20
Add - VEH SIG SEC (12 IN) LED (GRN)
8
Ea
$ 250.00
$
2,000.00
29
21
Add - VEH SIG SEC (12 IN) LED (YEL ARW)
5
Ea
$ 250.00
$
1,250.00
30
22
Add - VEH SIG SEC (12 IN) LED (YEL)
8
Ea
$ 250.00
$
2,000.00
31
23
Add - VEH SIG SEC (12 IN) LED (RED ARW)
2
Ea
$ 250.00
$
500.00
32
24
Add - VEH SIG SEC (12 IN) LED (RED)
8
Ea
$ 250.00
$
2,000.00
33
25
Add - LED Countdown PED SIG MOD W/Housing
8
Ea
$ 650.00
$
5,200.00
34
26
Add - Back Plate (12 IN) (3 SEC) (Vented) ALUM
7
Ea
$ 110.00
$
770.00
35
27
Add - Back Plate (12 IN) (4 SEC) (Vented) ALUM
2
Ea
$ 130.00
$
260.00
36
28
Add - Back Plate (12 IN) (5 SEC) (Vented) ALUM
1
Ea
$ 175.00
$
175.00
37
29
Add - TRF SIG CBL (Ty A) (14 AWG) (3 CONDR)
50
LF
$ 2.00
$
100.00
38
30
Add - TRF SIG CBL (Ty A) (14 AWG) (7 CONDR)
95
LF
$ 3.00
$
285.00
39
31
Add - TRF SIG CBL (Ty A) (14 AWG) (20 CONDR)
455
LF
$ 4.00
$
1,820.00
40
32
Add - ORN TRF SIG PL ASSM 1 Arm (24')
1
Ea
$23,500.00
$
23,500.00
41
33
Add - ORN TRF SIG PL ASSM 1 Arm (24') & ILSN Arm (9')
1
Ea
$26,500.00
$
26,500.00
42
34
Add - ORN TRF SIG PL ASSM 1 Arm (44') LUM (2) & ILSN Arm (9')
1
Ea
$33,200.00
$
33,200.00
43
35
Add - ORN TRF SIG PL ASSM 1 Arm (48') & ILSN Arm (I P)
1
Ea
$31,000.00
$
31,000.00
44
36
Add - Ornamental PED Pole Assembly (5')
2
Ea
$ 4,205.00
$
8,410.00
45
37
Add - Ornamental PED Pole Assembly (8')
2
Ea
$ 4,405.00
$
8,810.00
46
38
Add - Accessible Pedestrian Signal Units
8
Ea
$ 1,000.00
$
8,000.00
47
39
Add - VIVDS Processor System
1
Ea
$ 7,000.00
$
7,000.00
48
40
Add - VIVDS Camera Assembly
4
Ea
$ 1,400.00
$
5,600.00
49
41
Add - VIVDS Set -Up System
1
Ea
$ 500.00
$
500.00
50
42
Add - VIVDS COM CAB COAX
455
LF
$ 2.00
$
910.00
51
43
Add - Emergency Preemption Phase Selector
1
Ea
$ 4,000.00
$
4,000.00
52
44
Add - Emergency Preemption Detector
4
Ea
$ 800.00
$
3,200.00
53
45
Add - Emergency Preemption Detector Cable
455
LF
$ 1.00
$
455.00
54
46
Add - BBU System (External BATT Cabinet)
1
LF
$ 7,400.00
$
7,400.00
55
47
Add - Single -Sided Illuminated Street Name Sign Assemblies (8-ft)
3
LF
$ 3,450.00
$
10,350.00
Total Part III $ 250,710.00
Total Change Order: S 257,410.00
These changes result in the following adjustment of contract price and contract time:
Contract Price Prior to this Change Order
Net Increase Resulting from this Change Order
Current Contract Price Including this Change Order
$470,000.00
$257,410.00
$727,410.00
2 of 3
The above changes are approved:
Contract Time Prior to this Change
Net Increase Resulting from this Change Order
Current Contract Time Including this Change Order
The above changes are recommended:
'Southlake
City
By:
Title: City Engineer
Date:
By:
Title:
Date:
Change Order No. 2
'Southlake
City
120 calendar d
(Days or Date)
50 calendar days
(Days)
170 calendar d
(Days or Date)
City of Southlake
By:
City
Title:
Project Manager
Date:
City of Southlake
By:
City
Title:
Director of Public Works
Date:
By:
Date:
Contractor
3of3