Item 6B (2)
Southlake Town Square
THE GARDEN DISTRICT
Garden District Sales Center
Specific Use Permit (Case ZA14-011)
Submittal to City Council
April 1, 2014
Garden District Sales Center – Front Elevation
2
Garden District Sales Center – Exterior Features/Revisions
Added custom windows to front elevation
More neutral beige exterior
Added pitch to roof, allows for 8’ 8” interior ceiling height
Natural wood frame deck and railings
Sign image added (for information, not approval)
Outside terrace and trellis for entertaining
Barbecue vignette
ADA accessible via sidewalk to terrace
Parking – 2 designated spaces, 1 handicap accessible
Landscaping program integrates with overall plan
Traffic island reshaped in front of Federal Way
More than 200’ from an occupied residence
Garden District Site Plan
Garden District Sales Center – Landscape Plan
Garden District Sales Center – Time Line
Permit Request: 5 year term to cover multiple development projects.
Brownstones
April 2014 – Land Development Begins
June 2014 – Sales Center opens
June 2014 – Model/Spec Homes begin Construction
March 2015 – First resident move-in
2015-2016 – Projected Sell-Out
The Residences (Block 4R1)
2014 – Pre-Development Design and Marketing
2015/2016 – Projected Construction Period
2016 – Projected Sell-Out
Garden District Residences (3 Buildings)
2015/2016 – Pre-Development Design and Marketing
2016/2018 – Projected Construction Period
2019 – Projected Sell-Out
Garden District Sales Center – Front Elevation
7