Item 6B (2)
Southlake Town Square
THE GARDEN DISTRICT
Garden District Sales Center
Specific Use Permit (Case ZA14-011)
Submittal to City Council
March 18, 2014
Garden District Site Plan
Garden District Sales Center – Background
In November 2013, the Garden District was approved for the following:
33 Brownstones
38 Condominium Residences (Block 4R1)
60 Condominium Residences (Garden District - 3 buildings)
Start of the 38 Condominium Residence building is subject to:
Sale or start of 55% of the Brownstones (19 homes)
Pre-Sale “Firm” Contracts on 50% of the Condominiums
The Brownstone SUP has a 1-year term to begin construction
The Condominium SUP has a 2-year term to begin construction
Garden District Sales Center – Landscape Plan
Garden District Sales Center – Exterior Features
More than 200’ from an occupied residence
28’ x 58’ sales center trailer with flat roof
Enhanced planked siding, custom windows
Full utility connections
Outside terrace and trellis for entertaining
Barbecue vignette
ADA accessible via sidewalk to terrace
Parking – 2 designated spaces, 1 handicap accessible
Landscaping program integrates with overall plan
Traffic island reshaped in front of Federal Way
Garden District Sales Center – Front Elevation
Garden District Sales Center – Interior Features
Sales Reception with Southlake storyboards
Sales Floor with Site Plan Table and Wall Displays
Full Kitchen Vignette
Master Bathroom Vignette
iPads for self-directed information
Double-doors out to Entertainment Terrace
Administrative office area
Garden District Sales Center – Time Line
Permit Request: 5 year term to cover multiple development projects.
Brownstones
April 2014: Land Development Begins
June 2014: Sales Center opens
June 2014: Model/Spec Homes begin Construction
March 2015: First resident move-in
2015/2016: Projected Sell-Out
The Residences (Block 4R1)
2014: Pre-Development Design and Marketing
2015/2016: Projected Construction Period
2016/2017: Projected Sell-Out
Garden District Residences (3 Buildings)
2015/2016: Pre-Development Design and Marketing
2016/2018: Projected Construction Period
2019: Projected Sell-Out
Garden District Sales Center