Item 6E and 6FKimball Park City Council March 4, 2014
Jeffrey MediciMedici Development PartnersOverall Site DevelopmentMichael Lusick Sr.Senior Director – Cambria Brand OperationsChoice Hotels InternationalScott P. Rosenberg,
AIA, MRICS, LEED, APSenior Vice President/PrincipalJonathan Nehmer + Assoc., Inc.Michael DeMariaOwner M Culinary ConceptsMichael ReinardySenior Vice PresidentFillmore Capital
Partners Philip StewartMyhre Group ArchitectsHotel Design and RenderingsJimmy FechterAdams Engineering/Landscape & Site PlanJack GarnerAdams Engineering/Hydrology
Real Estate Development
Hotel Management
Franchisee Management
Site Planning
Hotel Architecture
Landscape Design
Civil Engineering
Hydrology
Interior Design
Restauranteur
Kimball Park
Team Members
Experience
Action Items from City Council Approval (6-1, February 18, 2014)
1) Detailed entry feature on front southeast corner of the hotel, which may include fountains, landscape islands and detailed renderings of such
6) Detailed renderings for conference center from the Kimball approach which would also include traffic circle.
3) Discussion of the property owner’s agreement and how that may work regarding the project
2) Regarding Lot 6, a detailed landscape plan showing how that can be incorporated with the federal requirements to not disturb the floodway
5) Also regarding Lot 6, noting what can be manicured to the extent to provide for periodic maintenance within the floodway in connection with Lot 6 landscape detail and provide detailed
plant material for entire project
4) Detailed floor plans, more specifically the first floor and within that floor plan a detail of the outdoor public spaces and how those will be incorporated into the hotel
Kimball Park
MDP
Adams
Hotel Team
Additional questions to be answered:
How are we going to ensure the quality of materials inside the building are to Southlake’s high standards?
Can we get more specifics around the restaurant (e.g. menu, etc.)?
Can we reduce size of logo on the tower?
Will there be enough parking for the office?
Trash pickup for hotel?
Kimball Park
Kimball Park
Action Items from City Council Approval (6-1, February 18, 2014)
1) Detailed entry feature on front southeast corner of the hotel, which may include fountains, landscape islands and detailed renderings of such
6) Detailed renderings for conference center from the Kimball approach which would also include traffic circle.
3) Discussion of the property owner’s agreement and how that may work regarding the project
2) Regarding Lot 6, a detailed landscape plan showing how that can be incorporated with the federal requirements to not disturb the floodway
5) Also regarding Lot 6, noting what can be manicured to the extent to provide for periodic maintenance within the floodway in connection with Lot 6 landscape detail and provide detailed
plant material for entire project
4) Detailed floor plans, more specifically the first floor and within that floor plan a detail of the outdoor public spaces and how those will be incorporated into the hotel
Kimball Park
MDP
Adams
Hotel Team
Detailed entry feature on front southeast corner of the hotel, which may include fountains, landscape islands and detailed renderings of such
Kimball Park
PREVIOUS
Detailed entry feature on front southeast corner of the hotel, which may include fountains, landscape islands and detailed renderings of such
Kimball Park
CURRENT
Detailed entry feature on front southeast corner of the hotel, which may include fountains, landscape islands and detailed renderings of such
Kimball Park
Detailed renderings for conference center from the Kimball approach which would also include traffic circle.
Kimball Park
Detailed renderings for conference center from the Kimball approach which would also include traffic circle.
Kimball Park
Detailed renderings for conference center from the Kimball approach which would also include traffic circle.
Kimball Park
Discussion on Property Owners’ Agreement (CREs) and how that may work regarding the project
Declaration of Covenants, Restrictions and Easements (CREs)
Negotiated with Fillmore Capital over the last 3 months
Final exhibits will be included after city approval
Will be signed at closing with Fillmore/Choice
Key points:
Property rights of the common areas
Defines responsibilities of lot owners/developer
Maintenance/overall site management
Architectural Control
Shared parking agreements
Property Uses
Outlines transition plan
Kimball Park
Discussion on Property Owners’ Agreement (CREs) and how that may work regarding the project (cont.)
Architectural Control Committee (ACC)
3-5 members
No improvement can be made without ACC approval
Article VII, Section 2(b)
The ACC shall unanimously adopt uniform criteria for the design, materials, finishes and external appearance of Improvements, with the objective of ensuring a harmonious appearance within
the Development (giving due weight to maintaining such harmony with the Initial Hotel Improvements).
Maintenance
Article VIII, Section 1
The Association shall landscape, operate, manage, insure, repair and replace all of the Common Properties and Common Area so as to maintain them in a clean, neat, attractive and generally
first rate condition that is at least as good as that maintained by other, reasonably comparable mixed use office/hotel projects in the vicinity of the Development
Kimball Park
Action Items from City Council Approval (6-1, February 18, 2014)
1) Detailed entry feature on front southeast corner of the hotel, which may include fountains, landscape islands and detailed renderings of such
6) Detailed renderings for convention center from the Kimball approach which would also include traffic circle.
3) Discussion of the property owner’s agreement and how that may work regarding the project
2) Regarding Lot 6, a detailed landscape plan showing how that can be incorporated with the federal requirements to not disturb the floodway
5) Also regarding Lot 6, noting what can be manicured to the extent to provide for periodic maintenance within the floodway in connection with Lot 6 landscape detail and provide detailed
plant material for entire project
4) Detailed floor plans, more specifically the first floor and within that floor plan a detail of the outdoor public spaces and how those will be incorporated into the hotel
Kimball Park
MDP
Adams
Hotel Team
Kimball Park
Kimball Park
Kimball Park
Kimball Park
Kimball Park
Action Items from City Council Approval (6-1, February 18, 2014)
1) Detailed entry feature on front southeast corner of the hotel, which may include fountains, landscape islands and detailed renderings of such
6) Detailed renderings for convention center from the Kimball approach which would also include traffic circle.
3) Discussion of the property owner’s agreement and how that may work regarding the project
2) Regarding Lot 6, a detailed landscape plan showing how that can be incorporated with the federal requirements to not disturb the floodway
5) Also regarding Lot 6, noting what can be manicured to the extent to provide for periodic maintenance within the floodway in connection with Lot 6 landscape detail and provide detailed
plant material for entire project
4) Detailed floor plans, more specifically the first floor and within that floor plan a detail of the outdoor public spaces and how those will be incorporated into the hotel
Kimball Park
MDP
Adams
Hotel Team
Kimball Park
4) Detailed floor plans, more specifically the first floor and within that floor plan a detail of the outdoor public spaces and how those will be incorporated into the hotel
Additional Seating (conf.)
Firepit
Different seating options
Arbor
Roll-up bar service
8ft masonry wall
Additional landscaping
1
2
3
4
4
4
5
6
7
4) Detailed floor plans, more specifically the first floor and within that floor plan a detail of the outdoor public spaces and how those will be incorporated into the hotel
Kimball Park
Jeffrey MediciMedici Development PartnersOverall Site DevelopmentMichael Lusick Sr.Senior Director – Cambria Brand OperationsChoice Hotels InternationalScott P. Rosenberg,
AIA, MRICS, LEED, APSenior Vice President/PrincipalJonathan Nehmer + Assoc., Inc.Michael DeMariaOwner M Culinary ConceptsMichael ReinardySenior Vice PresidentFillmore Capital
Partners Philip StewartMyhre Group ArchitectsHotel Design and RenderingsJimmy FechterAdams Engineering/Landscape & Site PlanJack GarnerAdams Engineering/Hydrology
Real Estate Development
Hotel Management
Franchisee Management
Site Planning
Hotel Architecture
Landscape Design
Civil Engineering
Hydrology
Interior Design
Restauranteur
Kimball Park
Team Members
Experience
Kimball Park
Additional questions that have been answered:
How are we going to ensure the quality of materials inside the building are to Southlake’s high standards?
Can we get more specifics around the restaurant (e.g. menu, etc.)?
Can we reduce size of logo on the tower?
Will there be enough parking for the office?
Trash pickup for hotel?
Kimball Park
Questions??
Kimball Park
Kimball Park
Kimball Park
Kimball Park
2nd Floor
3rd Floor
4th Floor
Masonry Ordinance: Stucco System
Kimball Park
Bowen cross-access
Cambria Southlake
February 18th, 2014
Fillmore Capital Partners
51
Focused Primarily on Hospitality and Healthcare Sectors
Over $3 Billion of Assets Under Management
Principals with 25+ Years Experience Working Together
Integrated Real Estate Development, Investment, and Management Firm
Matching the Strategy to the Opportunity
Fillmore Hospitality
52
11 Properties
2,500+ Room Portfolio
Employees 1,000+ Associates Nationwide
Anticipates being Listed as a Top 50 Management Firm in 2013
Develop ● Own ● Operate
Broad-Based Experience
53
Unmatched expertise across the spectrum of hospitality products
Destination Resorts
Upscale Hotels
Luxury Boutique Hotels
Urban Commercial Hotels
Executive Conference Centers
Fillmore Hospitality
54
Renaissance Boston Waterfront Hotel
Boston, MA
Pier 2620 Hotel Fisherman’s Wharf
San Francisco, CA
Representative Portfolio Hotels
Fillmore Hospitality
55
Sea Ranch Lodge
Northern Coast, CA
Maison Dupuy Hotel
New Orleans, LA
Representative Portfolio Hotels
Kimball Park City Council February 18, 2014
Kimball Park
Kimball Park
Approved Site Plan
H
C
E
R
Kimball Park
Site Challenges
Kimball Park
Site Challenges
Kimball Park
Site Challenges
Kimball Park
Site Challenges
Kimball Park
Site Challenges
Considered Jurisdictional Waters of the United States*
Subject to Federal regulation under the jurisdiction of USACE
Requires Nationwide 39 Permit
½ acre/300 linear ft. (waiver up to 700 linear ft.)
Landscape and “clean up” drainage area within limits established by NW 39 permit
Kimball Park
Site Challenges
Kimball Park
Site Challenges
Kimball Park
Site Challenges
Kimball Park
Approved/Proposed Zoning
Feedback - Neighborhood Outreach
Commercial Neighbors
100% Support
SPIN Meeting (January 2014)
Width of roadways (will they be able to support fire equipment?)
Variance requests
Sewer connectivity for one of our commercial neighbors
SPIN Meeting from (July 2012)
Noise
Trash
Line of site from hotel rooms
Kimball Park
Feedback – Planning & Zoning Commission
Wanted to see…
office concept renderings
a hotel design w/ more modern “Wow” factor
the conference center entry to “stand out”
better renderings of the site/hotel
hotel entrance/dropoff enhanced
better landscaping on eastern elevation
better description of what Choice was doing “special” for Southlake (what makes this better than other Cambrias?)
Kimball Park
Feedback – Everyone else
Site Plan is the best yet
Cambria is a 7-year old, upscale brand
fear of the unknown
what are we getting?
what is the quality?
Cambria compliments (not cannibalizes) Hilton
All-suite hotel w/ larger rooms
Enhanced Fitness Center
Central point for guests to eat/work/drink/gather
Like the complimentary uses of hotel/office/restaurant/retail
Understand the challenges of working with this site
What plans do you have for signage development
Kimball Park
Kimball Park
Kimball Park
Detailed Site Plan Zoning
Lot 1 Hotel
Lot 6 Open Space/
Entrances
Kimball Park
Concept Plan Zoning
Lot 2 Restaurant
Lot 3 Office
Lot 4 Restaurant
Lot 5 Restaurant/Retail
1
2
3
4
5
6
Kimball Park
Overall Development – Entrances
Kimball Park
Overall Development - Kimball Entrance
Kimball Park
Overall Development – Circular Drop-off
O
C
R
Kimball Park
Overall Development – Detention
Lot 1 - Hotel
Cambria Suites hotel with upscale rating according to Smith Travel Research
175 guest suites
Average Room Size: 405sf (355sf-596sf)
Ballroom w/ capacity of 264 people
8,380 sf conference center w/ 5,100 sf meeting space
1,995 sf fitness center
Outdoor Services include:
Patio containing leisure area w/ pool, fireplace and dining
Roll-out bar service
Patio for conference center spill out
Shuttle service available to points of interest (i.e. Town Square)
Kimball Park
Kimball Park
Lot 1 - Hotel
Lot 2 – Restaurant/Sit Down
Concept Plan proposes an out-parcel lot for a sit-down restaurant
10,000sf footprint and 63 parking spaces
Outdoor waiting area w/ bar service
15x25 sign easement will run with sale of property
Kimball Park
2
Lot 3 – Office
Concept plan proposes development of a 3-story office development
32,000sf footprint (total of 96,000sf)
326 parking spaces
Kimball Park
3
Kimball Park
Park Village
Kimball Park
Kimball Park
Kimball Park
Lot 4 – Restaurant/Coffee
Concept Plan proposes an out-parcel lot for a restaurant
4,500sf footprint and 52 parking spaces
Drive-thru
Kimball Park
4
Lot 5 – Restaurant/Retail
Concept Plan proposes an out-parcel lot for a restaurant/retail/health and well-being use
9,222sf footprint and 53 parking spaces
Ample space for outdoor dining and plaza space
Kimball Park
5
Lot 5 – Restaurant/Retail
Kimball Park
Kimball Park
Kimball Park
Approved Hotel/Conference/Entertainment
Approved by City Council at 2nd Reading (7-0) on September 4, 2012
Kimball Park
Approved by City Council at 2nd Reading (7-0) on September 4, 2012
Kimball Park
Approved by City Council at 2nd Reading (7-0) on September 4, 2012
Kimball Park
Kimball Park
Dining Options within the Proposed Development
New option from original approved site plan
The Cambria Suites brand is measured in the JD Power & Associates North America Hotel Guest Satisfaction Index Study and achieved a score of 843 out of 1000. This is the highest score
in the Upscale Hotel Segment for the second year in a row.
This information is not currently available for consumer publication, as The Cambria Suites brand does not meet the minimum threshold for number of hotels open and operating to qualify
for formal publication.
Lessons learned from 1st Generation
18 months of customer research on how to evolve the Cambria brand
Significant corporate investment in Cambria Gen2
Southlake will be THE launching point for Gen2
New Design Elements
What are we doing “special” for Southlake?
Miami, FL
Plano – Legacy Town Center (under development)
Next Generation Cambria - Arrival Experience
Next Generation Cambria - Arrival Experience
Next Generation Cambria – Guest Room
Next Generation Cambria – Food and Beverage
Next Generation Cambria – Food and Beverage
Cambria Southlake
February 18th, 2014
Fillmore Capital Partners
108
Focused Primarily on Hospitality and Healthcare Sectors
Over $3 Billion of Assets Under Management
Principals with 25+ Years Experience Working Together
Integrated Real Estate Development, Investment, and Management Firm
Matching the Strategy to the Opportunity
Fillmore Hospitality
109
11 Properties
2,500+ Room Portfolio
Employees 1,000+ Associates Nationwide
Anticipates being Listed as a Top 50 Management Firm in 2013
Develop ● Own ● Operate
Broad-Based Experience
110
Unmatched expertise across the spectrum of hospitality products
Destination Resorts
Upscale Hotels
Luxury Boutique Hotels
Urban Commercial Hotels
Executive Conference Centers
Fillmore Hospitality
111
Renaissance Boston Waterfront Hotel
Boston, MA
Pier 2620 Hotel Fisherman’s Wharf
San Francisco, CA
Representative Portfolio Hotels
Fillmore Hospitality
112
Sea Ranch Lodge
Northern Coast, CA
Maison Dupuy Hotel
New Orleans, LA
Representative Portfolio Hotels
Kimball Park
Presentation to the City of Southlake, Texas
City Council
February 18, 2014
Philip L. Stewart, AIA, NCARB
Myhre Group Architects Inc.
P&Z Feedback From January 9th & February 6th Hearings
Building design should be unique to Southlake.
Facility should improve upon its like competition.
Provide a more flowing transition between traffic circle and entrance to Conference Center.
Enhance the pavement surface at the hotel lobby entrance (Porte- Cochere) in a manner that is complementary to the traffic circle.
Include landscape buffers on all elevations of the building.
Create a pedestrian connection between the hotel and the green space amenity (Lot 6).
Kimball Park
Nearby Precedents
Hilton Southlake Hotel
1400 Plaza Place
Southlake, Texas 76092
Number of Stories: 5
Exterior Materials: Stone, Stucco, EIFS
Brick/Stone: 20% of facades
Hilton Garden Inn
205 W. State Highway 114
Grapevine, Texas 76051
Number of Stories: 4
Exterior Materials: Brick, EIFS
Brick/Stone: Less than 10%
Nearby Precedents
Marriott Solana
5 Village Circle
Westlake, Texas 76262
Number of Stories: 7
Exterior Materials: Stucco, EIFS
Brick/Stone: 0% of facades
Residence Inn
2020 State Highway 26
Grapevine, Texas 76051
Number of Stories: 8
Exterior Materials: Stone, EIFS
Brick/Stone: Approximately 12%
Nearby Precedents
Courtyard / TownePlace Suites
2200 Bass Pro Court
Grapevine, Texas 76051
Number of Stories: 6
Exterior Materials: Stone, EIFS
Brick/Stone: 16% of facades
Cambria Hotel and Suites
North Kimball Road
Southlake, Texas 76092
Number of Stories: 4
Exterior Materials: Brick, Stucco, Metal
Brick/Stone: 71% & 62% on street- facing elevations and
25% on other elevations
View From West-bound Highway 114
View From East-Bound Highway 114
Entry From Highway 114 Frontage Road
Entry From North Kimball Road
View of Southeast Corner
View of Northeast Corner
Brand Signage: Day and Night
Kimball Park
Questions??
Kimball Park
CONTACT INFORMATION:MEDICI DEVELOPMENT PARTNERS1203 S. WHITE CHAPEL BLVDSUITE 100SOUTHLAKE, TEXAS 76092CONTACT: JEFF MEDICIPHONE: (214) 784-1617EMAIL: jeff@medicidp.com
Kimball Park
ADAMS ENGINEERING
910 S. KIMBALL AVENUE
SOUTHLAKE, TEXAS 76092
CONTACT: JIMMY FECHTER
PHONE: (817) 328-3200
EMAIL: jimmy.fechter@adams-engineering.com
Masonry Ordinance: Stucco System
Exterior Elevations
Exterior Elevations
Kimball Park
Open-concept suite
Traditional suite
Kimball Park
Hotel Rendering – NE Corner
Kimball Park
North/East Elevations
Kimball Park
South/West Elevations
Masonry Ordinance: Stucco System
Kimball Park: Cambria Suites Hotel
✖
✖
✖
✖
✖
✔
✖
✖
✖
✖
✔