Loading...
Item 6C - Traffic Review Letter7 3030 LBJ FREEWAY SUITE 1660 WALLAS, TX 75234 972-248-3006 www.LeeEngineering.com ��� �n nna��inc February 26, 2014 Miss Alex Ayala City of Southlake 1400 Main Street, Suite 320 Southlake, Texas 76092 Re: Remington Estates Traffic Impact Review Dear Miss Ayala: Per your request, we have reviewed the trip generation letters related to the proposed Remington Estates development along Shady Lane in Southlake. The trip generation letters were prepared by Binkley & Barfield !C&P and dated on December 2, 2013 and January 29, 2014. The development plan provided included a site plan with 23 proposed single family residential lots. Our review comments are numbered for ease of reference and the numbering does not imply any ranking. We have divided our comments into two categories — Informational Comments are those that require no action by the city or the applicant. Action Comments are those that require a response or action by the City or applicant. We offer the following comments on the submitted traffic impact analysis. INFORMATIONAL COMMENTS (REQUIRE NO ACTION BY CITY OR APPLICANT) The trip generation estimates prepared by the applicant utilized the Institute of Transportation Engineers (ITE) Trip Generation average rates for the daily, AM peak, and PM peak hour trip generation. In Trip Generation, ITE provides regression equations for some land uses, including for land use 210: Single Family Detached Housing. Typically the regression equations should be used, unless the development falls outside the typical sample size of the data set. A comparison of the trip generation provided by the developer versus trip generation using the regression equations are provided in the table below. Table 1: Difference between Average Rate and Regression Equation Usage Method Dwelling Daily Total AM AM AM PM PM PM Units Trips Entering Exiting Total Entering Exiting Total Average 23 219 4 13 17 14 9 23 Rates Regression 23 272 7 19 26 18 10 28 Equations Difference - +53 +3 +6 +9 +4 +1 +5 t� OF EX CAR S I E As can be seen, use of the regression equation results in higher predicted trip numbers and may represent a more conservative impact assessment. The average sample size in the ITE data set is 194 to 207 dwelling units for the three time periods studied. Because the Remington Estates development is significantly smaller than the average development in Trip Generation, the regression equation may overestimate the number of trips for smaller scale developments. Use of the average rates as presented by the developer is acceptable in this instance, is within industry norms, and the study does not require revision. The total number of trips predicted to be generated by the development on both a daily basis and during the PM Peak hour are far below the City of Southlake established thresholds for requiring a TIA. A full TIA is not necessary for this development nor would it show any significant impacts created by the development. The trip generation letter from January 29, 2014 compares the differences in trips generated by 13 lots allowed under existing zoning with the 23 lots proposed for the development. Table 2 below illustrates the differences in the existing zoning and proposed zoning trip generation if the regression equations are used. Table 2: Difference between Existing Zoning and Proposed Zoning using regression equations Method Dwelling Daily Total AM AM AM PM PM PM Units Trips Entering Exiting Total Entering Exiting Total Regression Equations 13 161 5 14 19 11 6 17 (Existing Zoning) Regression Equations 23 272 7 19 26 18 10 28 (Proposed Zoning) Difference +10 D.U. +111 +2 +5 +7 +7 +4 +11 4. There is undeveloped land adjacent to the proposed development that may in the future develop as single family residential housing. The exact number of lots or timeframe for development is completely unknown at this time. However, for the purposes of this traffic review, Lee Engineering has estimated that 8 additional lots would be developed on the remaining property adjacent to the proposed development. The trip generation range for the total of 31 lots is shown in Table 3 below with both average rates and regression equation trip generation presented. 2 5� YEARS of EXC MINCE Table 3: Estimated range of trip generation ultimate build out Method Dwelling Units Daily Total AM AM AM PM PM PM Trips Entering Exiting Total Entering Exiting Total Average 31 295 6 17 23 20 11 31 Rate (23 + 8 future) Regression 31 Equations (23 f 8 future) 358 8 23 31 23 14 37 The developer made an assumption that all outbound trips would access the SH 114 frontage road. Additionally, the developer estimated that less than 20%of inbound traffic would use Shady Lane to access the Remington Estates. After reviewing approach and departure paths in the area, we think it is likely that a somewhat higher percentage of both entering and exiting traffic is likely to access the development via Shady Lane to or from the north. o For traffic entering Remington Estates, traffic approaching from the west, north, and south may all find access to Remington Estates to be more convenient from Shady Lane to the north than from the westbound SH 114 frontage road depending on the time of day and prevailing traffic conditions at the time. o For traffic exiting Remington Estates, traffic exiting to the north and to some destinations to the west may find Shady Lane a more convenient exit route than SH 114. o The distribution of traffic into and out of Remington Estates will vary based on individual motorists preferences, and will vary based on time of day and prevailing traffic conditions at the time. o Turning movement counts could be performed to determine existing directional splits along Shady Lane at Kimball versus SH 114, however, even if these splits were applied to Remington Estates estimated trip generation, no significant effects on capacity or delay would be predicted. o No revision to the study is necessary to account for the differing opinions on approach and departure paths due to the overall low peak hour volumes being projected. Ultimately the AM and PM peak hour volumes of traffic predicted to be generated by Remington Estates are so low, that the increase in traffic from the new development should be hard to perceive along Shady Lane. The volumes are low enough to almost blend into daily variations of traffic. o The absolute worst case from a resident's perspective would be a PM Peak hour where all build out traffic traveled through the Shady Lane at Kimball intersection. Under this scenario, only 23 cars would be entering the new development (at build out) and only 14 would be exiting the development (at build out). o A majority of outbound traffic will use the Shady lane at SH 114 intersection and at least 25-50% of inbound traffic would be expected to use the SH 114 intersection as well. The proposed development, along with additional future development of 8 lots, would be expected to generate no more than 21 total PM peak hour trips on Shady Lane north of Remington Estates. 3 YEARS OF EXCELLENCE ACTION COMMENTS (REQUIRE RESPONSE OR ACTION BY CITY OR APPLICANT) 7. Construction traffic for the development should be restricted to the segment of Shady lane between SH 114 and the proposed Remington Estates roadway. If you have any questions, please contact me at (972) 248-3006. We appreciate the opportunity to provide these services and are available to address any additional comments or concerns. Sincerely, Irk L24-� rT John P. Denholm III, P.E., PTOE Sr. Project Engineer Lee Engineering TBPE Firm F-450 4 Y E A R S Of ER¢EII M E