Item 6I r -C,S�v. t-eu, `ry Southlake Town Square Garden District Proposed Development Phasing Plan Phase I — Stage 1 (Land Development): • Projected Timing o Land development - March 2014 to June 2014 o First Brownstones (Model, Spec homes) construction begins July 2014 • Site Work o Mass Grading of entire site o Shaping of Oval Park o Slope shaping of open space to Park Ridge Boulevard • Road Construction o Meeting Street constructed o Summit Avenue extended to Meeting Street o Park Ridge Boulevard reconfigured to eliminate median o Alley extended east to Park Ridge Boulevard • Brownstone Lot Development o Storm Water pipe installation (New lines on Meeting Street and Park Ridge Blvd frontage) o Sewer pipe installation (New line on Meeting Street, existing on Park Ridge Blvd) o Electric Power installation in alley (including transformer relocation) o Natural Gas Lines installed (Connection to existing distribution line in alley) o Telecommunication lines installation in alley Phase I — Stage 2 (Landscape / Hardscape): • Projected Timing o Landscape /Hardscape installation - December 2014 to March 2015 o First Brownstones (Model, Spec homes) construction completion — May 2015 • Oval Park Landscape and Hardscape o All walking paths and interior retaining walls installed o Park/Street trees and other landscaping installed o Benches, tables, future art plaza installed o Community garden installed o Bocce Court installed • Dog Park Installation o Fencing, play area, double gate • Open Space Landscaping o Sprigged with Coastal Bermuda grass (temporary irrigation) o Wildflower seed in designated areas