Item 4GCITY OF
SOUTHLAKE
MEMORANDUM
November 14, 2013
To: Shana Yelverton, City Manager
From: Chris Tribble, Director of Community Services
Subject: Approve Guaranteed Maximum Price with Dean
Construction for Construction Manager at -Risk Services
for Bicentennial Park Improvements
Action
Requested: Approve Guaranteed Maximum Price amendment with Dean
Electric, Inc. dba Dean Construction in the amount of
$12,320,196 for Construction Manager at -Risk Services for
Bicentennial Park Improvements.
Background
Information: Based on recommendations from a bid review committee,
Parks & Recreation Board and Southlake Parks
Development Corporation, and a proven track record of
previous City projects, City Council awarded (7-0) a contract
on October 2, 2012, for Construction Manager at -Risk
(CMAR) services to Dean Construction for the Phase 2
improvements at Bicentennial Park with the Guaranteed
Maximum Price (GMP) amendment to be considered by City
Council once actual construction costs are determined.
Construction costs have been determined and the next step
is consideration of the GMP at this time.
Below is a recap of events for this project to date.
June 21, 2011 - The City Council approved professional
services contract with Schrickel Rollins and Associates
(SRA) to design the Bicentennial Park Improvements.
September 17, 2011; December 5, 2011; & January 23,
2012 — Community meetings were held to present site plan
concept and playground concepts to residents.
City of Southlake Values.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork
Shana Yelverton, City Manager
Meeting Date — November 19, 2013
Page 2 of 4
June 24, 2012 & July 8, 2012 - The City advertised
Requests for Proposals for Construction Manager at -Risk
(CMAR) services.
June 25, 2012 — SPIN Meeting was held.
July 9, 2012 — Concept and Site Plan were reviewed and
approved by Parks & Recreation Board.
July 19, 2012 -A CMAR pre -proposal meeting was held.
July 27, 2012 — CMAR proposals were received and
opened. A review committee recommended Dean
Construction to the Parks & Recreation Board, Southlake
Parks Development Corporation (SPDC) and City Council.
August 23, 2012 — Site Plan and variance requests were
reviewed and approved by Planning and Zoning.
September 4, 2012 - Site Plan was reviewed and approved
by SPDC and City Council.
September 10, 2012- The Parks and Recreation Board
recommended approval of CMAR contract with Dean
Construction to City Council.
September 18, 2012 - Site Plan and variance requests were
reviewed and approved by City Council.
October 2, 2012 — SPDC and City Council approved the
CMAR contract with Dean Construction.
August 9, 2013 — SRA completed construction documents.
August 18, 2013 thru September 1, 2013 - Dean
Construction advertised for construction bids. A pre -bid
meeting was held September 4, 2013.
September 18, 2013 - Bids were opened and GMP
established.
City of Southlake Values.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork
Shana Yelverton, City Manager
Meeting Date — November 19, 2013
Page 3 of 4
Dean Construction has bid the project, and submitted a
proposed Guaranteed Maximum Price (GMP) of
$12,320,196 to complete the project.
The current SPDC CIP project budget for the next phase of
Bicentennial Park is $12,467,891.
Based on expenditures to date, the anticipated owner costs,
and the GMP, the project stands at $1,408,471 (11 %) over
budget.
Project Budget $12,467,891
Expenditures to Date - $ 1,271,950
Anticipated Owner Costs - $ 284,217
CMAR GMP - $12,320,196
Amount over Budget - $ 1,408,471
To make up the budget shortfall, several options were
presented to the City Council during the November 5, 2013
Work Session.
Following the discussion, the consensus of the City Council
was to proceed with OPTION B to fund the project.
Accordingly, Item 4G has been placed on your agenda to
allow for the required amendment to the FY 2014 SPDC CIP
Capital Budget for Bicentennial Park Phase 2.
This item has been placed on your agenda for City Council
approval of the Guaranteed Maximum Price with Dean
Construction in the amount of $12,320,196 for Construction
Manager at -Risk Services for Bicentennial Park
Improvements.
Financial
Consideration: Funding in the amount of $12,467,891 is currently allocated
within the SPDC CIP for Bicentennial Park Phase 2.
Approval of Item 4G will amend the FY 2014 SPDC CIP
Capital Budget for Bicentennial Park Phase 2, and bring the
total funding available to $13,876,362 for completion of the
project.
City of Southlake Values.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork
Shana Yelverton, City Manager
Meeting Date — November 19, 2013
Page 4 of 4
Strategic Link: This item is linked to the City's Strategy Map related to the
focus area of Quality Development and meets the corporate
objectives to Provide Attractive and Unique Spaces for
Enjoyment of Personal Interests and Invest to Provide and
Maintain High Quality Public Assets. It also addresses the
City's Critical Business Outcomes CB01 by continuing to
implement Southlake 2030 Plan by focusing on short-term
initiatives.
Citizen Input/
Board Review: Several public meetings have been held since 2011
including:
➢ SPIN Meeting
➢ Parks & Recreation Board Meetings
➢ SPDC Meetings
➢ Planning & Zoning Meeting
➢ City Council Meetings
Legal Review: The attached agreement has been previously reviewed and
approved by the City Attorney.
Alternatives: Alternatives may include:
■ Approve Guaranteed Maximum Price with Dean
Construction as presented
■ Approve Guaranteed Maximum Price with Dean
Construction with input as desired
■ Not approve Guaranteed Maximum Price
Supporting
Documents:
■ Al21 CMc Amendment establishing Guaranteed
Maximum Price (GMP) Exhibit A
Staff
Recommendation: Approve Guaranteed Maximum Price with Dean Electric, Inc.
dba Dean Construction in the amount of $12,320,196 for
construction of the next phase of improvements at
Bicentennial Park.
City of Southlake Values.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork
A
"
Document Al33TM - 2009 Exhibit A
Guaranteed Maximum Price Amendment
for the following PROJECT:
(lrarne and address or location)
Bicentennial Parts Development
450 N_ Southlake Blvd.
Scruthlake, T% 76092
THE OWNER:
(Name, legal status and address)
City of Southlake
1400 Main Street
Southlate, T% 76ID92
THE CONSTRUCTION MANAGER:
(Name, legal status and address)
Dean Electric, Inc. dba Dean Construction
701 Hall Street
Cedar Hill, TZ 75104
This document has important legal
consequences. Consultation with
an attorney is encouraged with
respect to its completion or
modification.
AIA Document A201711--2007,
General Conditions of the
Contract for Construction, is
adopted in this document by
reference. Do not use with other
general conditions unless this
document is modified.
ARTICLE A.1
§ A.1.1 Guaranteed Maximum Price
Pursuant to Section 2.2.6 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to
establish a Guaranteed Maximum Price. As agreed by the Owner and Construction Manager, the Guaranteed Maximum
Price is an amount that the Contract Sum shall not exceed. The Contract Sum consists of the Construction Manager's
Fee plus the Cost of the Work, as that term is delirted in Article 6 of this Agreement.
§ A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed
Twelve ,pillion three hundred twenty thousand one hundred (S 12,320,196-00 }
n%etFF is ollars go oent�
su �e to adlttons an e ucttons y Change Order as provided in the Contract Documents.
§ A.1.1.2 Itemized Statement of the Guaranteed Maximum Price, Provided below is an itemized statement of the
Guaranteed Maximum Price organized by trade categories, allowances, contingencies, alternates, the Construction
Manager's Fee, and other items that comprise the Guaranteed Maximum Price.
(Provide beloiv or reference an attachment.)
ATTAC'HFW "An
snit. AIA Document A133T -2009 formerly A121 TMCMC - 2003). Copyright 01991, 2003 and 2009 by The American Institute of Architects. All rights
reserved. WARNING: This AIA`' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or )
distribution of this AIA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum
extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of th'ss document when completed. To report copyright violations of
AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. „4
§ A.1.1.3 The Guaranteed Maximum Price is based on the following alternates, if any, which are described in the
Contract Documents and are hereby accepted by the Owner:
(State the numbers or other identification of accepted alternates. If the Contract Documents per ntit the Owner to accept
other alternates subsequent to the execution of this Amendment, attach a schedule of such other alternates showing the
amountfor each and the date when the amount expires.)
ADDITIONAL PARKING BAYS
LIGHTING PARKING BAYS
$14,000_00
$17,909_00
§ A.1,1.4 Allowances included in the Guaranteed Maximum Price, if any:
(Identify allowance and state exclusions, if any, from the allowance price)
Item Price
COiT 11KE trY $500,000-00
AlpVr�i3li E $ 10,000.00
SOIL Affl2UH2US $ 25,000.00
ASBESTOS ARWENE TT $ 2,500_00
IMPACT FEES $ 72,701.06
TREE REf,OCATION $ 40,000.00
SMALL ENTRY STRUCTME $ 12,250_00
TREE TRUVCrNG $ 20,000.00
§ A.1.1.5 Assumptions, if any, on which the Guaranteed Maximum Price is based:
N/A
§ A.1.1.6 The Guaranteed Maximum Price is based upon the following Supplementary and other Conditions of the Contract:
Document Title
A201-2007
Date Pages
§ A.1.11 The Guaranteed Maximum Price is based upon the following Specifications:
(Either list the Specifications here, or refer to an exhibit attached to this Agreement.)
Section Title
Date Pages
AIA Document A133TM _ 2009 formerly A121 TMCMc — 2003). Copyright @ 1991, 2003 and 2009 by The American Institute of Architects. All rights
Irtlt. reserved. WARNING: This AIA Document is protected by U.$, Copyright Law and International Treaties. Unauthorized reproduction or
distribution of this Ale Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
t maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright
violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyrightgaia.org.
§ A.1.1.8 The Guaranteed Maximum Price is based upon the following Drawings:
(Either list the Drawings here, or refer to an exhibit attached to this Agreement)
Number Title Date
ATTACHKMP "C"
§ A.1.1.9 The Guaranteed Maximum Price is based upon the following other documents and information:
(List any other documents or information here, or refer to an exhibit attached to this Agreement)
AMENDEM #1.
AMEND I #2
ADDF9NDW #3
AMBOUN ##4
K"ACHIMP 'TM
ARTICLE A.2
§ A.2.1 The anticipated date of Substantial Completion established by this Amendment:
ME 30, 2015
Dean Electric, Inc. dba Dean. Construction
OWNER (Signature) CONSTRbCTION MANAGER (Sign tore)
(Printed name and title) (Priiknan e�title)
CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that
changes will not be obscured.
Init.AIA DOGUrnant At 33TM — 2009 (formerly A121 TMCMc — 2003). Copyright @ 1991, 2003 and 2009 by The American Institute of Architects. All rights
reserved. WARNING: This AIA' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or 3
distribution of this AIA2 Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the
t maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright
violations of AIA Contract Documents, e-mail The American institute of Architects' legal counsel, copyright@aia.org.
Guaranteed Maximum Price
Bicentennial Park Phase 2
Erosion Control
Merritt Environmental
Tree Protection
Dean Construction
Temporary Fence
Dean Construction
Demo & Earthwork
Kart Construction
Clay Pond Liner
Kart Construction
Utilities
Tri Dal LTD
Boulevard Paving
L.H.Lacy Company, LTD
Concrete Parking Lots
L.H.Lacy Company, LTD
Site Concrete
Dean Construction
Parking Lot Striping
Dean Construction
Pond Wall /Outfall Structure
Mike Albert,lnc.
Pavers
PavePro
Restroom Concession Building
JU & Sons Construction, LLC
Maintenance Building
JU & Sons Construction, LLC
Site Masonry
Dean Construction
Playground Entry
Dean Construction
Playground Shelters
Dean Construction
Maintenance Yard Shelter
Dean Construction
Dumpster Enclosure
Dean Construction
Handrails / Ornamental Fence
Dean Construction
Chain Link Fence
Dean Construction
Cedarcrete Fence
Dean Construction
Backstop Nets
Dean Construction
Bleacher Shade Structures
Dean Construction
Dugout Roofs
Dean Construction
Aluminum Bleacher Seating
Southern Bleachers Company
Site Irrigation
AND, Inc.
Site Electrical
Nema 3 Electric, Inc.
60/90 ballfield development
Dean Construction
Miracle Field Synthetic Turf
Surface America Inc
Site Signage
Fast Signs
Traffic Signage
Fast Signs
Site Amenities
Dean Construction
Existing Shade Refurbish
Dean Construction
Drainage/Waterproof Planters
Dean Construction
Landscape / Turf
SPSD
Aeration Fountains
Dean Construction
Fine Grade/Grade Main.
Dean Construction
Boulders
Choate USA
Playground Concrete
Dean Construction
Dragons/Baby Dragons
Cemrock Landscapes Inc.
Sprayground
Vortex USA Inc.
Playground equipment
Dean Construction
Playground synthetic surfacing
Surface America Inc
$31,294.00
$17, 235.00
$13,080.00
$447,100.00
$25,350.00
$556,699.00
$395,000.00
$317,000.00
$1,006,265.00
$29,450.00
$137,000.00
$133, 650.00
$795,000.00
$849,000.00
$305,000.00
$192,000.00
$115,071.00
$89,170.00
$32,800.00
$186,433.00
$110,043.00
$116,200,00
$89,685.00
$205,544.00
$25,737.00
$31,400.00
$540,694.00
$1,173, 326.00
$172,451.00
$162, 579.00
$30,704.00
$26,641.00
$296,570.00
$65,650.00
$37,618.00
$491, 960.00
$21,100.00
$105,000.00
$19,045.00
$214,311.00
$362,325.00
$107,860.00
$375,052.00
$30,299.00
Crushed Stone Paving
Turf Maintenance
Additional Parking Bays
Lighting additional Parking
Total of Bids Submited
Contingency
Appliance Alowance
Soil Amendments
Asbestos Abatement
Impact Fees
Tree Relocation Allowance
Small Entry Structure
Tree trimming allowance
Electrical Credit At Entrys
Subtotal
General Conditions
Insurance & Bonds
Staff
Inspection & Testing
Rentals
Fee
Guaranteed Maximum Price
Dean Construction
SPSD
L.H.Lacy Company, LTD
Nema 3 Electric, Inc.
$3,875.00
$5,275.00
$14,000.00
17 909.00
$20,526,450.00
$500,000.00
$10,000.00
$25,000.00
$2,500.00
$72,701.06
$40,000.00
$12,250.00
$20,000.00
-$15,000.00
$11,193,901.06
$152,953.63
$166,858.51
$417,146.28
$97,334.13
$41, 714.62
$250,287.77
$12,320,196.00
r
,il'1-rac-nr�rxYP ••g-•
El
I
I
SECTION 00 0030
PROJECT MANUAL TABLE OF CONTENTS
DIVISION 0 - INTRODUCTORY INFORMATION
000010 - Title Page
00 0020 - Certification Page
000030 - Table of Contents
BIDDING ADMINISTRATION
000300 -
Advertisement for Bids
001000 -
Instructions to Bidders
002000 -
Geotechnical Data
003000 -
Bid Form
004100 -
Equal Opportunity Clause
004150 -
Contractor Qualifications
004700 -
Performance Bond
004800 -
Payment Bond
00 4900 -
Maintenance Bond
005000 -
Certificate of Insurance
CONDITIONS OF THE CONTRACT
006500 - Blanket Subcontractor Agreement
007000 - General Conditions of the Contract for Construction (AIA Doc. A201-2007)
008000 - Amendments to the General Conditions of the Contract for Construction
008210 - Storm Water Pollution Prevention Plan
00 8220 - Temporary Erosion, Sediment and Water Pollution Control
008230 - Labor Classification and Minimum Wage Scale
00 8250 - State and Local Sales and Use Taxes
009000 - Addenda
DIVISION 01 - GENERAL CONDITIONS
01 1000 -
01 2100 -
01 2200 -
01 2300 -
01 2500 -
01 2600 -
01 2900 -
01 3100 -
01 3233 -
01 3300 -
01 4100 -
01 4200 -
01 5100 -
01 5800 -
01 6000 -
01 6300 -
01 7300 -
01 7329 -
01 7400 -
01 7700 -
5105
Summary of the Work
Allowances
Unit Prices
Alternates
Substitution Procedures
Contract Modification Procedures
Payment Procedures
Project Meetings, Management and Coordination
Photographic Documentation
Submittal Procedures
Testing Laboratory Services
References
Temporary Utilities and Facilities
Project Signs
Product Requirements
Substitutions and Product Options
Execution
Cutting and Patching T
Cleaning Up
Closeout Procedures
PROJECT MANUAL TABLE OF CONTENTS
00 0030 -1
xeiea� •,.�r. n
DIVISION 02 - EXISTING CONDITIONS
024116 - Structure Demolition
02 4119 - Selective Structure Demolition
DIVISION 03 - CONCRETE
033000 -
Cast -in -Place Concrete
033713 -
Shotcrete
03 4500 -
Precast Architectural Concrete
DIVISION 04 - MASONRY
04 2000 -
Unit Masonry
042300 -
Glass Unit Masonry
04 7200 -
Cast Stone Masonry
DIVISION 05 - METALS
051200 -
Structural Steel Framing
052100 -
Steel Joist Framing
05 3100 -
Steel Decking
05 4000 -
Cold -Formed Metal Framing
055000 -
Metal Fabrications
05 5050 -
Miscellaneous Metals
055113 -
Metal Pan Stairs
055210 -
Handrails and Guardrails
05 5213 -
Pipe and Tube Railings
05 7300 -
Decorative Metal Railings
DIVISION 06 - WOOD, PLASTICS AND COMPOSITES
06 1000 -
Rough Carpentry
061600 -
Sheathing
064116 -
Plastic -Laminate -Faced Architectural Cabinets
1l�ll~�C�7i[iyd �.1�:7�►i)r 1�=1i;1�71►►�[�7L��1 t�17�77�5����C�7�,
071326 - Self -Adhering Sheet Waterproofing
071800 - Traffic Coatings
071900 - Water Repellents
072100 - Thermal Insulation
072500 - Weather Barriers
074113 - Metal Roof Panels
075213 - Atactic-Polypropylene (APP) Modified Bituminous Membrane Roofing
07 6200 - Sheet Metal Flashing and Trim
077100 - Roof Specialties
077200 - Roof Accessories
078446 - Fire -Resistive Joint Systems
079200 - Joint Sealants
DIVISION 08 - OPENINGS
08 1113 - Hollow Metal Doors and Frames
5105 PROJECT MANUAL TABLE OF CONTENTS
00 0030 - 2
08 1216 -
Lll a rl..-i-a S1 L
Aluminum Frames
081433 -
Stile and Rail Wood Doors
083313 -
Coiling Counter Doors
08 3323 -
Overhead Coiling Doors
08 3613 -
Sectional Doors
084113 -
Aluminum -Framed Entrances and Storefronts
08 5113 -
Aluminum Windows
087100 -
Door Hardware
089119 -
Fixed Louvers
089516 -
Wall Vents
DIVISION 09 - FINISHES
092216 -
Non -Structural Metal Framing
09 2400 -
Cement Plastering
09 2900 -
Gypsum Board
091000 -
Tiling
_
09 5113 -
Acoustical Panel Ceiling
09 6513 -
Resilient Base and Accessories
096723 -
Resinous Flooring
099113 -
Exterior Painting
099123 -
Interior Painting
099600 -
High Performance Coatings
DIVISION 10
- SPECIALTIES
10 1100 -
Visual Display Surfaces
10 1416 -
Plaques
101423 -
Panel Signage
102113 -
Toilet Compartments
1028011 -
Toilet, Bath and Laundry Accessories
104416 -
Fire Extinguishers
105113 -
Metal Lockers
10 7500 -
Flagpoles
DIVISION 11 — EQUIPMENT
11 5213 -
Projection Screens
11 6200 -
Instrumental Equipment
11 6800 -
Play Elements
DIVISION 12 - FURNISHINGS
12 2113 -
Horizontal Louver Blinds
DIVISION 22 - PLUMBING
22 0500 -
General Requirements, Plumbing
220510 -
Project Closeout
220520 -
Common Work Results, Plumbing
220521 -
Piping Systems
220523 -
Valves
220529 -
Foundations, Hangers, and Supports
220553 -
Plumbing Identification
220700 -
Plumbing Insulation
5105
PROJECT MANUAL TABLE OF CONTENTS
00 0030 - 3
221000 - Plumbing
22 1513 - Compressed Air Piping, General Service
22 1519 - Air Compressors and Receivers, General Service
224200 - Plumbing Fixtures
225201 - Water Spray Play Equipment
DIVISION 23 - HVAC
23 0500 -
General Requirements, HVAC
230510 -
Project Closeout
23 0520 -
Common Work Results, HVAC
230529 -
Foundations, Hangers, and Supports
230548 -
Vibration Control
23 0553 -
HVAC Identification
230593 -
Test -Adjust -Balance
230700 -
HVAC Insulation
233100 -
Air Supply and Distribution
23 3400 -
Fans
233700 -
Grills, Registers, and Diffusers
235523 -
Miscellaneous Heaters
235533 -
Unit Heaters
23 8110 -
Packaged Roof Top (RTU) Heating and Cooling Units
DIVISION 26 - ELECTRICAL
260500 -
Common Work Results for Electrical
260519 -
Low -Voltage Electrical Power Conductors and Cables
260526 -
Grounding and Bonding for Electrical Systems
260529 -
Hangers and Supports for Electrical Systems
260533 -
Raceway and Boxes for Electrical Systems
260553 -
Identification for Electrical Systems
260573 -
Overcurrent Protective Device Coordination Study
26 0923 -
Lighting Control Devices
262200 -
Low -Voltage Transformers
262416 -
Panelboards
262726 -
Wiring Devices
262813 -
Fuses
262816 -
Enclosed Switches and Circuit Breakers
264113 -
Lightning Protection for Structures
265100 -
Interior Lighting
265600 -
Exterior Lighting
265668 -
Exterior Athletic Lighting
DIVISION 27 — COMMUNICATIONS
27 1100 - Communications Equipment Room Fittings
DIVISION 28 — ELECTRONIC SAFETY AND SECURITY
283111 - Digital, Addressable Fire -Alarm System
DIVISION 31 - EARTHWORK
31 1000 - Site Preparation
31 1500 - Tree Protection and Trimming
5105 PROJECT MANUAL TABLE OF CONTENTS
00 0030 - 4
N
31 2000 -
31 2100 -
31 2200 -
31 2250 -
31 2300 -
31 2320 -
31 2500 -
31 2730 -
31 2740 -
31 2750 -
31 2770 -
31 6320 -
Earthwork
Fine Grading
Lime Treated Subgrade
Cement Treated Subgrade
Trench Safety Systems
Dewatering
Excavation, Backfilfing and Compacting for Utilities
Temporary Straw Bale Dike
Silt Fence
Stabilized Construction Entrance
Inlet Protection
Drilled Concrete Piers and Shafts
DIVISION 32 - EXTERIOR IMPROVEMENTS
321310 -
Concrete Formwork
321320 -
Concrete Reinforcement
32 1330 -
Site Concrete Paving
321340 -
Concrete Paving for Sidewalks
321345 -
Multi -Purpose and Nature Trails
321350 -
Imprinted and Colored Concrete Paving
321360 -
Chemical Staining of Concrete Surfaces
321365 -
Sandblasted Finish for Concrete
321370 -
Caulking and Sealants
321380 -
Pavement Markings and Signs
32 1400 -
Decomposed Granite
321410 -
Brick Pavers
321600 -
infield Surfacing
32 1650 -
Cinder Warning Track
321816 -
Playground Protective Surfacing
322000 -
Miscellaneous Outdoor Equipment
322100 -
Bleacher Seating
32 3110 -
Galvanized Chain Link Fencing
323115 -
Vinyl Coated Chain Link Fencing
323120 -
Powdercoated Chain Link Fencing
328400 -
Landscape Irrigation System
329200 -
Turfgrass Planting
329250 -
Native Grass Planting
329300 -
Shrubs, Ornamental Grasses and Ground Cover Planting
329400 -
Tree Planting
329600 -
Transplanting
DIVISION 33 - UTILITIES
33 1200 -
Water Supply System
331210 -
Water Meter Installations
331219 -
Fire Hydrant Installation
333100 -
Sanitary Sewer
334100 -
Underground Storm Sewer and Appurtenances
334110 -
Polyvinyl Chloride Pipe Storm Drains
334216 -
Concrete Box Culverts
334600 -
Subdrainage
334710 -
Pond and Reservoir Liners
33 4800 -
Storm Sewer Repair
5105 PROJECT MANUAL TABLE OF CONTENTS
00 0030 - 5
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 4330 - Rock Rip -Rap
5105 PROJECT MANUAL TABLE OF CONTENTS
00 0030 - 6
A`P1'li(� "C"
BICENTENNIAL PARK PHASE If
INDEX OF DRAWINGS
COVER
INDEX
SHEET INDEX
MP1.00
BICENTENNIAL PARK CONCEPTUAL MASTER PLAN
LANDSCAPE
L1.00
EXISTING CONDITIONS AND REMOVAL -- OVERALL
L1.01
EXISTING CONDITIONS AND REMOVAL - AREA W
L1.02
EXISTING CONDITIONS AND REMOVAL - AREA'B'
L1.03
EXISTING CONDITIONS AND REMOVAL - AREA'C'
L1.04
EXISTING CONDITIONS AND REMOVAL-AREA'D'
L1.05
EXISTING CONDITIONS AND REMOVAL-AREA'E'
L1.06
EXISTING CONDITIONS AND REMOVAL -AREA'F'
L1.07
EXISTING CONDITIONS AND REMOVAL -- AREA'G'
L1.08
EXISTING DONDITIONS AND REMOVAL-AREA'H'
L1.09
EXISTING CONDITIONS AND REMOVAL - AREA'I'
L2.00
CONSTRUCTION LAYOUT - OVERALL
L2.01
CONSTRUCTION LAYOUT - AREA'A'
L2.02
CONSTRUCTION LAYOUT - AREA 'B'
L2.03
CONSTRUCTION LAYOUT -AREA'C'
L2.04
CONSTRUCTION LAYOUT -AREA'D'
L2.05
CONSTRUCTION LAYOUT -AREA'E'
L2.06
CONSTRUCTION LAYOUT -AREA'F'
L2.07
CONSTRUCTION LAYOUT -- AREA 'G'
L2.08
CONSTRUCTION LAYOUT -AREA'H'
L2.09
CONSTRUCTION LAYOUT --AREA'I'
L2.10
DETAIL REFERENCE PLAN - PLAYGROUND
L2.11
CONSTRUCTION LAYOUT -- PLAYGROUND
L3.00
GRADING PLAN - OVERALL
L3.01
GRADING PLAN -AREA 'A'
L3.02
GRADING PLAN - AREA'B'
L3.03
GRADING PLAN--AREA'C'
L3.04
GRADING PLAN -AREA'D'
L3.05
GRADING PLAN--AREA'E'
L3.06
GRADING PLAN - AREA'F'
L3.07
GRADING PLAN-AREA'G'
L3.08
GRADING PLAN - AREA'H'
L3.09
GRADING PLAN - AREA'I'
L3.10
GRADING PLAN - PLAYGROUND
INDEX CONTINUED
L4.00
PAVING & JOINTING PLAN - OVERALL
L4.01
PAVING & JOINTING PLAN - AREA 'A'
L4.02
PAVING & JOINTING PLAN-AREA'B'
L4.03
PAVING & JOINTING PLAN - AREA'C'
L4.04
PAVING & JOINTING PLAN-AREA'D'
L4.05
PAVING & JOINTING PLAN-AREA'E'
L4.06
PAVING & JOINTING PLAN-AREA'F'
L4.07
PAVING & JOINTING PLAN-AREA'G'
L4.08
PAVING & JOINTING PLAN-AREA'H'
L4.09
PAVING & JOINTING PLAN-AREA'I'
L4.10
PAVING & JOINTING PLAN - PLAYGROUND
L5.00
LANDSCAPE PLAN - OVERALL
L5.01
LANDSCAPE PLAN - AREA `A'
L5.02
LANDSCAPE PLAN - AREA'B'
L5.03
LANDSCAPE PLAN-AREA'C'
L5.04
LANDSCAPE PLAN-AREA'D'
L5.05
LANDSCAPE PLAN - AREA'E'
L5.06
LANDSCAPE PLAN-AREA'F'
L5.07
LANDSCAPE PLAN - AREA 'G'
L5.08
LANDSCAPE PLAN - AREA'H'
L5.09
LANDSCAPE PLAN - AREA'I'
L5.10
LANDSCAPE PLAN - PLAYGROUND
L5.11
PLANTING DETAILS
L5.12
PLANTING DETAILS -- CITY STANDARD TREE PLANTING
L5.13
PLANTING DETAILS -- TREE PROTECTION
L6.00
SITE DETAILS
L6.01
SITE DETAILS
L6.02
SITE DETAILS
L6.03
SITE DETAILS
L6.04
SITE DETAILS
L6.05
SITE DETAILS
L6.06
SITE DETAILS
L6.07
SITE DETAILS
L6.08
SITE DETAILS
L6.09
SITE DETAILS
L6.10
SITE DETAILS
INDEX CONTINUED
L6.11
SITE DETAILS
L6.12
SITE DETAILS
L6.13
SITE DETAILS
L6.14
SITE DETAILS
L6.15
SITE DETAILS
L6.16
SITE DETAILS
L6.17
SITE DETAILS
L6.18
SITE DETAILS
L6.19
SITE DETAILS
L6.20
SITE DETAILS - PLAYGROUND
L6.21
SITE DETAILS - PLAYGROUND
L6.22
SITE DETAILS - PLAYGROUND
L6.23
SITE DETAILS - PLAYGROUND
L6.24
SITE DETAILS - PLAYGROUND
L6.25
SITE DETAILS - PLAYGROUND
L6.26
SITE DETAILS
L7.00
WATER PLAY MANUFACTURER DETAILS - PLAYGROUND
L7.01
WATER PLAY MANUFACTURER DETAILS - PLAYGROUND
L7.02
WATER PLAY MANUFACTURER DETAILS - PLAYGROUND
L7.03
PAVILION MANUFACTURER DETAILS -- PLAYGROUND
L7.04
PAVILION MANUFACTURER DETAILS - MAINTENANCE YARD
L7.05
PAVILION MANUFACTURER DETAILS - POND GAZEBO
IRRIGATION
IR1.00
IRRIGATION DEMOLITION PLAN
IR2.00
IRRIGATION PLAN - OVERALL
IR2.01
IRRIGATION PLAN - AREA'A'
IR2.02
IRRIGATION PLAN-AREA'B'
IR2.03
IRRIGATION PLAN - AREA'C'
IR2.04
IRRIGATION PLAN-AREA'D'
IR2.05
IRRIGATION PLAN - AREA 'E'
IR2.06
IRRIGATION PLAN-AREA'F'
IR2.07
IRRIGATION PLAN-AREA'G'
IR2.08
IRRIGATION PLAN - AREA'II'
IR2.09
IRRIGATION PLAN-AREA'I'
IR2.10
IRRIGATION MAIN LINE PLAN
IR3.00
IRRIGATION DETAILS
INDEX CONTINUED
IR3.01
IRRIGATION DETAILS
CIVIL
C1,00
WATER & SEWER LAYOUT
C1.01
WATER DETAILS
C2.00
SANITARY SEWER PLAN PROFILE
C2.01
SEWER DETAILS
C3.00
DRAINAGE AREA MAP AND CALCULATIONS
C3.00a
RETENTION POND CALCULATIONS
C3.00h
RETENTION POND CALCULATIONS
C3.01
STORM DRAIN LAYOUT
C3.02
STORM DRAIN LAYOUT -- PLAYGROUND
C3.03
STORM DRAIN PLAN -PROFILE - MAIN 'A' (STA. 00 TO 09+00)
C3.04
STORM DRAIN PLAN -PROFILE - MAIN 'A' (STA. 09+00 TO END)
C3.05
STORM DRAIN PLAN -PROFILE - LATERALS 'A-2' & `A-3'
C3.06
STORM DRAIN PLAN -PROFILE- MAIN'B' & LATERAL'A-4'
C3.07
STORM DRAIN DETAILS
C3.08
STORM DRAIN DETAILS
C3.09
RETENTION POND DETAILS
C3.10
UTILITY EMBEDMENT DETAILS
C3.11
PLANTER AND WALL DRAIN LAYOUT
C3.12
WHITE CHAPEL INLET RELOC. & FIELD 6 S.D. REPAIR
C4.01
ROADWAY PAVING PLAN -PROFILE STA, 0+00 TO 5+00
C4.02
ROADWAY PAVING PLAN -PROFILE STA. 5+00 TO 10+00
C4.03
ROADWAY PAVING PLAN -PROFILE STA. 10+00 TO 15+00
C4.04
ROADWAY PAVING PLAN -PROFILE STA, 15+00 TO END
STRUCTURAL
S1.00
GENERAL STRUCTURAL NOTES
S1.01
FOUNDATION PLAN -- CONCESSION BUILDING
S1.02
STRUCTURAL WALL PLAN - CONCESSION BUILDING
S1.03
ROOF FRAMING PLAN - CONCESSION BUILDING
S1.04
STRUCTURAL BUILDING SECTIONS & DETAILS - CONCESSION
S1.05
BUILDING & WALL SECTIONS - CONCESSION BUILDING
S1.06
SECTIONS - CONCESSION BUILDING
S1.07
PRECAST WALL PANELS - CONCESSION BUILDING
S2.00
GENERAL STRUCTURAL NOTES
S2.01
FOUNDATION PLAN - MAINTENANCE BUILDING
INDEX CONTINUED
S2.02
DETAILS - MAINTENANCE BUILDING
S2.03
ROOF FRAMING PLAN - MAINTENANCE BUILDING
S2.04
STEEL JOIST ELEVATIONS - MAINTENANCE BUILDING
S2.05
SECTIONS - MAINTENANCE BUILDING
S2.06
JOIST SECTIONS - MAINTENANCE BUILDING
S2.07
DETAILS - MAINTENANCE BUILDING
S3.01
STRUCTURAL PLAN & SECTIONS - ENTRY TOWER
S4.01
STRUCTURAL PLAN & SECTIONS - ENTRY GATEWAYS
S4.02
SECTIONS & DETAILS - ENTRY GATEWAYS
S5.01
STRUCTURAL PLAN & SECTIONS -PLAYGROUND
S5.02
ROOF FRAMING PLAN - PLAYGROUND
S5.03
SECTIONS & DETAILS -- PLAYGROUND
S5.04
SECTIONS & DETAILS - PLAYGROUND
S6.00
BLEACHER FRAMING & DETAILS - "60/90" FIELD
S6.01
BLEACHER FRAMING & DETAILS - MIRACLE LEAGUE FIELD
ARCHITECTURE
A0.00
PROJECT INFORMATION
A1.00
SCHEDULES - CONCESSION BUILDING
A1.01
FLOOR PLAN - CONCESSION BUILDING
A1.03
REFLECTED CEILING PLAN -- CONCESSION BUILDING
A1.04
TOILET LAYOUTS & ACCESSORIES
A1.20
ELEVATIONS - CONCESSION BUILDING
A1.21
ENLARGED ELEVATIONS - CONCESSION BUILDING
A1.22
ENLARGED SECTION - CONCESSION BUILDING
A1.30
SECTIONS - CONCESSION BUILDING
A1.40
EXTERIOR WALL SECTIONS -- CONCESSION BUILDING
A1.41
INTERIOR WALL DETAILS - CONCESSION BUILDING
A1.42
DOOR DETAILS - CONCESSION BUILDING
A1.43
DOOR DETAIL - CONCESSION BUILDING
A1.44
WINDOW DETAILS - CONCESSION BUILDING
A1.45
DETAILS -CONCESSION BUILDING
A1.46
DETAILS - CONCESSION BUILDING
A1.47
DETAILS - CONCESSION BUILDING
A1.48
ROOF DETAILS - CONCESSION BUILDING
A1.50
INTERIOR ELEVATIONS
A1.95
PERSPECTIVES - CONCESSION BUILDING
.
ill M L=rn1 %-
INDEX CONTINUED
A2.00
SCHEDULES - MAINTENANCE BUILDING
A2.01
FLOOR PLAN - MAINTENANCE BUILDING
A2.02
ROOF PLAN - MAINTENANCE BUILDING
A2.03
REFLECTED CEILING PLAN - MAINTENANCE BUILDING
A2.04
PARTITION TYPES
A2,20
ELEVATIONS - MAINTENANCE BUILDING
A2.21
ELEVATIONS - MAINTENANCE BUILDING
A2.30
SECTIONS - MAINTENANCE BUILDING
A2.31
SECTIONS - MAINTENANCE BUILDING
A2.32
WALL SECTIONS - MAINTENANCE BUILDING
A2.33
WALL SECTIONS & DETAILS -- MAINTENANCE BUILDING
A2.34
STAIR DETAILS - MAINTENANCE BUILDING
A2.40
DOOR & WINDOW DETAILS - MAINTENANCE BUILDING
A2.41
DOOR & WINDOW DETAILS - MAINTENANCE BUILDING
A2.42
ROOF DETAILS - MAINTENANCE BUILDING
A2.50
ELEVATIONS & DETAILS - MAINTENANCE BUILDING
A2.95
PERSPECTIVES - MAINTENANCE BUILDING
A3.01
PLAN, ELEVATIONS & SECTIONS - ENTRY TOWER
A3.02
DETAILS - ENTRY TOWER
A3.95
PERSPECTIVES - ENTRY TOWER
A4.01
PLAN VIEW -- ENTRY GATEWAYS
A4.02
ELEVATIONS - ENTRY GATEWAYS
A4.03
DETAILS -- ENTRY GATEWAYS
A4.95
PERSPECTIVES - ENTRY GATEWAYS
A5.01
PLAYGROUND ENTRANCE FLOOR PLAN
A5.02
PLAYGROUND ELEVATIONS
A5.03
PLAYGROUND ENTRANCE COLUMN SECTIONS
A5.04
PLAYGROUND ENTRANCE SECTIONS
A5.95
PERSPECTIVES -- PLAYGROUND ENTRANCE
MECHANICAL, ELECTRICAL & PLUMBING
M1.01
CONCESSION BUILDING FLOOR PLAN - MECHANICAL
M2.01
MAINTENANCE BUILDING FLOOR PLAN - MECHANICAL
M3.01
MECHANICAL DETAILS & SCHEDULES
E1.01
SITE PLAN - ELECTRICAL DEMOLITION
E1.02
SITE PLAN -- ELECTRICAL
E1.03
SITE PLAN - ELECTRICAL EAST ENTRANCE
INDEX CONTINUED
E2.01
SITE PLAN - SPORTS LIGHTING ELECTRICAL
E3.01
CONCESSION BUILDING FLOOR PLAN - LIGHTING
E3.02
CONCESSION BUILDING FLOOR PLAN - ELECTRICAL POWER
E3.03
MAINTENANCE BUILDING FLOOR PLAN - LIGHTING
E3.04
MAINTENANCE BUILDING FLOOR PLAN - ELECTRICAL POWER
E3.05
IRRIGATION PUMP HOUSE FLOOR PLAN - LIGHTING & POWER
E4.01
ELECTRICAL DETAILS
E4.02
ELECTRICAL DETAILS
E4.03
ELECTRICAL DETAILS
E5.01
ELECTRICAL SCHEDULES
P1.01
CONCESSION BUILDING FLOOR PLAN - SEWER
P1.02
CONCESSION BUILDING FLOOR PLAN -WATER
P2.01
MAINTENANCE BUILDING FLOOR PLAN -- SEWER
P2.02
MAINTENANCE BUILDING FLOOR PLAN - WATER
P3.01
PLUMBING DETAILS
' I CERTIFICATE OF LIABILITY INSURANCE I 111`;M%n" I I
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER
Southwest Assurance Group, Inc.
12201 Merit Drive, Ste 795
Dallas TX 75251
:CONTANAME: Sherrel Breazeale
NAME
N
PHONE 214_693-5721 S-SO$ F N0:214-691-4963
A6DRESS: sowston@southWest:aSsurance. com
INSURER(S) AFFORDING COVERAGE
NAIC #
INSURER A.Em to erS Mutual Casualty Co
121415
INSURED
Dean Electric, Inc.
dba Dean Construction
701 Hall Street
Cedar Hill TX 75104
INSURERB:Great American Insurance Co.
16691
INSURERc:Texas Mutual Insurance Co.
122945
INSURI_RD:Continental Casualty Insurance 120443
INSURERS:
INSURERF:
(:LJVI iHAtiI±S f'F-W I IF Ir:4-rF Al l IMRFW-'LU 1:31ZU14 DCl/rQI/lA11111111ADGD.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
ILTR
TYPE OF INSURANCE
ADDRL
yyyp
POLICY NUMBER
MMlDDY1YYYY
MMIUUOYlYYYY
LIMITS
GENERAL LIABILITY
4D17101-14
3/31/2013
/31/2014
EACH OCCURRENCE
$1,000,000
�:
X COMMERCIAL GENERAL LIABILITY
CLAIMS -MADE OCCUR
DAMAGE PREMISES O a N rcence
$ 300, 000
MED EXP (Any one person)
$ 10,0 00
PERSONAL& ADV INJURY
$ 1,000,000
GENERALAGGREGATE
$ 2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS -COMPIOPAGG
$ 2,000,000
POLICY rX PRO LOC
$
AUTOMOBILE
LIABILITY
4E17101-14
/31/2013
/31/2014
COMBINED SINGLE LIMIT
Ea accident
1 000 000
X
BODILY INJURY (Per person)
$
A
ANY AUTO
AOSCHEDULED
AUTOS AUTOS
BODILY INJURY ( Par accident)
$
HIRED AUTOS X NO SWNED
$1,000 Collision Dad.
X
PROPERTY DAMAGE
Perac ident
$
X
HCPD
1,000 Comprehensive Ded.
PIP -Basic
$ $ 000
UMBRELLA LIAR X-
OCCUR
SBU596585607 -
3/31/2013
3/31/2014
EACH OCCURRENCE
$ 3,000,000
AGGREGATE
$ 3,000,000
B
EXCESS LIAB
CLAIMS -MADE
DIED I X I RETENTIONS 10,00
$
C
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY YIN
ANY PROPRE TORIPARTNERIEXECUTIVE J
OFFICERlMEMBEREXCLUDfD7
NIA
rSF0001178134
3/31/2013
3/31/2014
WCSTATU- OTH-
X I tT
E.L. EACH ACCIDENT
$ 11000,000
E.L. DISEASE - EA EMPLOYE
$ 11000,000
(Mandatory In NH)
If yes, desctibe under
E.LDISEASE- POLICY LIMIT 1
$ 1,000,000
DESC RIPnON OF OPERATIONS below
D
Builders' Risk
084274505
3/31/2013
3/31/2014
BR - Each Occurrence $7,000,000
Rented/Leased Equip
R&LEquip - Each Occurrence $200r 000
bESCRIPTI0 OF OPERATIONS 1 LOCATIONS I VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space Is required)
Re: Bicentennial Park - Phase II
SEE ATTACPMD .
a, u. 1 n ILn f � 11vwr_n IrRIYI�CLLA r wry
City of Southlake
1400 Main Street
Suite 450
Southlake, TX 76092
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
Ri.ckenbacher/SHEREL�_-__ _
Auur%u Y, (.&U-IUIUb) C7 1988-2010 ACORD CORPORATION. All rights reserved.
INS025I7r11n om n1 ThA arnpn nnma and Inr1n nra ronlG}prarl mark¢ of ArnRn
COMMENTS/REMARKS
NAMED INSURED: Dean Electric, Inc. dba Dean Construction
POLICY TERM: March 30, 2013 to March 30, 2014
ADDITIONAL INSURED -
The policies include a blanket automatic additional insured endorsement that provides
additional insured status only when there is a written contract that requires such status.
The additional insured status is provided to those parties listed in the contract
requiring such. Listed are the forms that are attached to the named insured's policies.
Additional Insured coverage is provided per the terms and conditions of these forms.
•General Liability - #CG7482.3 1-08
•Auto Liability -- #CA7270 3-07
•Umbrella Liability - #GAI 6079 10 98
WAIVER OF SUBROGATION -
The policies include a blanket automatic waiver of subrogation endorsement that affords a
waiver of subrogation only when there is a written contract that requires such status. A
waiver of subrogation is afforded to those parties listed in the contract requiring such.
Listed are the forms that are attached to the named insured's policies. Waiver of
subrogation coverage is provided per the terms and conditions of these forms.
•Workers' Compensation - #WC 42 03 04 A
•General Liability - #CG7555 11-04
•Auto Liability -- #CA7218 8-99
•Umbrella Liability - Follow Form
OTHER COVERAGES must be required by a written contract -
•PRIMARY/NONCONTRIBUTORY COVERAGE for ongoing and completed operations per the terms and
conditions of #CG7482.3 1-08.
•PER PROJECT GENERAL AGGREGATE LIMIT is provided per the terms and conditions of Form
4CG7429 11-98.
•X,C & U (EXPLOSION, COLLAPSE & UNDERGROUND) is not excluded from the General Liability
policy and is per the terms and conditions of General Liability Coverage Form #CG 00 01 12
07.
•CONTRACTUAL LIABILITY coverage is standard and may not cover all liabilities assumed by
the named insured under its contract with you and is per the terms and conditions of
General Liability Coverage Form #CG 00 01 12 07.
When contract documents are provided for review, only the insurance requirements contained
in the contract are reviewed. The scope of our review is to determine if the current
insurance program in place for the named insured addresses the types and amounts of
insurance coverage referenced by the contract. We identified the significant insurance
obligations. Our agency is not providing legal advice or a legal opinion concerning any
portion of the contract. In addition, our agency is not undertaking to identify all
potential liabilities that may arise under this contract. The review is provided for the
information of the named insured and should not be relied upon by third parties. Any
descriptions of insurance coverages are subject to the terms, conditions, exclusions and
other provisions of the policy and any applicable regulations, rating rules or plans.
OFREMARK COPYRIGHT 2000, ANTS SERVICES INC.
ADDENDUM NO. ONE
ADDENDUM NUMBER ONE
BICENTENNIAL PARK-- PHASE Ii
CITY OF SOUTHLAKE, TEXAS
ISSUED BY: Schrickel, Rollins and Associates, Inc.
1. This addendum modifies and extends the
requirements of the plans and/or the project
manual for the above referenced project, dated
August 9, 2013.
2. Staple these addenda to the inside of the rear
cover of the project manual or bind it into the
project manual at the end of the Bid Form.
3. Note receipt of all addenda on the Bid Form.
PROJECT MANUAL
ISSUE DATE: August 30, 2013
BID DATE: September 18, 2013
SECTION 00 3000 — BID FORM
1. Delete this Section in its entirety and replace with Section 00 3000 — BID FORM, attached
hereto.
SECTION 04 2000 — UNIT MASONRY
1. Delete this Section in its entirety and replace with Section 04 2000 — UNIT MASONRY,
attached hereto.
SECTION 32 1380 — PAVEMENT MARKING AND SIGNS
1. Part 2 — PRODUCTS: Item "2.01 MATERIAL, B. SIGNS, 4."
a. Revise Item "4." to state "Pedestrian Crossing Sign "C" — MUTCD W11-2 (301100")
pedestrian crossing sign with flashing LEDs, wireless push button activation, MUTCD
W16-7P supplemental plaque and solar control system (wireless with solar panel, poly
cabinet, no modem). Signs shall be mounted at standard MUTCD mounting heights."
PLANS
SHEET L6.17 —SITE DETAILS
1. Detail No. 7 — Revise callout note, "GATE OPENER ELITE CSW-200-UL-1 HP OR
APPROVED EQUAL (BOTH SIDES WITH DECTOR LOOP AND POWER BACKUP." to
state "SWING GATE OPENERS TO BE ELITE CSW20OUL1 HP, AS MANUFACTURED BY
ELITE GATES, (310) 456-9204, OR APPROVED EQUAL, WITH DETECTOR LOOP,
POWER BACKUP, GOOSENECK POST AND LINEAR AK-11 DIGITAL KEYPAD".
SHEET L6.26 — SITE DETAILS
1. Detail No. 1 - Revise callout note, "APPROX. LOCATION OF GATE OPENER;
REF.SPECIFICATION FOR OPENER" to state "SLIDE GATE OPENER TO BE ELITE
SL3000ULTHP, AS MANUFACTURED BY ELITE GATES, (310) 456-9204, OR APPROVED
ADDENDUM NO. ONE
5105 1
ADDENDUM NO. TWO
ADDENDUM NUMBER TWO
BICENTENNIAL PARK — PHASE II
CITY OF SOUTHLAKE, TEXAS
ISSUED BY: Schrickel, Rollins and Associates, Inc.
1. This addendum modifies and extends the
requirements of the plans and/or the project
manual for the above referenced project, dated
August 9, 2013.
2. Stable these addenda to the inside of the rear
cover of the project manual or bind it into the
project manual at the end of the Bid Form.
3. Note receipt of all addenda on the Bid Form.
PROJECT MANUAL
ISSUE DATE: September 9, 2013
BID DATE: September 18, 2013
SECTION 00 3000 — BID FORM
1, Delete this Section in its entirety and replace with Section 00 3000— BID FORM, attached
hereto.
SECTION 01 2300 —ALTERNATES
1. Part 3 — EXECUTION: Section 3.01 SCHEDULE OF ALTERNATES
a. Revise Item H. to state "Add Alternate No. 8—Additional parking lot lighting, as noted
within the Construction Documents (Sheet E1.01, note #3).
b. Add Item I. — "Also reference Section 00 3000 — BID FORM."
SECTION 11 6800 — PLAY ELEMENTS
1. Part 2 —PRODUCTS: Section 2.1 PLAYGROUND EQUIPMENT AND STRUCTURES
a. Revise Item C. MUSICAL PLAY INSTRUMENTS, sub -item b. CONTACT: to state
"Spencer Lane, 1555 Tahoe Court, Redding, CA 96003, (877) 473-7619,
Spencer@nspx3.com or Greg Hawkins, 11660 Plano Road, Dallas, TX 75243, (214)
503-7320, greg@4funrcf.com."
SECTION 22 5201 — WATER SPRAY PLAY EQUIPMENT
1. Delete this Section in its entirety and replace with Section 22 5201 — WATER SPRAY PLAY
EQUIPMENT, attached hereto.
SECTION 32 1380 -- PAVEMENT MARKING AND SIGNS
a. Delete this Section in its entirety and replace with Section 32 1380 — PAVEMENT
MARKINGS AND SIGNS, attached hereto.
SECTION 32 2000 — MISCELLANEOUS OUTDOOR EQUIPMENT
1. Part 2 — PRODUCTS: Section 2.01 EQUIPMENT
a. Revise Item G. PLAYGROUND PLOP BENCHES to state "Benches shall be Composite
Wood Plop Bench, Model 965-682PL, with modified one (1 ") inch radii at corners, by
DuMor, Inc., (800) 598-4018. Bench shall be per detail 5/L6.24, and provided in
ADDENDUM NO. TWO
5105 1
ADDENDUM NO. THREE
ADDENDUM NUMBER THREE ISSUE DATE: September 13, 2013
BICENTENNIAL PARK— PHASE II BID DATE: September 18, 2013
CITY OF SOUTHLAKE, TEXAS
ISSUED BY: Schrickel, Rollins and Associates, Inc.
1. This addendum modifies and extends the
requirements of the plans and/or the project
manual for the above referenced project, dated
August 9, 2013,
2. Staple these addenda to the inside of the rear
cover of the project manual or bind it into the
project manual at the end of the Bid Form.
3. Note receipt of all addenda on the Bid Form.
PLANS
SHEET L2.05 — CONSTRUCTION LAYOUT, AREA 'E'
1. Playground retaining wall shall be as noted on Sheet SL-01, attached hereto.
SHEET L2.07 —CONSTRUCTION LAYOUT, AREA 'G'
1. Playground retaining wall shall be as noted on Sheet SL-02, attached hereto.
SHEET L2.10 —CONSTRUCTION LAYOUT, PLAYGROUND
1. Revise callouts "SIMULATED ROCK SCRAMBLE, DET. 6/L6.25" to state "STONE
STEPPERS, DET. 2/L6.23".
SHEET L3.05 — GRADING PLAN, AREA 'E'
1. Playground retaining wall grades shall be as noted on Sheet SL-03, attached hereto.
SHEET L3.07 — GRADING FLAN, AREA 'G'
1. Playground retaining wall grades shall be as noted on Sheet SL-04, attached hereto.
SHEET L6.03 — SITE DETAILS
1. Add detail for 4' Chain Link Fence as shown on Sheet SL-05, attached hereto.
SHEET L6.06 — SITE DETAILS
1. Detail No. 8 — Delete this detail in its entirety and replace with detail on Sheet SL-06,
attached hereto.
SHEET L6.07 — SITE DETAILS
1. Detail No. 1
a. Delete callout for "16' CHAIN LINK FENCE (BATTER'S EYE)".
b. Delete two (2) callouts for "45 ' ANGLE DOWN TO 8' FENCE".
SHEET L6.08 — SITE DETAILS
1. Detail No. 1 — Revise backstop post locations as noted on Sheet SL-10, attached hereto.
ADDENDUM NO, THREE
5105 1
ADDENDUM NO. FOUR
ADDENDUM NUMBER FOUR ISSUE DATE: September 16, 2013
BICENTENNIAL PARK— PHASE li BID DATE: September 18, 2013
CITY OF SOUTHLAKE, TEXAS
ISSUED BY: Schrickel, Rollins and Associates, Inc.
1. This addendum modifies and extends the
requirements of the plans and/or the project
manual for the above referenced project, dated
August 9, 2013.
2. Stable these addenda to the inside of the rear
cover of the project manual or bind it into the
project manual at the end of the Bid Form.
3. Note receipt of all addenda on the Bid Form.
PROJECT MANUAL
SECTION 09 9610 — ANTI -GRAFFITI COATING
1. This Section, attached hereto, is entirely new and is hereby made part of the Project
Manual and Contract Documents.
GENERAL
ARCH ITECTU RE/STRUCTURAL
1. Concession Building-- Cast -in -place concrete wall panels shall be considered acceptable
in lieu of Pre -cast concrete wall panels, as detailed in the Construction Documents.
END OF ADDENDUM NO. FOUR