Loading...
Item 9B MemoCITY OF SOUTHLAKE MEMORANDUM (November 5, 2013) To: Shana K. Yelverton, City Manager From: Robert H. Price, P.E., Director of Public Works Subject: Award construction contract for pressure plane interconnection valves to Wilson Contractor Services, LLC in the amount of $627,128.70 Action Requested: Award a construction contract for the pressure plane interconnection valves to Wilson Contractor Services, LLC in the amount of $627,128.70. Background Information: Neel -Schaffer, Inc. (previously Cheatham & Associates) conducted a water model computer analysis for the City's water infrastructure network. The model identified five (5) areas within the high pressure plane which have marginal capabilities during fire flow situations. The recommended solution for the system is to install pressure plane interconnection valves which will detect the changes in pressure between the high pressure and low pressure planes and electronically adjust the water flow accordingly to supplement the availability of water during a fire fighting situation. During the Southlake 2030 Water Master Plan Development, this project was identified as a Tier 1 project. Wilson Contractor Services, LLC was the lowest bidder of the three (3) bids submitted. Following is the breakdown of the bids for the pressure plan interconnection valves: BIDDER BID AMOUNT Wilson Contractor Services, LLC $627,128.70 Fryer Construction Company $644,360.00 North Texas Contracting $666,000.00 Wilson Contractor Services, LLC will construct the vaults and install five (5) pressure plane interconnection valves at the vulnerable locations identified in the computer model as having the most significant pressure reductions during a heavy water demand event, Item 9C such as a fire event, when the water distribution system is required to provide higher flows to fire hydrants. The project consists of the construction and installation of five (5) 12-inch pressure plane compensating valves at the following locations: (1) Highland Street and Turnberry Lane (2) Southlake Boulevard and Southridge Lakes Parkway (3) Southlake Boulevard and River Oaks Drive (4) Dove Road and Shady Oaks Drive (5) Shady Drive at Durham Elementary School. The original Opinion of Probable Costs (OPCC) developed by the consulting engineer based upon discussions with city staff was developed with several assumptions that later proved to be inaccurate. This estimate was based on the inclusion of four (4) pressure plane valves. The need for a fifth valve was originally identified; however, was planned to be installed as part of the FM1938 Water Line and Sanitary Sewer Relocation Project. This valve was later removed from the Relocation Project after determining that the location identified had no room for the vault. While it was always anticipated that these valves would be automated through connection to the SCADA system, the anticipated costs of these improvements were not included in the original estimate. These combined assumptions led to an estimated cost of $230,000 for this project. The major factors that can be attributed to the increase in construction bids were the costs associated with: SCADA Programming $112,000 Addition of a PRV $111,000 Electrical connections $100,000 Valve price increases $ 62,500 Mobilization/Prep price increases $ 11,500 While the cost of this project exceeds the City Council funds that were originally budgeted, surplus funds from another completed utility project are available for construction of this project. The additional funding needed for this project is being proposed to be reallocated from the remaining account balance in the completed Pearson Emergency Generator Project. Item 9C Financial Considerations: $300,000 was approved in the FY2013 Utility Fund budget for this project; $50,000 for engineering and $250,000 for construction. The remaining $377,128.70 will be funded from the remaining account balance of the Pearson Emergency Generator Project. Strategic Link: The construction of the pressure plane interconnection valves links to the city's strategy map relative to the focus areas of Safety and Security and Infrastructure by achieving the highest standards of safety and security, improve performance of delivery & operational processes and investing to provide and maintain high quality public assets. The Critical Business Outcome that is met by the construction of these improvements is C1301: Continue to implement Southlake 2030 Plan by focusing on short-term initiatives. Citizen Input/ Board Review: N/A Legal Review: N/A Alternatives: The City Council may approve or deny this construction contract Supporting Documents: Location Map Bid Tabulation Recommendation Letter Staff Recommendation: Award a construction contract for the pressure plane interconnection valves to Wilson Contractor Services, LLC in the amount of $627,128.70. Staff Contact: Robert H. Price, P.E., Public Works Director Cheryl Taylor, P.E., City Engineer Alejandra Ayala, P.E., Civil Engineer O N co a i O r O O O O O O O O O O O O O O O O O O O 0 000 O O O O O O O O O O O O O O O O O O o 0)(n N OO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p p F OOOO OM O O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 O 0 0 0 00 000 O OIn O O O O O O In V A N (O q. Cl) Cl) (Di6% % (0 » It » I- » It(D » » It » I- » In (» I- (» It (» 6%6 % m N N �U ( O(.0 r r (.0U y w r 2X aoao� O O O O O O O O O O O O O O O O O O rn U H - t 0 W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a) LLj Y m O F U z O O O O O N O O O O O O O O O O O O O O O O O O O O O O O O V I O O O In Z CA O d O (M N (0 In V) U) O (0 O V N r O V O (O O V O r O to O r to V ER N O (A _ 6% (R (R (R (R (R (R (R (R (R tR (R (R zvLL0- < Cl) (A p O O O O O O O O O O O O O O O O o 0 0 co (fl O o 0 0 0 0 0 . 0 0 0 0 0 0 0 0 0 0 0 0 v U M r 0 F 0 m 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 m O CO (� In V M CA (fl 0 0Q In M O N 6% In N 6% In ;; O In 6% O N M O 1- N O O M O 1- N O 00 I- O 1- N O 0) M O 1- N O N M O 1— N O N ER O N ER V N M C M V N O O (�9 U (» v� U N V V fR (D CA CA (fl r to O O O O O O O O O O O O O Cc? O Cc? O O O O O O O O O O O O O O O O O O O r 0 X� 0 O (OOOOOOOO O O O O O O O O O O O O O O O O O U m FW i z OOOOOOOOOONOO O O O O O O O O 6% O In T z In In In In r O r 00 r 0) r In r O N 0 P 2 iQ� 2E LL d Q d LL Q NV (n p O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 U r r r U c 0 0 0 0 0 0 0 rn O 0 0 rn O 0 0 o r 00 0 w M 0 0 0 0 0 0 00 m 0 M M r 0 M M In 0 M 00 w 0 M M In 0 M 0 0 0 0 0 0 M N U N F (M r- O In In 00 d) r- 0) r 0) It 0) r 01 O N In 00 V 0 00 O M V N O r (O r If M r- N r M It N r CA 0 N W N 6% 6% 6% w N w N w N m N w N 6% 6% N w p O 0 (fl i 0') 0') O O O O O O O O O O O O O O O O O O c o O Q H g c 0 0 0 0 0 0 0 q O 0 0 q 0 0 0 0 0 U— W O o0 (M O O O O 00 0) 0 M M r 0 M M In 0 M 00 w 0 M M In 0 M 0 M 0 O 0 O C w m F Z U (M r-(D o0 (3 r- (3 r- (3 V 01 r- 01 6% V In O m o z R M O oa. N I I N 00 N 00 N d) N 00 N ER p 0 d LL Q J O O O O O O O O O O O O O O O O O O p m W O O O O O O O O O O O O O n O O O I O O O I O O O O O In O O O O O O p Q o OOI O o O O In(MInN O M O M O M O N M O In M O O O m OQ 0 U ( I C\l coI ,It C\l C\l I C\l 00 C\l C\l (i Cl) M d � V) ER ER ER ER ER ER ER ER ER ER ER ER ER ER ER ER ER � LL O O O O O OO O O O O O O O O O O O O O O OO O O O O O O O O O O O O O OQ_ L(nL Z n O O O O O O O OMO In O In O O n O O n w MOO O O UOOnOOO O In r O In (M In N (M N (M In co- O INn Z 0 w N M n N N It n 00 NV N a ItItItItLo NN d V3 V3 V3 V3 V3 V3 V3 V3 V3 V3 V3 V3 V3 V3 V3 V3 V3 V3 J >:n O 0 a z z cn cn Q cn cn cn cn cn cn cn cn cn cn 0 0 a O Q J -il W J J J J J J J J J J J J J H W 6 Y R E R O m cm t Z 0 > O 0 t_A = t 7 0 7 O M > a) U> U> U> U> U J m > m > m > > rn D Q > >>>> > > > m a� Q z U) c 0 E o E o E o E 0 E c y a 0 'N U >Jp > v F a c N c N c N c N c N>' (10 m > m N v U v U v U v U U 0 c U o o Q Q Q Q Q�.� a� U r z W o o �Q �Q �Q �Q �QU� 0 ���U�U�U�C) cu ci m � o C) > o Z o o W °'m a���������RUaE _ � �,� ��QOQo— CL oQOQo00 wO 0- .N (n + N LL N LL N LL N LL N LL LL W R C U- Q a g U `6 E E a a a� 0- Q ¢ w Cl) O cu_ N N O b N b N — b N +§ N b N +� +U+ N U F N R N = n a) c to c E E to c O to c O to c O to c O to c O to c to c 7 O yU) y 0 C a 2E O cn dS dS dS O dS o dS o dS o dS o dS dS c J a a U t t t U t U t U t U t U t t m w p U s u rn rn rn a� .N a) .N a) .N a� .N a� .N N a� W } co w ° o.o.o E E E E E E E E E E EE E E E N_ G/ U 7 7 7' 7' 7' 7' 7' 7 7 as Z U N 0 0 d d d LL LL LL d LL d LL d LL d LL d LL LL m W W F a W 0 N (M V In. r.. z 0 m O I.-z - •� 0 0 a m RL NEEL—SCHAFFER + g Cheatham & Associates October 18, 2013 N-S Account No. 11484 Ms. Alejandra (Alex) Ayala, P.E. Civil Engineer City of Southlake 1400 Main St., Suite 320 Southlake, TX 76092 REFERENCE: CITY OF SOUTHLAKE 2013 CIP PRESSURE PLANE INTERCONNECTION VALVES Dear Ms. Ayala: Sealed bids were received by the City of Southlake on October 15, 2013, for the referenced project. Three (3) contractors submitted bids for this project. Enclosed is a copy of the Bid Tabulation for the three (3) qualified bids submitted. The lowest bid was submitted by Wilson Contracting Services, of Denton, Texas in the amount of $627,128.70. Below are a summary of the bids of the qualified bidders on this project: Bidder Bid Wilson Contracting Services $627,128.70 Fryer Construction Co. $644,360.00 North Texas Contracting $666,000.00 We have reviewed and tabulated all bids received and found no discrepancies. We have previously worked with this contractor and have had positive experiences regarding their overall performance including their construction quality and timeliness. We appreciate the opportunity to work with you on this important project. Please call if you need additional information. Sincerely, NE�EL-SCHAFFER, INC. Derek Cheatham, P.E. Vice President ARLINGTON - DALLAS - FORT WORT H d HOUSTON engineers ® planners e surveyors e environmental scientists • emergency management 2501 ,Avenue J. Suite 120 Arlington, TX 76006 phone 817-548-0696 fax 817-265-8532 www.neel-schaffer.com