Loading...
Item 7D Zoning Change and Site Plan Southlake Park Village Item 7D Owners: RCP Southlake Boulevard No. 2, Ltd., Estate of Chauncey Antoine Prade, Jr. and Anita Prade Applicant: Woodmont Land Company Request: Zoning Change and Site Plan for Park Village with approximately 196,000 square feet of of gross building space, including approximately 183,750 leasable square feet of retail and restaurant development Location: Generally located at the southwest corner of E. Southlake Blvd. and S. Carroll Ave. ZA13-060 Aerial View Park Village Park Village Site Plan and Landscape Plan Site Data Summary Park Village Integral Color Concrete Exhibit Landscape Plan Landscape Plan Tree Conservation Plan Variances Requested Driveway Stacking Driveway Spacing Service Driveway Connection to Collector Street Parking Lot Landscape Islands Lighting Ordinance Drive E - 10’ Stacking Drive F - 10’ Stacking Driveway Variance Exhibit ± 448’ ± 468’ Drive D - 33’ Stacking Planning and Zoning Commission Motion: September 19, 2013; Approved (6-0) subject to Site Plan Review Summary No. 3 and Staff Report dated September 13, 2013 with the following stipulations; The Village area will have pavers or integral color concrete, The large fountain feature at Carroll Avenue and 1709 will be a minimum of eighty-five (85) feet across, The small fountain feature within the Village area adjacent to Building N will be a minimum of 600 square feet, Screening on the roofs for the mechanical equipment and will have a detail with respect to parapets, This will be one phase construction and the entire project must be completed within 120 days of the initial issuance of a certificate of occupancy or temporary certificate of occupancy for any building in the project, The living room area, which is the area in the Village area between Buildings N and O, will be the only area that will have overhead strung lights as depicted in the rendering, Planning and Zoning Commission Motion: 6) The applicant will address the safety features along the pedestrian access in front of the fountain feature at the corner of 1709 and Carroll Avenue and will be ready to report to Council regarding their discussion with TXDOT concerning placing hardscape into the right-of-way, 7) The decorative architectural lighting features and also amenities, such as the custom benches, and fire pits, will be substantially similar to what has been presented , 8) Noting the applicant’s willingness to incorporate Village features into the Rim area buildings, 9) Building Tower Road and Zena Rucker Blvd is part of the phasing stipulation mentioned earlier, 10) Including a requirement that improvements needed on S. Carroll Avenue adjacent to the project be completed along with the project, subject to the same stipulations, and 11) Approving variances Questions? Traffic Impact Analysis Scenario 3 Parking Summary Park Village Required Parking per Zoning Ordinance No. 480 1 space per ± 230 S.F. Site Data Summary Park Village Shops of Southlake 1 space per ± 245 Gross S.F. ZA13-060 Planning and Zoning Commission: September 19, 2013; Approved (6-0) subject to Site Plan Review Summary No. 3 and Staff Report dated September 13, 2013 with the following stipulations; 1) The Village area will have pavers or integral color concrete, 2) The large fountain feature at Carroll Avenue and 1709 will be a minimum of eighty-five (85) feet across, 3) The small fountain feature within the Village area adjacent to Building N will be a minimum of 600 square feet, 4) The applicant prior to going to City Council will address the screening on the roofs for the mechanical equipment and will have a detail with respect to parapets, 5) This will be one phase construction and the entire project must be completed within 120 days of the initial issuance of a certificate of occupancy or temporary certificate of occupancy for any building in the project, 6) The living room area, which is the area in the Village area between Buildings N and O, will be the only area that will have overhead strung lights as depicted in the rendering, 7) The applicant will address the safety features along the pedestrian access in front of the fountain feature at the corner of 1709 and Carroll Avenue and will be ready to report to Council regarding their discussion with TXDOT concerning placing hardscape into the right-of-way, 8) The decorative architectural lighting features and also amenities, such as the custom benches, and fire pits, will be substantially similar to what has been presented in the renderings, 9) Noting the applicant’s willingness to incorporate Village features into the Rim area buildings 10) That Building Tower Road and Zena Rucker Blvd is part of the phasing stipulation mentioned earlier 11) Including a requirement that improvements needed on S. Carroll Avenue adjacent to the project be completed along with the project, subject to the same stipulations 12) Including a recommendation that variances 1-5 be approved as presented and requested a) Driveway Stacking, b) Driveway Spacing c) Driveway Connections d) Parking Lot Landscape Islands e) Lighting Design. Integral Color Concrete Exhibit Parapet Screening Mechanical Equipment Parapet Screening Mechanical Equipment