2013-08-26 Meeting Report (Silver Ridge Assisted Living)
SPIN MEETING REPORT
CASE NO. ZA13-077, ZA13-078, and ZA13-079
PROJECT NAME:
Silver Ridge Assisted Living
SPIN DISTRICT:
SPIN # 4
MEETING DATE:
August 26, 2013; 8:00 PM
MEETING LOCATION:
1400 Main Street, Southlake, TX
Training Rooms 3A 3B
TOTAL ATTENDANCE:
Five (5)
SPIN REPRESENTATIVE(S) PRESENT:
Lou Hillman #4
APPLICANT(S) PRESENTING:
Randi Rivera, GNA
STAFF PRESENT:
Lorrie Fletcher, Planner I; Patty Moos, Planner I
STAFF CONTACT:
Daniel Cortez, Planner II: (817)748-8070 or dcortez@ci.southlake.tx.us
EXECUTIVE SUMMARY
Property Situation
The property is located at the southwest corner of East Kirkwood Boulevard and North
Kimball Avenue.
Development Details
The Silver Ridge Independent Living Cottages site plan proposes Lot 4 for 6 senior one
story independent living residential cottages, with 4 units each and a clubhouse, in
conjunction with the assisted living center currently under construction on Lot 1. The
Medical Offices site plan proposes Lots 2,3,5,6, and 7 for five one story medical office
buildings ranging from 4,240 SF to 8,000 SF located along East Kirkwood Blvd. These
medical buildings will match the stone architectural design of the Kimball office buildings
currently under construction on North Kimball Avenue adjacent to this site.
The Plan presented at SPIN:
Independent Living Cottages:
Aerial View of Site
Independent Living Cottage
Medical Offices:
Aerial View of Site
Medical Offices
QUESTIONS / CONCERNS
Where will the access from Kirkwood be located?
The drive will be located between lots 2 and 3. Additional access will be further
Î
east on East Kirkwood Blvd. and off North Kimball Avenue.
Where is the overhead utility easement on the plan?
The overhead easement is located between lots along the east side of Lot 5.
Î
Meeting presentation adjourned at 8:10 pm
SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official
meeting minutes; rather it serves to inform elected and appointed officials, City staff, and the public of the issues and questions raised by residents and
the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are
strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council.