Loading...
Item 4E Revised Design Services Agreement w/BRS for Community Recreation Center Item 4E Requested Action Approve Architectural/Engineering Design Services Agreement Community Recreation Center $3,248,088 Financial Consideration Current Project Funding = $11,209,234 Proposed Agreement = $ 3,248,088 Current Approved Concept Plan June Retreat Develop Design for Phased Construction Phase 1 Community/Seniors Phase 2 Rec/Fitness/Aquatics $13,000,000 $31,600,000 CRC Development Plan Option A (Staff Recommendation at June Retreat) Design Entire Facility and Construct Phase 1 May 2015 Election Construct Phase 2 Assumes a May 2015 Election to Repurpose the CCPD CRC Development Plan Option B Design and Construct Phase 1 May 2015 Election Design and Construct Phase 2 Assumes a May 2015 Election to Repurpose the CCPD Timeframe & Costs *Notes: Design = Full Phase 1 & Phase 2 thru Schematic (Est. = $1,624,413 + 10%) Construction = Plus 3% in 2013, plus 5% annually through 2017 Timeframe & Costs Summary Survey Data 2009 Citizen Survey Survey Data 2010 Feasibility Study Survey Survey Data 2010 Feasibility Study Survey Survey Data 2010 Feasibility Study Survey Survey Data 2010 Feasibility Study Survey Survey Data 2010 Feasibility Study Survey Survey Data 2010 Feasibility Study Survey Project Background 9/05 - Parks Master Plan 8/06 – Facilities Master Plan 8/09 – Joint CC/SPDC/ Parks Board Mtg 6/08 – CC June Retreat 10/8 – 2009 CIP funding 10/08 – Gateway site explored 1/11 – Final BRS pres. 6/11 – CC June Retreat 1/10 – BRS study 3/10 – Citizen focus groups 5/10 – Citizen survey conducted 8/10 – BRS presentation to CC 11/96 - Parks Master Plan 4/01 – Parks Master Plan 9/07 – Byron Nelson concept Background 1996 Parks Master Plan Pg. 35 - 2001-2011 unfunded recommendations “Need for a school/city multi-use athletic facility” Pg. 36 – Survey of Residents Rec/Fitness Center Multipurpose Fitness Center Background 2001 Parks Master Plan Pg. 7.1 - Priorities and Recommendations: “Southlake currently has no recreation center offering the listed facilities 1 through 7.” Gymnasium/Sport Court Indoor Jogging Track Exercise/Fitness Room Youth Activity Center Classroom Aerobics/Dance Studio Craft Room Background 2005 Parks Master Plan Pg. 8-10 – Project Ranking Through the 5-Year CIP Phase 4 (year 4) 2008-2009 Recreation Center Background 2006 Facilities Master Plan Community Center: full service community center providing recreational opportunities for entire family (infant to senior citizen) facility to be developed along with a Library and Senior Center Background 2009 CIP Project Description Recreation Center, Senior Center and Library: significant areas of training, recreational class offerings, gymnasium space, and other amenities potential campus style setting with Library and Senior Center utilizing shared space and infrastructure Background BRS Feasibility Study Multipurpose Community Facility: multi-purpose community recreation center Included uses: recreation center senior center Library city office space public meeting spaces local/regional performance arts center, and storage A&E Cost Analysis Questions?