Loading...
Items 6A and 6B CP13-001 Land Use Plan Amendment ZA13-019 Zoning Change & Site Plan for Capelli Offices & Suites Items 6A & 6B CP13-001 / ZA13-019 Owner: Greg Taylor Applicant: GVW Resources LLC Request: Approval of a Land Use Plan Amendment and a Zoning Change & Site Plan Location: 321 W. Southlake Blvd. CP13-001 – Land Use Plan Amendment Existing Land Use Designation – Office Commercial Proposed Land Use Designation – Mixed Use May 21, 2013; City Council approved 1st reading as presented. Detailed Changes S-P-1 Regulations Previously Proposed Currently Proposed Previously Proposed Site Plan Currently Proposed Site Plan Site Plan – What’s Changed? Open space reduced from 41,820 square feet to 28,027 square feet Impervious coverage has increased from 64.57% to 67.82% Parking spaces increased from 95 to 118 (to include adjacent property) Reduced number of salon suites in Building one from 48 to 45 + 9 p.s. + 4 p.s. + 10 p.s. Original total 95 p.s. Site Data Summary 2007 - Approved Site Plan for Medical Villas View Showing Existing Fencing Previously Proposed Landscape Plan Currently Proposed Landscape Plan Building 1 – No Exterior Changes / Reduced to 45 Suites Building 1 Southeast Northwest North Building 2 – Increased Masonry Materials Previously Proposed Currently Proposed Building 2 North East South West Building 3 – Increased Masonry Materials Previously Proposed Currently Proposed Building 3 North East South West May 9, 2013; Approved CP13-001 (4-0) as presented. May 9, 2013; Approved ZA13-019 (4-0) stating the following: Dress up the west façade of building one, bringing forward some alternative articulations; Add mature evergreen tree(s) in between buildings 2 and 3 to help buffer the view from the neighbors to the south; Applicant committed to replacing the existing fence on the southern boundary with an 8-foot stained (on both sides) cedar wood fence. And, subject to Site Plan Review Summary No. 3, dated May 1, 2013 and Staff Report dated May 3, 2013. P&Z Action May 21, 2013; Approved 1st reading for CP13-001 (4-0) as presented. May 21, 2013; Approved 1st reading for ZA13-019 (6-0) noting the applicant will address concerns for the left and right elevations for buildings 2 and 3 to include additional masonry or stone materials to provide a more consistent design element on those buildings; the applicant will provide a more comprehensive parking study and analysis with possible additions to the parking as related to the adjacent tract (Taylor); and provide more information regarding tenant occupancy for the proposed use. City Council Action Questions? Aerial View Building 1 – Revised May 14, 2013 North East South West Building 1 – Floor Plan Building 2 North Building 2 – Floor Plan Building 3 North Building 3 – Floor Plan Bird’s Eye View Before and After Photos 132 Londonberry before 136 Londonberry after 132 Londonberry after 136 Londonberry before Hurst Location Paving Plan Grading Plan Drainage Plan Utility Plan Tree Preservation Plan Buffer Yard Plan