Loading...
White Chapel Blvd Widening - Letter for Temporary Construction Easement (Ledbetter Family) CITY OF SOUTHLAKE Public Works Administration 1400 Main Street I Suite 320 I Southlake, Texas 76092 I (p) 817- 748 -8098 I (f) 817- 748 -8077 May 8, 2013 [Certified Mail, Return Receipt Requested # 7010 0290 0002 2574 6438] Bob Ledbetter 100 Churchill Circle Southlake, Texas 76092 Re: OFFER: 100 Churchill Circle, Southlake, Texas City of Southlake Road Widening Project All Trees and shrubs within six feet of the retaining wall and a ten foot wide temporary Construction Easement being located at the western most back property line as shown in the attached drawing in the City of Southlake, Tarrant County, Texas Dear Mr. Ledbetter: The City of Southlake (City) is in the process of acquiring a temporary construction for the Widening of White Chapel Blvd. which is needed to serve the existing development in the City, and is necessary to serve the public health, safety and welfare. Because the City's negotiations to purchase a temporary construction easement, has been successful to date, an offer is being submitted. • Temporary Construction Easement 2,672 sq feet x $1 = $2,672.00 • 5 Large Trees at $1,000 each = $5,000.00 • 1 Small Tree at $500 each = $ 500.00 • 6 Large Multi - Branch Shrubs at $250 each = $1,500.00 Total: $9,672.00 For the temporary construction easement, all trees and shrubs within six feet of the wall on the property needed by the City for this project. Every effort will be made to save all trees and shrubs but as a precaution all homeowners will be paid for trees and shrubs within six feet of the new retaining wall. The City Council has authorized me to make a Total Offer of $9,672. During the construction process, a temporary eight foot screening fence will be installed. This fence will be made of chain link and covered with black construction material as to block the view of your property. All sprinkler heads in the construction easement will be capped during the construction and reconnected at the end of the project. This construction easement is for a period Invocation • Intcgrin • Accountability • Commitm to Excellence • Icam■ork Bob Ledbetter Page 2 of 2 May 2, 2013 of two years and the construction of the permanent retaining wall will be a high priority on this project. The old wall will be removed and replaced with a new brick screening wall constructed on the edge of the City's street right of way adjacent to a 6 ft wide concrete sidewalk. The screening wall will be 7 foot high from the finished elevation of the sidewalk. All side yard fences will be reattached at the City's expense to the new screening wall. The City would prefer to resolve this matter with you by agreement; please respond to this offer no later than by May 22, 2013. We hope you will give this offer serious consideration. If in agreement, please sign the offer letter and return it to the City of Southlake in the attached envelope. If you have any questions, or wish to discuss this matter or the City's offer in more detail, please contact Mr. Jerry Hodge of Hodge & Associates at (817) 991 -3161 or jerryh64 @verizon.net. Sincerely, Steven D. Anderson, P.E. Civil Engineer cc: Robert Price, P.E., Director of Public Works EXECUTED this / day of / Jq ,2013 HOMEOWNER: < BOB LEDBETTER By: 100 Churchill Circle Southlake, Texas 76092 Imgrity • Innovation • Acax • Commitment to Ex • Tcannaotk