Loading...
Item 4K Plat Revision for Lots 6R1 – 13R1, Block 19, Carillon Phase 1A ZA12-103 ZA12-103 Owner: Hines-GTIS Carillon LLC Applicant: Jacobs Engineering Group, Inc. Request: Approval of a plat revision for Lots 6R1 – 13R1, Block 19, Carillon Phase 1A to change the side setbacks for Lots 6R-13R, Block 19, from a 10’ building separation with 5’ setback on both sides to a zero setback on one side and a 10’ setback on the other side as designated on the plat Location: 400 – 429 Monte Carlo Dr. Previous Plat revision phase 1a Plat revision ZA12-103 Planning and Zoning Commission: November 8, 2012; Recommended Approval (7-0) subject to Plat Review Summary No. 2 dated November 2, 2012 and noting the staff report dated November 2, 2012. Item 4C Questions? Ken Baker (817) 748-8067