Loading...
Item 6FCITY 01 SOUTHLAKE Department of Planning & Development Services STAFF REPORT November 28, 2012 CASE NO: ZAl2 -096 PROJECT: Site Plan for Verizon Wireless Expansion EXECUTIVE SUMMARY: On behalf of Verizon Wireless, Halff Associates, Inc. is requesting approval of a Site Plan for an expansion of the existing facility on property located at 500 W. Dove Rd. and described as Lot 1, Block 1, Solana Addition, an addition to the City of Southlake, Tarrant County, Texas. SPIN # 1. REQUEST DETAILS: The applicant is requesting approval of a site plan for a Verizon Wireless expansion to add a two - phase, two -story expansion with approximately 5,800 square feet of floor area on each floor and an approximately 6,500 square foot service yard. The ground floor (one- story) Phase 1 expansion will house a redundant chilled water plant. The Phase 2 second -story is labeled as unassigned shell space. A backup generator and four air - cooled chillers will be contained within the service yard adjacent to the building expansion. Since the expansion area will not house additional employees, no additional parking is proposed with this expansion. The original concept plan for Verizon approved in 2001 showed a three -story parking garage in the area of the proposed expansion, but since expansion areas that were planned for administrative space are being developed as mechanical and electrical infrastructure, a parking garage is not needed or planned at this time. To address concerns about the chain link fence that was originally proposed around the service yard, the Planning and Zoning Commission added a condition in their recommendation for approval to replace the chain link fence with a wrought iron fence. Revised renderings showing the wrought iron fence have been provided by the applicant. ACTION NEEDED: 1) Conduct a public hearing 2) Consider approval of a site plan ATTACHMENTS: (A) (B) (C) (D) (E) (F) Background Information Vicinity Map Plans and Support Information — Link to PowerPoint Presentation Site Plan Review Summary No. 3, dated November 27, 2012 Surrounding Property Owners Map and Responses Full Size Plans (for Commission and Council Members Only) Case No. ZAl2 -096 STAFF CONTACT: Ken Baker (817)748 -8067 Richard Schell (817)748 -8602 Case No. ZAl2 -096 BACKGROUND INFORMATION ITA /e1 »I[91e1►1116 PROPERTY ADDRESS: Verizon Wireless Halff Associates, Inc. 500 W. Dove Rd. PROPERTY DESCRIPTION: Lot 1, Block 1, Solana Addition LAND USE CATEGORY: Mixed Use CURRENT ZONING: "NRPUD" Non - residential Planned Unit Development District HISTORY: - A Rezoning and Concept Plan for Solana (Non - residential) to "NR -PUD" Non - Residential Planned Unit Development with "C -3" General Commercial District, "0-2" Office District, "HC" Hotel District, and "CS" Community Service District uses was approved by City Council on October 17, 1995. - A site plan (ZA01 -056) was approved by City Council on June 14, 2001. - A preliminary plat (ZA01 -058) for Lots 1 and 2, Block 1, Solana Addition was approved by City Council on June 14, 2001. - A final plat (ZA01 -059) for Lot 1, Block 1, Solana Addition was approved June 14, 2001. - A site plan (ZA11 -050) to add an approximately 56,529 square foot two -story expansion to the existing Verizon Wireless facility for increased network space and area for infrastructure and a service yard surrounded by a twenty (20) foot wall adjacent to the expansion was approved November 15, 2011. Construction is underway on this expansion. PATHWAYS PLAN: Southlake's Pathway System Master Plan shows a planned ten (10) foot multiuse trail adjacent to the S.H. 114 frontage and an existing eight (8) foot trail adjacent to west Dove Rd. When the site plan for Verizon Wireless was approved in June of 2001, the Council motion stipulated that if the ten (10) foot trail along SH 114 was constructed within ten years, the applicant would pay their pro -rata share of the construction. TREE PRESERVATION: Five (5) existing trees are proposed to be removed for the expansion. One of the Post Oaks that is proposed to be removed is in decline and does not require mitigation. The four trees to be mitigated total 39 caliper inches. Seven (7) 4" caliper Live Oaks and three (3) 4" caliper Bald Cypress trees totaling forty (40) caliper inches are shown as mitigation trees on the Overall Landscape Plan. CITIZEN INPUT/ BOARD REVIEW: A SPIN Meeting for this project was held for November 5, 2012. The SPIN Report is attached as Attachment D of this report. PLANNING AND ZONING COMMISSION ACTION: November 8, 2012; Approved (7 -0) subject to Site Plan Review Summary No. 2 dated November 2 nd and Staff Report dated November 2 noting the applicant's willingness to conduct a sound study prior to permitting, noting the applicant's willingness to replace the shrubs and trees that have been impacted during construction of the other phase and also the shrubs and trees Case No. Attachment A ZAl2 -096 Page 1 that will be impacted by this construction and also noting the applicant's willingness to construct a wrought iron fence as opposed to a hurricane fence around the chillers. STAFF COMMENTS: Attached is Site Plan Review Summary No. 3, dated November 27, 2012. Case No. Attachment A ZAl2 -096 Page 2 Vicinity Map Verizon Wireless 0 9- G SH 114 1111. N ZAl2 -096 Site Plan 500 W. Dove Rd. T _E 0 550 1,100 2,200 s Feet Case No. Attachment B ZAl2 -096 Page 1 IkilVANVli %Iky /;a4AaIN1V WFW ■ Wick Fisher White • E.C. Bruce Ernst, P.E. President November 1,2012 • Vice Presidents expansion to be a very large 3 -story parking garage, refer to the original concept Christopher C. Arnold, P.E. City of Southlake Patrick C. Chan, P.E. Department of Planning and Development Anthonv M. Dil.eonardo, P g P LEED AP, CxA 1400 Main Street - Suite 310 Stephen P- white, P.E. Southlake, TX 76092 LEED AP A 2N chilled water plant expansion is planned to the northwest side of the z • Associates RE: Verizon Wireless Matthew T. Cofone, P.E. lower floor level will be flush with the ground floor of the existing facility. The 500 West Dove Road CEM. LEED AP, CBIE z building will be built in two phases.. Phase 1 will be constructed first and with Baice O. Gessner phase two being constructed at a later date. 2N Chiller Plant- Development Plan E. Daniel Jewell, P.E. Cover Letter and Narrative Robert A. Knese, P.E. WFW #1120155 LEED AP Steven L. Marks, P.E. Second Revision Lawrence Myers, P.E. Jeffrey E. Pills Chan V. Thai, P.E. To Whom it May Concern: Below is a description of the existing building and the proposed building expansion: The existing Verizon Wireless (VZW) Southlake facility is located at 500 West Dove Road in Soutlllake, Texas. It is primarily a 2 -story building with a small a third story portion which will not be impacted by the proposed work. It is situated on a 25 acre site, bounded by State Highway 114 to the west, West Dove Road to the south, Kirkwood Boulevard to the east, and a neighboring property to the north. The original planned expansion concept in 2001 was for this break wing expansion to be a very large 3 -story parking garage, refer to the original concept plans included. The scope has changed and VZW is now proposing a small expansion for equipment to support a redundant chiller plant. The original plan for the building was to add more administrative areas. Due to VZWs growth and c n need for equipment to support that growth, telecom equipment, and mechanical P4 and electrical infrastructure are required. There is additional parking planned in the future, but not a garage at this time. W W A 2N chilled water plant expansion is planned to the northwest side of the z expansion, extending from the existing break room wing at the ground floor. The expansion will be a 2 -story expansion with for 5,800 sgfteach floor. The ~ lower floor level will be flush with the ground floor of the existing facility. The C7 upper level will be level with the existing first floor break room area. The z building will be built in two phases.. Phase 1 will be constructed first and with W phase two being constructed at a later date. 111 South Independence Mall East ■ Suite 400 • Philadelphia, PA 19106 • 215- 627 -0200 ■ 215- 627 -8240 fax ■ www.wfweng.com Case No. Attachment C ZAl2 -096 Page 1 WFW ■ Wick Fisher White City of Southlake Department of Planning and Development RE: Verizon Wireless 500 West Dove Road 2N Chiller Plant- Development Plan Cover Letter and Narrative WFW #120155 -2- November 1, 2012 Second Revision A backup generator and four air- cooled chillers will be within a new mechanical yard to the northwest of the expansion. New spaces in the expansion will include space for an air handling unit, chilled water storage and pumps, electrical rooms, a preaction sprinkler room and a service area with an overhead door to the exterior. Interior connection to the existing ground floor will be via. a double door into the existing Site Maintenance Room. The existing site is zoned NR -PUD (non- residential planned unit development) with C -3, 0-2, HC and CS (general commercial, office, hotel and community service) designations also. The design conforms to all zoning and site requirements. Site access is via West Dove Road and Kirkwood Boulevard. Existing parking is provided primarily to the south side of the site. At this time parking required for the expansion will be provided on -site in an expanded parking area being built under the scope of the Data Center Expansion Wing project. The design team will continue to assess the parking needs of this project in subsequent design phases. The perimeter of the property is open with landscaping throughout. The expansion will continue the design strategy set by the existing landscape design, which requires chain -link fencing at mechanical yards as required by VZW design standards. Chain -link fencing will surround the new mechanical yard only and will match existing fencing already on site. Several trees will be removed to make room for the expansion and will be replaced along with any other landscaping required per the City of Southlake. The landscaping design will continue to be developed in subsequent phases. Underground site utilities are in the vicinity of the expansion to the southwest and will need to be protected during construction. Any asphalt paved areas and disturbed landscaping will all be restored to match existing conditions. Case No. Attachment C ZAl2 -096 Page 2 WFW ■ Wick Fisher White City of Southlake Department of Planning and Development RE: Verizon Wireless 500 West Dove Road 2N Chiller Plant- Development Plan Cover Letter and Narrative WFW #120155 -3- November 1, 2012 Second Revision General Building g escriptions Applicable Codes in addition to the VZW Standards governing the proposed work include: • Building Code: 2009 IBC • Electrical Code: 2008 NEC • Mechanical Code: 2009 IMC • Plumbing Code: 2009 IPC • Energy Conservation Code: 2009 IECC • Fire Code: 2009 IFC The existing structure is constructed as a type IIB building, consisting of a tilt -up concrete wall panel system with metal deck with concrete fill supported by an unprotected steel beam and column system. The structural aspects of the proposed addition are covered in the Structural Basis of Design. The interior is constructed entirely of non - combustible 1 -hour construction, 518" Type - "X" gypsum wallboard (GWB) over metal stud construction. The interface between the proposed and existing construction will be separated by a 2" expansion joint, structurally separating them. The new addition will be constructed to match the existing exterior in appearance per VZW architectural standards. The exterior wall will be 8" CMU with vapor barrier, rigid insulation and a brick veneer to match the existing facility. Additionally the parapet area will be finished in EIFS to match existing. The structure will be steel columns and beams. The roof will be concrete slab on metal deck; this arrangement will allow for a future second floor to be constructed if the need arises. The interior of the building, including the underside of the exposed roof deck and structural framing will be painted to match existing. Where existing exterior wall is to remain, the exposed concrete panels will be furred and covered with GWB and painted to match the new interior color scheme. The new ground floor system will be reinforced concrete slab on grade. Case No. Attachment C ZAl2 -096 Page 3 WFW ■ Wick Fisher White City of Southlake Department of Planning and Development RE: Verizon Wireless 500 West Dove Road 2N Chiller Plant- Development Plan Cover Letter and Narrative WFW #120155 -4- Second Revision November 1, 2012 Minimal work will occur within the existing building. A door will be provided to communicate between the expansion and existing Site Maintenance Area. This door will be for convenience only- all egress and exiting requirements are provided in the expansion design. Additionally, the expansion does not change egress or exiting from the existing facility. The new door assembly will meet current VZW fire rating requirements and all wall penetrations will be firestopped per current VZW and Code Standards. Space Allocation by Room First Level Electrical Room A 668 SF Electrical Room B 85 SF Electrical Room C 90 SF Preaction Room 204 SF Chilled Water Plant 4.327 SF Phase 1 Total 5,374 SF Second Level Space to be determined 5800 SF If you have any questions in reference to the above, or need additional information, please feel free to call. Very truly yours, AMD:rw WICK FISHER WHITE Anthony M. DiLeonardo Case No. Attachment C ZAl2 -096 Page 4 SITE PLAN VICpNTV MAP - N,TS. N ', 's PROPOSED ° EXPANSION , FF r E� 0 0 t ° �xao\�1 STOCKTON DRIVE BENGHMF Case No. ZAl2 -096 Attachment C Page 5 USOUTHLAKE SPIN MEETING REPORT CASE NO. ZAl2 -096 PROJECT NAME: SPIN DISTRICT: MEETING DATE: MEETING LOCATION Verizon Wireless Expansion SPIN # 1 November 4, 2012; 7:00 PM 1400 Main Street, Southlake, TX Training Rooms 3C — 3D TOTAL ATTENDANCE: Ten (10) • SPIN REPRESENTATIVE(S) PRESENT: Rob Baker #1 • APPLICANT(S) PRESENTING: Wick Fisher White, Jacobs Wyper, et al (5) • STAFF PRESENT: Caroline Eckel, Planner I STAFF CONTACT: Richard Schell, Planner II: (817)748 -8602 or rschelI(Q -6. south lake.tx.us EXECUTIVE SUMMARY Property Situation • The Verizon Campus is located at 500 W. Dove Road, bordered by S.H. 114 to the west and Kirkwood Blvd. to the east. Development Details • Site Plan proposed for a two- phase, two -story Verizon Wireless expansion with approximately 5,380 square feet of floor area on each floor and an approximately 6,500 square foot service yard. • Phase I of the expansion will be for equipment storage. Phase II would happen at a later date, and is currently undesignated space. It could house additional equipment or be used for administration. No additional parking required. The plan presented at SPIN: Phase I Case No. Attachment D ZAl2 -096 Page 1 Phase II QUESTIONS / CONCERNS • Can you see it from S. H. 114? Phase I, no. You would only see the top of the parapet of the existing building. Phase II, you may see the top of the parapet. • Will the expansion add to the noise level? This expansion should not add any additional noise, beyond the current noise level. The added generators in this area are part of a redundant system, so they will not run all of the time. They will be exercised once a month. • With the current expansion under way, there are already additions to the building with new generators, and now you're adding more generators? I am concerned that the noise will increase. This is a redundant system, exercised monthly, and only running when the other system is down. We will conduct a sound study. • Another developer is proposing a residential development on the property north of the Verizon Campus, Williamsburg Estates. The backyards of those homes may face this new expansion. c We will coordinate with that developer. • Although the expansion is not visible from the road, we would prefer anything other than chain link fencing. It is tucked behind the building, and you will never see it. • The current phase of construction – although it's not part of this proposed project— has killed trees along the perimeter of the site, and the location of the construction trailers are awful. We will report back. • Once the second story is added during Phase II, will you not see this addition from S.H. 114 or the service road? c, You may see the top corner of the parapet. Maybe. Case No. Attachment D ZAl2 -096 Page 2 • If, in the future, additional development occurs around the property and trees are removed, will the generators /chain link fence be visible? We don't want for the entrance to our city to lock industrial. Very little would be visible. Landscaping on our property buffers the view. We still don't like the chain link fence. It is not appropriate for our city. We would prefer a masonry wall for sound abatement. The proposed chain link fence is matching the existing chain link fencing currently used on the back side of the property. Please coordinate with the developer of Williamsburg Estates to the north. We are concerned about low home values in that area adjacent to S.H. 114, and the view of this expansion may make those homes more difficult to sell. It is important for us to preserve property values. We will coordinate with that developer, conduct a sound study, and look closely again at our sightlines. We are sure that landscaping on both properties will provide a buffer. Since the proposed expansion includes a large space for equipment storage, wil[ this cause more truck traffic in the area, for deliveries or distribution? No, the equipment is for use within the building. It is data center equipment. The current construction yard on the Verizon Campus has been problematic. Where will the construction yard/staging be for this project? We would have an open bid for this project. However, it would be convenient if the group working on the current project could stay. Their construction trailers /equipment would already be in place and we would not need to set up a new staging area. The current construction site has a temporary parking lot, is it planned to become permanent? This proposed expansion will require no additional parking? C We believe the current temporary lot is planned to become permanent; additional parking was planned as part of the originals campus. It is likely needed to accommodate visitors to the building, but no additional parking will be needed for this proposed expansion. The proposed space Is being used only to house equipment. With all of the construction, and especially with the additional parking becoming permanent, additional landscaping along Kirkwood Blvd. is important to us. Homes back up to Kirkwood along the east side of the campus. Additional landscaping and replacement of trees would help provide a buffer. The 3 rd Phase of Kirkwood Hollow often experiences power outages, especially during the summer. We wonder if this neighboring campus drains our power. We have excellent back -up systems in place which help to prevent us from losing power. So it may appear that our lights are on when yours are out, but we just have extensive emergency systems in place. SPIN Meeting Reports are general observations of SPIN Meetings by City staff and SPIN Representatives. The report is neither verbatim nor official meeting minutes; rather it serves to inform elected and appointed officials. City staff, and the public of the issues and questions raised by residents and the general responses made. Responses as summarized in this report should not be taken as guarantees by the applicant. Interested parties are strongly encouraged to follow the case through the Planning and Zoning Commission and final action by City Council. Case No. Attachment D ZAl2 -096 Page 3 SITE PLAN REVIEW SUMMARY Case No.: ZAl2 -096 Review No.: Three Date of Review: 11/27/12 Project Name: Site Plan — Verizon Wireless Expansion APPLICANT: Ignacio Herrera Halff Associates, Inc. 1201 N Bowser Road Richardson, TX 75081 Phone: (214) 217 -6646 E -mail: iherrera @halff.com OWNER: Keith Shuda Verizon Wireless 145 Chubb Way Brachbura, NJ 08853 CITY STAFF HAS REVIEWED THE ABOVE REFERENCED PROJECT RECEIVED BY THE CITY ON 11/20/12 AND WE OFFER THE FOLLOWING STIPULATIONS. THESE STIPULATIONS ARE HEREBY MADE CONDITIONS OF SITE PLAN APPROVAL UNLESS SPECIFICALLY AMENDED BY THE CITY COUNCIL. IF YOU HAVE ANY QUESTIONS OR NEED FURTHER CLARIFICATION, PLEASE CONTACT RICHARD SCHELL AT (817) 748 -8602 OR DENNIS KILLOUGH AT (817) 748 -8072. Tree Conservation /Landscape Review Keith Martin Landscape Administrator Phone: (817) 748 -8229 E -mail: kmartin @ci.southlake.tx.us TREE CONSERVATION COMMENTS: The symbol in the legend on Sheet L1.01 that is labeled as Texas Red Oak 3" caliper is labeled on the plan as Claudia Wannamaker Magnolias 3" caliper. There are six trees shown. Please change one of the labels so that the plan matches the legend. There are five (5) existing trees that are proposed to be removed for the development expansion. One of the Post Oaks that is proposed to be removed is in decline and does not require mitigation. The four trees to be mitigated total 39 caliper inches. The ten trees shown to be provided on Sheet L1.00 total 40 caliper inches. Please be aware that all existing trees shown to be preserved on the City Council approved Tree Conservation Plan must be preserved and protected during all phases and construction of the development. Alteration or removal of any of the existing trees shown to be preserved on the approved Tree Conservation Plan is a violation of the Tree Preservation Ordinance and the zoning as approved by the Southlake City Council. Please ensure that the layout of all structures, easements, utilities, structures grading, and any other structure proposed to be constructed do not conflict with existing trees intended to be preserved. LANDSCAPE COMMENTS: The proposed landscaping is compliant. The applicant is proposing to also provide additional Case No. Attachment E ZAl2 -096 Page 1 landscaping across the access and in the bufferyard. All of the required bufferyards and interior landscape plantings were installed during the initial development of the property. Because the area surrounding the development is primarily turf /pasture, a lot of the required bufferyard shrubs were placed within the parking area and closer to the building. # Indicates required items. Indicates informational staff comments. Fire Marshal Review GENERAL COMMENTS: Automatic fire sprinkler system and fire alarm will be required for addition to existing building. Submit plans to Reed Fire Protection, 14135 Midway Road, Suite G260, Addison, Texas 75001. Phone 214 - 638 -7599. Remote Fire department connection and underground piping must be hydrostatically tested after it is relocated to a permanent position. Provide signage for Fire Department Connection. Provide signage for all electrical rooms and other pertinent areas. FIRE LANE COMMENTS: Fire lanes require a minimum 30 foot inside turn radius and a minimum 54 foot outside turn radius. (per 2009 I.F.C. Sec. 503.2.4) Dead -end fire lane indicated on prints must be a maximum of 150 feet long. FIRE HYDRANT COMMENTS: Fire hydrant locations are satisfactory as shown on the submitted plan. INFORMATIONAL COMMENTS: All construction plans to be submitted for a building permit must conform to the edition of the International Fire Code currently amended and adopted. Building Inspections Review Susie Hernandez Plans Examiner (817) 748 -8238 Accessibility: Must meet Texas Accessibility Standards. Lighting: Case No. Attachment E ZAl2 -096 Page 2 Must meet City Lighting Ordinance. Comments: A construction trailer for this project may not be allowed based on existing projects on this site and existing trailers. Public Works /Engineering Review Steve Anderson, P.E. Civil Engineer Phone: (817) 748 -8101 E -mail: sanderson @ci.southlake.tx.us Cr7N1 0 1 1N1 VIA lKeT197JiIJiIN1 0 1 111 &'1 No comments. General Informational Comments: A SPIN meeting is scheduled for November 5, 2012. No review of proposed signs is intended with this site plan. A separate building permit is required prior to construction of any signs. All mechanical equipment must be screened of view right -of -ways and residential properties in accordance with the Zoning Ordinance No. 480, as amended. All lighting must comply with the Lighting Ordinance No. 693, as amended. All development must comply with the Drainage Ordinance No. 605 and the Erosion and Sediment Control Ordinance No. 946, as amended. It appears that this property lies within the 75 LDN D /FW Regional Airport Overlay Zone and will require construction standards that meet requirements of the Airport Compatible Land Use Zoning Ordinance No. 479. Development must comply with all requirements in Zoning Ordinance No. 480, Section 43, Overlay Zones. The applicant should be aware that prior to issuance of a building permit a Plat must be processed and filed in the County Plat Records, a fully corrected site plan, landscape plan, irrigation plan, and building plans, must be submitted for approval and all required fees must be paid. This may include but not be limited to the following fees: Park Fee, Perimeter Street Fee, Water & Sewer Impact and Tap Fees, and related Permit Fees. Denotes Informational Comment cc Case No. Attachment E ZAl2 -096 Page 3 SURROUNDING PROPERTY OWNERS Verizon Expansion 19 16 18 17 20 SPO # 1. Owner Mesenbrink, Daniel S Etux M L Zoning RPUD Land Use Medium Density Residential Acreage 0.67 Response NR 2 Kirkwood Hollow Homeowners,Asn RPUD Medium Density Residential, 1.17 NR 3 Kirkwood Hollow Homeowners,Asn RPUD Medium Density Residential 0.70 NR 4 Kirkwood Hollow Homeowners,Asn RPUD Medium Density Residential, 0.09 NR 5. Litwin, Mark S RPUD Medium Density Residential 0.51 O 6. Arison, Joan C Etvir Alan S RPUD Medium Density Residential 0.44 NR 7. Green, Kayle C Etux Tina A RPUD Medium Density Residential 0.40 NR 8. Agualimpia, Juan & M Issacs RPUD Medium Density Residential 0.38 NR 9. Kirkwood Hollow Ho Assoc RPUD Medium Density Residential, 0.74 NR 10. Zhou, Jun Etux Na Li RPUD Medium Density Residential 0.38 NR 11. Bollini, Sashidhar Etux Sesha RPUD Medium Density Residential 0.37 NR 12. Mansoor, Shadan RPUD Medium Density Residential 0.40 NR 13. Kirkwood Hollow Ho Assoc RPUD Medium Density Residential, 0.32 NR 14. Southlake, City Of RPUD Medium Density Residential 0.44 NR 15. Kirkwood Hollow Ho Assoc RPUD Medium Density Residential 0.46 NR 16. Kirkwood Hollow Home Own Ass RPUD Medium Density Residential 0.14 NR 17. Verizon Wireless Texas Llc NRPUD Mixed Use 24.86 NR 18 Maguire Ptnrs - Solana Ltd NRPUD 100 -Year Flood Plain, Mixed Use 4.19 NR 19 Maguire Prtnrs Solana Holdings NRPUD Mixed Use, 100 -Year Flood Plain 19.99 NR 20. Dove 114 Infinity Llc SP2 Mixed Use 54.44 F Responses: F: In Favor Case No. ZAl2 -096 O: Opposed To U: Undecided NR: No Response Attachment F Page 1 Notices Sent: Responses Received Twenty (20) Four (4) — Two mail outs and two responses from two owners Case No. Attachment F ZAl2 -096 Page 2 IN;&1 11e7►6- -1*arelaI:RIiJi /e11111111111115el1j1 Notification Response Form ZAl2 -096 Meeting Date: November 8, 2012 at 6:30 PM Dove 114 Infinity Llc -'121 S Carroll Ave Southlake Tx, 76092 A1620 1 Direct questions and mail responses to: City of Southlake Planning & Development Services Notification Response 1400 Main St; Ste 310 Southlake, TX 76092 Phone: (817)748 -8621 Fax: (817)748 -8077 PLEASE PROVIDE COMPLETED FORMS VIA MAIL, FAX OR HAND DELIVERY BEFORE THE START OF THE SCHEDULED PUBLIC HEARING. Being the owners of the property so noted above. are hereby in favo opposed to undecided about (circle or underline one) the proposed Site Plan referenced above. Space for comments regarding your position: Signature: Additional Signature/ Printed Name(s): Must be property owner(s) wh Phone Number (optional): Date:if /Z— Date: Case No. Attachment F ZAl2 -096 Page 3 Notification Response Form ZAl2 -096 Meeting Date: November 8, 2012 at 6:30 PM Dove 114 Infinity Llc -1121 S Carroll Ave Southlake Tx, 76092 A1620 1 Direct questions and mail responses to: City of Southlake Planning & Development Services Notification Response 1400 Main St; Ste 310 Southlake, TX 76092 Phone: (817)748 -8621 Fax: (817)748 -8077 PLEASE PROVIDE COMPLETED FORMS VIA MAIL, FAX OR HAND DELIVERY BEFORE THE START OF THE SCHEDULED PUBLIC HEARING. Being the owner(s) of the property so noted above, are hereby r inor of opposed to undecided about (circle or underline one) the proposed Site Plan referenced above. Space for comments regarding your position: Signature: Additional S(gnature Printed Name(s): Must be property owner(s) wh Phone Number (optional): printed at top. Date: Date: contact the Planni g Department. One form per property. Case No. Attachment F ZAl2 -096 Page 4 Notification Response Farm ZA1 2 -095 Meeting Date: November 9, 2012 at 6 :30 PM Llh+rin, Mark S 417 Cr&ard Dill Dr uthlakc fix,. 76092 22768E 1 1 PLEASE PROVIDE COMPLETED rORMS VIA MAIL, FAX OR HAND DELIVERY BEFORE THE START OF THE SCHEDULED PUBLIC HEARING. Being the owner(s) of the property so noted above, are hereby in fever of oppesed v ,~ undecided about (circle or underline ones the proposed Site Plan referen d above. �'- ��� �r�4: Space for comments regarding your position: fl I N)Vk 116 (_ + 0 V4 Signature_ d �a j A A45 14 , �4 `TLIGY NL-f Date r & - 7014-1 tom . Additional Signature: hWL _ _ Date: Printed Narne(s): Must be o+wn� s) whaw n s are printed a'. Le OthwWas tanlad the Plannin Department tw form r pany- Rr�Y r{ . erne{ 1 - p �'- #1 � W Phone Number ( optional ): Case No. Attachment F ZAl2 -096 Page 5 Notification Response Farm ZAl2 -096 Meeting Date: Novomber 8, 2012 at 6.30 PM Litwin, Mark S 417 Orchard Hill Dr outhlake Tx, 76092 22768E 1 1 PLEASE PROVIDE COMPLETED FORMS VIA MAIL, FAX OR HAND DELIVERY BEFORE THE START OF THE SCHEDULED PUBLIC HEARING. Being the owner(s) of the property so noted above, are hereby in favor of opposed t undecided about (circle or underline one) the proposed Site Platy referenced above. NOV 1 2412A .4x.6:54 Space for comments regarding your position: _1L Signature: Date; 1-16 Additional Signature: Date, �a�2. Printed Names }: aA �� t Must ve praaerty Dwner(s) whose names) are panted at top. Qtheiwlae eon4act the Planning Department. One farm per prWerl+f.. Phone Number (optional): � 1 � W l Case No. Attachment F ZAl2 -096 Page 6 I �� ID 6 OAL4M - �K6 W V�" 2'