Item 4HCITY OF SOUTHLAKE MEMORANDUM (December 4, 2012) To: Shana Yelverton, City Manager From: Robert H. Price, P.E., Director of Public Works Subject: Approve Change Order No. 5 with Circle C Construction Company for the TW King 30 -inch water line in the amount of $230,950 Action Requested: Approve Change Order No. 5 with Circle C Construction Company for the TW King 30 -inch water line in the amount of $230,950. Background Information: The adopted Capital Improvements Program (CIP) includes funds for the construction of the T.W. King 30" Water Transmission Main and Meter Station within the City of Southlake and the Town of Westlake. Freese and Nichols, Inc. has designed and prepared construction plans for the project. The project consists of approximately 19,665 linear feet of 30 -inch water line on West T.W. King Road in Southlake, which continues northwest on the south side of SH114. The line turns south on FM1938 and continues south to connect to the existing line in Florence Road. The project also includes approximately 3,400 linear feet of 12 -inch water line from north of Beam Drive to Florence Road, parallel to the 30 -inch water line. Change Order No. 5 is for an additional 745 linear feet of tunneling of the 30 -inch water line due to changes in subsurface conditions determined during the installation of pipe by open cut after construction began. A breakdown of the change orders associated with this project is as follows: Description Cost Original Contract $6,739,020 Change Order No. 1 - staking 1,500 Change Order No. 2 — Revised Meter Station Sheets 0 Change Order No. 3 — Revised method of construction 0 Change Order No. 4 — Caylor meter addition Change Order No. 5 — Additional tunneling Total Cost 230,950 $7,138,170 The substantial completion date for the T.W. King 30 -inch water transmission main and meter station is set in contract documents as April 15, 2013. Final completion is required by 30 calendar days after the substantial completion date. The contract with Circle includes a bonus of up to $500,000 if they meet the early substantial completion requirements set in the contract documents. Completion of the project before the April 15, 2013 substantial completion date would raise the city's level of confidence that the 30" water line will be complete and functional prior to the high water demand period. The revised bonus payment schedule, below, shall not be subject to change for any reason, including Owner, Engineer or Contractor created delays or claims. Date of Certificate Of Substantial Completion After April 5,2013 March 30, 2013 — April 5, 2012 March 23, 2013 — March 29, 2013 March 16, 2013 — March 22, 2013 March 15, 2013 or earlier $0 $125,000 $250,000 $375,000 $500,000 Financial Considerations: Funds are available in the approved CIP project budget for the T.W. King 30 -inch Water Transmission Line and Meter Station project. The current available project budget for the water line and meter station project is $9,000,000. Strategic Link: The construction of the T.W. King 30" Water Transmission Main and Meter Station links to the city's strategy map relative to focus areas of Infrastructure and Performance Management and Service Delivery. The specific corporate objectives that are met by this construction project are to invest to provide and maintain high quality public assets, and improve performance and delivery of operational processes. Total Bonus to be Paid to Contractor Citizen Input/ Board Review: N/A Legal Review: N/A Alternatives: The Council may approve the change order or deny it. Supporting Documents: Location Map Change Order No. 5 Staff Recommendation: Approve Change Order No. 5 with Circle C Construction Company for the TW King 30 -inch water line in the amount of $230,950 Staff Contact: Robert H. Price, P.E., Public Works Director Gordon J. Mayer, Jr., P.E., City Engineer Cheryl Taylor, P.E., Civil Engineer 1 o Q u air —al gag lag M i l- -T i F;", IN—A Own rr-A, Nn =I lot, I R., ;Z W. Rim n' , - - . ,irm , . VIC ION -rlps slip CL m 0 NONE% 0 0 0 .j CHANGE ORDER No. 5 Dated: December 4, 2012 Project: TW King 30 -inch Water Transmission Main and Meter Station (Seements B. C D and E OWNER City ofSouthlake Contract for $6,739,020.00 Contract Date: February 14, 2012 To: Circle C Construction Company Contractor You are directed to make the changes noted below in the subject contract for the dollar amount stated below including all labor, equipment, materials, overhead, and profit: Nature of the changes: 1. Item 48A Add 695 LF — Additional Wood Box Tunneling at the following stations: STA 105 +60 to STA 109 +20; STA 127 +35 to STA 128 +88; STA 129 +68 to STA 131 +30; plus additional 20 LF associated with crossing buried jersey traffic barriers ($310.00/LF) $215,450.00 Item #813 Add 50 LF — Additional boring of the 30 -inch pipe from STA 92 +87 to STA 93 +37 ($310.00/LF) $15,500.00 Total: X230.95 M The revised bonus payment schedule, below, shall not be subject to change for any reason, including Owner, Engineer or Contractor created delays or claims. Date of Certificate Of Substantial Completion After April 5,2013 March 30, 2013 — April 5, 2012 March 23, 2013 — March 29, 2013 March 16, 2013 — March 22, 2013 March 15, 2013 or earlier Total Bonus to be Paid to Contractor $0 $125,000 $250,000 $375,000 $500,000 These changes result in the following adjustment of contract price and contract time: Contract Price Prior to this Change Order $ 6,907,220.00 Net Increase Resulting from this Change Order $ 230.950.00 Current Contract Price Including this Change Order $ 7,138,170.00 Page 1 of 2 The above changes are approved: City ofSouthlake City By: Title: Mayor Date: 2012 Contract Time Prior to this Change April 15, 2013 (Days or Date) Net Increase Resulting from this Change Order 0 calendar days (Days) Current Contract Time Including this Change Order April 15, 2013 (Days or Date) The above changes are recommended: City ofSouthlake City By: Title: City Engineer Date: 2012 City ofSouthlake City By: Title: Proiect Manager Date: 2012 Cib� ofSouthlake City By: Title: Director Public Works Date: 1 2012 Circle C Construction Company Contractor By: Date: 2012 Page 2 of 2 PROJECT: TW King 30" Water Transmission Main and Meter PROJECT SOL09210 Station NUMBER: OWNER: City of Southlake CONTRACTOR: Circle C Construction ENGINEER: Freese and Nichols, Inc. CHANGE ORDER NO.: 5 DATE: 11 -26 -2012 Make the following additions, modifications or deletions to the work described in the Contract Documents: Replace existing plan sheets C -19 through C -31 with the attached revised plan sheets C -19 through C -31. The additional work that is identified below shall be paid for as indicated below: SECTION D: 30" Water Transmission Main Bid Items Description Quantity Unit Unit Cost Total Cost Item March 16, 2013 through March 22, 2013 $375,000 March 15, 2013 or earlier $500,000 Additional Wood Box Tunneling at the Add Bid Item following stations: STA 105 +60 to STA 109 +20; #8A STA 127 +35 to STA 128 +88; STA 129 +68 to STA 131 +30; plus additional 20 If associated with crossing buried jersey traffic barriers. 695 LF $310.00 $215,450.00 Add Bid Item #86 Additional boring of the 30" pipe from STA 92 +87 to 93 +37. 50 LF $310.00 $15,500.00 TOTAL ADDITIONAL COST: $230,950.00 The Early Substantial Completion Bonus Schedule, as referenced in the Notice for Bidders, shall be changed to the following: Date of Certificate of Substantial Completion Total Bonus to be Paid to Contractor After April 5, 2013 $0 March 30, 2013 through April 5, 2013 $125,000 March 23, 2013 through March 29, 2013 $250,000 March 16, 2013 through March 22, 2013 $375,000 March 15, 2013 or earlier $500,000 4055 International Plaza, Suite 200 • Fort Worth, Texas 76109 • 817 - 735.7300 • fax 817. 735.7491 The compensation agreed upon in this Change Order is full, complete and final payment for all costs the Contractor may incur as a result of or relating to this change whether said costs are known, unknown, foreseen or unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of this Change Order. RECOMMENDED BY APPROVED BY APPROVED BY Freese and Nichols, Inc. (CONTRACTOR) (OWNER) NAME f' DATE NAMI?. DATE NAME DATE