Item 4CInterlocal Agreement with the City of Keller for Change Order No. 4 for the Caylor Wholesale Meter Modification
Item 4C
Requested Action
Approve an Interlocal
Agreement with the
City of Keller for the Design and Construction Costs associated with the Caylor Wholesale Meter Modification Project
Project Location1300 N. Caylor Road, Fort Worth, Texas
Proposed Change Order No. 4
Siemens 36-inch Magnetic Flow Meter
Meets requirement of the City of Fort Worth
Removal and disposal of existing meter, pipes and fittings
Concrete adjustments for new meter
Installation with appurtenances for connection
SCADA system connection
Sodding and general clean up of construction site
Financial Consideration
The Caylor water supply line is designed to provide 29 million gallons per day (MGD) to the Cities of Southlake and Keller by gravity. Previous agreement between the Cities apportions
this flow with 22 MGD to Southlake and 7 MGD to Keller. The cost of this project will be apportioned by the same ratio.
Questions:Bob Price 817-748-8097