Loading...
Item 4ECITY OF SOUTHLAKE MEMORANDUM October 2, 2012 To: Shana Yelverton, City Manager From: Sharen Jackson, Director of Finance Timothy Slifka, Purchasing Manager Subject: Item 4E Approve the Purchase of Replacement Vehicle from Houston Freightliner in the amount of $74,589 Action Requested: Approve the purchase of replacement vehicle from Houston Freightliner for Public Work Streets department in the amount of $74,589. Background Information: Per the City's Vehicle Replacement Plan /Policy the requested vehicles are scheduled for replacement. State of Texas and City of Southlake bidding requirements have been met by utilizing HGAC Cooperative Purchasing. Financial Considerations: The request will be funded through the FY 2013 City's vehicle replacement fund budget. Strategic Link: C1 — Achieve the highest standards of safety and security. B2 — Collaborate with select partners to implement service solutions. F2 — Invest to provide and maintain high quality public assets. Citizen Input/ Board Review: None Legal Review: None Alternatives: Deny and retain the old vehicle. This will lead to increased vehicle maintenance cost. Supporting Documents: HGAC contract pricing worksheet. Staff Recommendation: Approve the purchase of this vehicle from Houston Freightliner.. CONTRACT PRICING WORKSHEET Contract i HTII -12 For Standard. Equipment Purchases No.: Date € 8/14/2 Prepared: This FFonn must be prepared by Contractor, and provided to End User to attach to Pttre/jose Order, with copy to .lam GAG 77ie S -GAC arhnitdstratdve jee shall be calculated and shown as a separate line item. Please type or print legibly. Buying :City ofSoudilake Agency: Contractor: " Freightliner/Sterling Contact Glenn Charbula Person: Prepared =Michael McCarth Sy; Phone: :817 -748 -8312 Phone: :713 -580 -8122 Fox: Fax: :713- 672 -9449 Email: Email: Mike.McCarthyC�STF2Ho Product Code: Deseripuon: ? 2013 Freightliner 108 SD 70 A. Product Item Base Unit Price Per Contractor's H -GAC Contract: $sa,93a B. Published Options - Itemize below - Attach additional sheets) if necessary - Include Option Code in description if applicable. (Note: Published Options are options which were submitted and priced in Contractor's bid.) Description Cost Description I Cost Wabco 1200 ss Air Dryer 215 Air Driver Seat 175 V ehicle interface and PDM located BOC 621 Air Cab Mounts 132 Al lison 3500 RDS Transmission 5980 Adjustable Steering Column 376 0 Single Air Hom 122 Stationary Grille 345 24" Front Frame Extension 173 189" Wheelbase 656 AM/FM Radio 164 Front Tow Hooks 52 Subtotal From Additional Sbeet(s): Air Conditioner 7261 1 Subtotal B. 9737 C. Unpublished Options - Itemize below / attach. additional sheets) if necessary. ( Note; Unpublished options are items which were not submitted and priced in Contractor's. bid.) Description Cost Description Cost 1310 Adnptor for Front Mount PTO Provision 4364 UNIT # 826 0 0 Subtotal From Additional Sheet(s): Subtotal C: l 4364 Check: Total cost of Unpublished Options (C) cannot exceed 25 % of the total of the Base Unit Price plus Published Options (A +$). For this transaction the percentage is: 0% D. Other Cost Items Not Itemized Above (cg. Installation, Freight, Delivery, Etc.) Description Cost Description Cost Freight 800 One Year Towing Warranty 150 Subtotal D: Z 95 E. Total Cost Before Any Applicable Trade -In I Other Allowances /Discounts (A +B +C +D) 73989 QuantityOrderedd X Subtotal ofA +B +C +D: 73989 Subtotal E: 73989 F. H -GAC Fee Calculation (From Current Fee Tables) Subtotal F i 60 G. Trade -Ins 1 Other Allowances 1 Special Discounts Description Cost Description Cost Subtotal G: ", 0 Delivery Date:: H. Total Purchase Price (E+F +G): 7x589