Item 6D
Site Plan for Alliance Office Systems
ZA12-054
ZA12-054
Applicant: AOS Investments Group
Request: Site Plan for the purpose of constructing an approximately 5950 square foot single story office building.
Location: 469 Cherry Lane
Aerial View
View looking south
View looking north
Site Data Summary
site plan
North & south BUILDING ELEVATIONS
West & east BUILDING ELEVATIONS
Landscape plan
Variance Request
Existing Tree Cover Area is approximately 10%
Required Tree Preservation: 70%
Proposed Tree Preservation: 34%
Variance Request
Residential Adjacency Setback from Cherry Lane: 40-feet
Proposed Setback from Cherry Lane: 30-feet
Sidewalk Escrow
P&Z ACTION
August 23, 2012; Approved (7-0) subject to Staff Report #3, dated July 5, 2012; granting the variance for 34% existing tree canopy, noting that any canopy tree cover will require 50%
at 4-inch caliper and none less than 2-inch caliper; granting the variance for 30-foot front yard setback; accepting the funds for future sidewalk construction be placed in escrow; subject
to the addition of door and walkway on west elevation for a more residential look facing Cherry Lane; and, noting the applicant will connect to sewer once it becomes available through
the development of the adjacent property to the east.
Item 4C
Questions?
View looking east