Loading...
Item 6D Site Plan for Alliance Office Systems ZA12-054 ZA12-054 Applicant: AOS Investments Group Request: Site Plan for the purpose of constructing an approximately 5950 square foot single story office building. Location: 469 Cherry Lane Aerial View View looking south View looking north Site Data Summary site plan North & south BUILDING ELEVATIONS West & east BUILDING ELEVATIONS Landscape plan Variance Request Existing Tree Cover Area is approximately 10% Required Tree Preservation: 70% Proposed Tree Preservation: 34% Variance Request Residential Adjacency Setback from Cherry Lane: 40-feet Proposed Setback from Cherry Lane: 30-feet Sidewalk Escrow P&Z ACTION August 23, 2012; Approved (7-0) subject to Staff Report #3, dated July 5, 2012; granting the variance for 34% existing tree canopy, noting that any canopy tree cover will require 50% at 4-inch caliper and none less than 2-inch caliper; granting the variance for 30-foot front yard setback; accepting the funds for future sidewalk construction be placed in escrow; subject to the addition of door and walkway on west elevation for a more residential look facing Cherry Lane; and, noting the applicant will connect to sewer once it becomes available through the development of the adjacent property to the east. Item 4C Questions? View looking east