Loading...
Item 4C FM1938 Phase 2 Landscaping Design Item 4C Requested Action Approve Amendment No. 1 to the Engineering Agreement with Transystems, Inc. for FM1938 Phase 2 landscaping design in the amount of $67,833.42 Amendment No. 1 – Revised Scope FM 1938 Project FM 1938 Phase 1 Phase 2 Conceptual Landscape Design Conceptual Landscape Design Conceptual Landscape Design Conceptual Landscape Design Conceptual Landscape Design Conceptual Landscape Design TranSystems Amendment FUNDING Available Capital Improvement Program Budget for the FM1938 Phase 2 C2 Provide travel convenience within City and region Questions: Bob Price (817) 748-8097 Preliminary Cost Estimates Construction Cost = $1,809,050 Landscape $1,350,550 Irrigation $ 458,500 Annual Maintenance Cost = $75,000 Urban Design Plan Urban Design Plan Urban Design Plan Approve PSA with TranSystems Corporation for FM1938 Phase 2 FM1938 Phase 2 Construction Anticipated construction cost projection is $20,928,948 Engineering fee is approximately 7.2% of the construction cost The fee for design includes both Basic Services and Special Services Approve PSA with TranSystems Corporation for FM1938 Phase 2 Funding for FM1938 Engineering Design Engineering design is included in the General Fund CIP - successive CIP budgets from 2001 to present Southlake’s net obligation under this contract – approx. $790,000 with participation by Tarrant County and the City of Keller