2012-03-26 Meeting Report (Bicentennial Retail Plaza)SPIN MEEETING REPPORT
CASE NOO.
Z12-015
AA
PROJECCT NAME:
Biccentennial RRetail Plaza
SPIN DISSTRICT:
SIN # 7
PP
MEETINGG DATE:
Maarch 26, 2012; 6:00 PM
MEETINGG LOCATIOON:
140 Main Stret, Southlake, TX
00ee
Traaining Roomms 3A – 3B
TOTALAATTENDANCE:
Four ()
44
SSPIN REPREESENTATIVVE PRESENTT:
Vic Awtryy # 7
AAPPLICANT((S) PRESENNTING:
Lis Swift, GS Architects
aaOO
SSTAFF PRESSENT:
Richaard Schell, PPlanner II
STAFFCCONTACT:
Richard Scell, PlanneII, (817)74-8602;rschell@ci.soutlake.tx.us
hhr88hh
EXECUTTIVE SUMMAARY
Propertyy Situation
TThe property is located at 410 W. Southlake Blvdd.
pment Details
Develo
his propert was rezoned to S-P-1 Detailed ite Plan Ditrict in 200 (ZA05-14) for
TTyySSss6666
thhe approximmately 12,5550 square ffoot existingg building. TThe applicaant is requeesting
approval of zoning change and ite plan to revise the xisting S--1 site pla and
aasseePPnn
elevations to allow three covered paatios at the rrear of the bbuilding. Thee patios wouuld be
coonstructedoover existingg concrete aareas, so theere would bbe no increaase in imperrvious
cverage an no changs to the existing drainage. Only th westernmst covered patio
ooddeeeeoo
ould be costructed at this time. Approval of te other tw covered ptios would allow
wwnnhhooaa
fleexibility for oother tenantss to add the covered paatios in the fuuture. No chhanges to paarking
or landscapig are propsed, howeer, potted lants may e added i the patio reas.
nnoovvppbbnnaa
o other changes to the S-P-1 regultions or uss are propsed.
NNaaeeoo
QUESTIOONS / CONCCERNS
ow much aea will the atios cove
HHrrppr??
The covered patioo structureswill be approoximately 255’ x 40’ eachh.
o
oes outdoo seating alrady exist?
DDrree
Yes.
o
SPIN Meeting Reports aare general obbservations of SPIN Meetinggs by City stafff and SPIN RRepresentativess. The
report is neeither verbatimm nor official meeting minutess; rather it servves to inform eelected and apppointed officials, City
staff, and the public of thee issues and questions raisedd by residents and the generaal responses mmade. Responsses as
summarizeed in this repoort should not be taken as guarantees byy the applicannt. Interested parties are sttrongly
encouraged to follow the case through tthe Planning annd Zoning Commmission and fiinal action by CCity Council.