Item 6G and 6H Forest Park Medical Center at Southlake Phase 1 Items 6G and 6H DISCUSSION Owner/ Applicant: Southlake Land Holdings, L.P. Request: Approval of a site plan for Forest Park Medical Center at Southlake Phase I to revise the approved site plan to add a four level parking structure and to relocate the emergency room entrance and the facilities service yard and a masonry variance for construction office buildings. Location: 335 E State Hwy. 114 and 440 E Highland Street ZA11-058 (Items 6G & 6H) DISCUSSION DISCUSSION DISCUSSION DISCUSSION Approved concept plan july 17, 2007 DISCUSSION Rendering approved with concept plan Hospital Phase I Parking Garage Medical Office Building 1 DISCUSSION Rendering approved with concept plan Hospital Phase I Medical Office Building 1 DISCUSSION Rendering approved with concept plan Hospital Phase I Parking Garage DISCUSSION Phase I Rendering approved with concept plan DISCUSSION concept plan APPROVED july 17, 2007 Driveway Spacing: Required = 250 ft Provided = 194 ft Driveway Spacing: Required = 250 ft Provided = 146 ft Driveway Stacking: Required = 150 ft Provided = 43 ft Driveway Stacking: Required = 150 ft Provided = 35 ft Driveway Stacking: Required = 150 ft Provided = 23 ft * Requesting that parking garages be excluded from the interior landscape calculations. DISCUSSION approved phase I concept plan DISCUSSION approved site plan option “a” Emergency Entrance Water Fountain Mechanical Yard DISCUSSION approved site plan option “B” Emergency Entrance Mechanical Yard Water Fountain DISCUSSION Proposed site plan at p&z nov. 17, 2011 Relocated Emergency Entrance Relocated Mechanical Yard Water Fountain DISCUSSION Proposed site plan Relocated Emergency Entrance Relocated Mechanical Yard Relocated Fountain DISCUSSION NORTHWEST ELEVATION PROPOSED APPROVED DISCUSSION View from e. highland st. APPROVED PROPOSED DISCUSSION north elevation APPROVED PROPOSED AT P&Z 11/17/2011 LABELS REVISED TO ALLOW STUCCO OR PRECAST CONCRETE PANELS WITH STUCCO APPEARANCE DISCUSSION north elevation APPROVED PROPOSED AT P&Z 11/17/2011 (OPTION A) LABELS REVISED TO ALLOW STUCCO OR PRECAST CONCRETE PANELS WITH STUCCO APPEARANCE DISCUSSION SUBMITTED 12/06/2011 (OPTION B) north elevation DISCUSSION west elevation APPROVED DISCUSSION PROPOSED AT P&Z 11/17/2011 west elevation DISCUSSION PROPOSED AT P&Z 11/17/2011 (OPTION A) SUBMITTED 12/06/2011 (OPTION B) West elevation DISCUSSION south elevation APPROVED DISCUSSION PROPOSED AT P&Z 11/17/2011 south elevation DISCUSSION PROPOSED AT P&Z 11/17/2011 (OPTION A) SUBMITTED 12/06/2011 (OPTION B) South elevation DISCUSSION east elevation APPROVED OPTION “A” PROPOSED DISCUSSION east elevation APPROVED OPTION “B” PROPOSED DISCUSSION east elevation DISCUSSION PROPOSED AT P&Z 11/17/2011 (OPTION A) SUBMITTED 12/06/2011 (OPTION B) East elevation DISCUSSION GARAGE ELEVATIONS DISCUSSION GARAGE CONNECTOR north elevation DISCUSSION approved tree conservation plan DISCUSSION tree conservation plan at p&z nov. 17, 2011 DISCUSSION PROPOSED tree conservation plan DISCUSSION approved overall landscape plan DISCUSSION PROPOSED overall landscape plan at p&z Nov. 17, 2011 DISCUSSION PROPOSED overall landscape plan DISCUSSION Highland st. buffer with approved concept plan DISCUSSION Sh 114 buffer with approved concept plan DISCUSSION Site plan for construction offices DISCUSSION Zoomed in Site plan for construction offices Applicant is requesting three (3) construction office buildings totaling approximately 6,070 square feet for three (3) years DISCUSSION Construction office floor plans 24’ x 56’ 36’ x 56’ 48’ x 56’ DISCUSSION Photo example of construction offices Item 6H - Variance Requested to Masonry Ordinance to allow HardiePlank siding DISCUSSION Rendering Concept Plan Site Plan Elevations Tree Conservation Plan Landscape Plan Construction Office Buildings Applicant’s Presentation Discussion DISCUSSION Forest Park Medical Center at Southlake DISCUSSION Developer for all Forest Park Hospitals Co-developing Southlake DISCUSSION Design and Construction Team Architect of Record Master Planning & Exterior General Contractor Civil Engineer Landscape Architect DISCUSSION Zoning Hospital 358 beds 460,000 sf Campus 30 acres 970,000 sf 6 medical office buildings 2 parking garages Max height of 6 stories (90 feet) DISCUSSION Proposed Perspective DISCUSSION Proposed Expansion DISCUSSION 10 DISCUSSION 12 DISCUSSION 20 DISCUSSION 14 DISCUSSION 57 DISCUSSION 11 DISCUSSION 16 DISCUSSION 13 DISCUSSION 19 DISCUSSION 17 DISCUSSION 18 DISCUSSION 64 LEED Design DISCUSSION 10 DISCUSSION Comparison DISCUSSION Parking Facing Highland DISCUSSION 68 Enhancements Relocate: ER / Delivery Bay / Fountain & Mechanical Yard Parking: Reduce Surface Parking Eliminate Parking Facing Highland Parking Garage More Landscaping Landscaping Extend Highland Buffer LEED DISCUSSION Consistency Hospital and Medical Office Building Building Materials: Exterior Masonry, Glass, Rooftop Screening Construction: 114 Access, Screening Fence Landscaping: Highland and 114 Buffers, Berms, Plant Materials, Tree Preservation Building Height DISCUSSION Forest Park Medical Center at Southlake DISCUSSION Item 4C Questions? DISCUSSION 72 DISCUSSION 73 DISCUSSION Approved lighting plan Proposed lighting plan Approved enlarged landscape plan Proposed enlarged landscape plan Approved enlarged landscape plan Approved landscape plan option “b” Proposed enlarged landscape plan Approved enlarged landscape plan Proposed enlarged landscape plan