Loading...
Item 4G Approve Amendment No. 2 to the Engineering Agreement with Nathan D. Maier Consulting Engineers Inc. for White Chapel Boulevard from Highland Street to SH 114 in the amount of $173,827 Item 4G Requested Action Approve Amendment No. 2 to the Engineering Agreement with Nathan D. Maier Consulting Engineers Inc. for White Chapel Boulevard from Highland Street to SH 114 in the amount of $173,827 Approve Amendment No. 2 for White Chapel Boulevard from Highland to SH 114 Background: Original contract with Nathan D. Maier Engineers Inc. October, 2008 Approved by the City Council in the amount of $264,859.00 Amendment No. 1 January, 2010 Approved by the City Manager in the amount of $12,285.00 Revise the horizontal alignment of the intersection of Highland and White Chapel to shift the centerline to the west White Chapel Boulevard Improvements Level of Service Analysis Approve Amendment No. 2 for White Chapel Boulevard from Highland to SH 114 Amendment No. 2 – Revised Scope Area to be re-designed Approve Amendment No. 2 for White Chapel Boulevard from Highland to SH 114 Amendment No. 2 - Revised Scope Additional survey along White Chapel Boulevard and Highland street Landscaping and irrigation design for roundabout Subsurface utility engineering Utility design Drainage Design Construction plans, contract documents, bidding and construction administration Approve Amendment No. 2 for White Chapel Boulevard from Highland to SH 114 Roadway Design $ 79,735 Survey Services 22,164 Drainage Design 7,254 Utility Design 4,654 Subsurface Utility Engineering 39,450 Landscaping and Irrigation Design 12,500 Construction Administration 2,640 Reimbursable Expenses 2,000 Right of way Exhibits 3,430  Total for Amendment #2 $173,827 Financial Consideration Original Contract $ 264,859 Amendment #1 12,285 Amendment #2 173,827  Total Amended Contract $450,971 Funding is available Location Map C2 Provide travel convenience within City and region Questions: Bob Price (817) 748-8097