Loading...
Item 9B Approve purchase of a waterline easement for TW King 30-inch water line from property located on the south side of SH 114 from proposed FM 1938 to Solana Boulevard in the amount of $270,900 Item 9B Requested Action Approve purchase of a waterline easement for TW King 30-inch water line from property located on the south side of SH 114 from proposed FM 1938 to Solana Boulevard in the amount of $270,900 Located along the south frontage road of SH 114 between Precinct Line Road (south of SH 114) and TW King Road (north of SH 114) 2.646 acre (115,250 sf) permanent waterline easement along the frontage road of SH 114 1.830 acre (79,716 sf) temporary construction easement adjacent to the easement being acquired Required for the installation and future maintenance of the 30-inch water transmission main Approve the purchase of easements for the 30-inch water transmission main Water Line Easement Location Map State Highway 114 Permanent Waterline Easement Exhibit Temporary Construction Easement Exhibit Proposed Settlement (based on appraisal) Permanent Waterline Easement (115,250 sf) $216,700.00 Temporary Construction Easement (79,716 sf) 54,200.00 Total $270,900.00 Approve the purchase of easements for the 30-inch Water Transmission Main Financial Considerations Funding for the easement purchase is available in the FY 2006-2010 capital improvement program budgets C2 Provide travel convenience within City and region Questions: Gordon Mayer (817) 748-8089