Item 4I13 SOUTHLAKE
CITY OF
Department of Planning & Development Services
STAFF REPORT
September 27, 2011
CASE NO: ZA11 -041
PROJECT: Preliminary Plat for Lots 1 & 2, Block 1, Tower Plaza Addition
EXECUTIVE
SUMMARY: On behalf of Visions Southwest Silverlake, LLC, Bannister Engineering, LLC is
requesting approval of a preliminary plat for Lots 1 & 2, Block 1, Tower Plaza
Addition on 7.669 acres located at 821, 829 and 835 E. Southlake Boulevard.
SPIN # 9.
REQUEST DETAILS: The applicant is requesting approval of a preliminary plat for Lots 1 & 2, Block 1,
Tower Plaza Addition. A zoning change and site plan (ZA11 -054) for Tower Plaza
that includes a three -story, 64,800 square foot medical center /hospital on the
southern portion of the property and one two -story, 40,968 square foot office
building was approved by City Council on December 7, 2010. The proposed
preliminary plat is consistent with the approved site plan.
ACTION NEEDED: Consider approval of a preliminary plat
ATTACHMENTS: (A)
(B)
(C)
(D)
(E)
(F)
Background Information
Vicinity Map
Plans and Support Information - Link to PowerPoint Presentation
Revised Plat Review Summary No. 2, dated September 23, 2011
Surrounding Property Owners Map and Responses
Full Size Plans (for Commission and Council Members Only)
STAFF CONTACT: Ken Baker
Richard Schell
(817) 748 -8067
(817) 748 -8602
Case No.
ZA 11 -041
BACKGROUND INFORMATION
OWNER: Visions Southwest Silverlake, LLC
APPLICANT: Bannister Engineering, LLC
PROPERTY SITUATION: 821, 829 and 835 E. Southlake Boulevard located south of E. Southlake
Blvd. and west of Carroll Ave.
LEGAL DESCRIPTION: Tracts 3B, 31301, and 3D01, O.W. Knight Survey, Abstract No. 899
LAND USE CATEGORY: Office Commercial
C�l�J:7:7������7�llf•C 'ail(i�Z 11C�'[• %!"M emi'iC•Ii
HISTORY: The structures on the property were built around 1960 (Source: TAD)
The "C -3" General Commercial Zoning District designation was assigned
to a portion of the properties with the adoption of Zoning Ordinance 480 in
1989.
A zoning change & site plan under Planning Case ZA07 -124 and a
Preliminary Plat under Planning Case ZA07 -125 were approved February
19, 2008 by City Council to develop approximately 90,000 square feet of
professional office space and change the Zoning from "C -3" General
Commercial Zoning District to "S -P -1" Detailed Site Plan District.
A zoning change and site plan (ZA09 -059) to change the most northeast
building (Building 3) to a Nursing College use and building and the two
most southern office buildings (Previously Buildings 5 & 6, now Building 5)
to a 90 -bed personal care /assisted living facility was withdrawn by the
applicant.
A zoning change and site plan (ZA10 -041) that kept the layout and
general /medical office use of the two northernmost buildings on the
approved Invitation Park plan, but that proposed a three -story, 64,800
square foot medical center /hospital in place of the five other buildings,
was denied by City Council on August 17, 2010.
A zoning change and site plan (ZA11 -054) for Tower Plaza that includes a
three -story, 64,800 square foot medical center /hospital on the southern
portion of the property and one two -story, 40,968 square foot office
building along E. Southlake Blvd. was approved December 7, 2010.
TRANSPORTATION
ASSESSMENT: Master Thoroughfare Plan
The Master Thoroughfare Plan recommends Southlake Boulevard (FM
1709) to have 130 feet of right of way. Adequate right of way exists for
this road; In addition, the applicant is dedicating twelve feet along FM
1709 for TxDOT right of way and construction of a deceleration lane. The
Master Thoroughfare Plan also recommends Zena Rucker Road at the
southern boundary of this property. Zena Rucker Road is proposed to be
Case No. Attachment A
ZA11 -041 Page 1
a 2 -lane undivided collector with 60' R.O.W.
The portions of Zena Rucker Road and the street running north -south that
is shown as "Future Street" on the plat will be completed with
development of Lot 1. The roundabout at the intersection of Zena Rucker
Road and the north -south street is to be constructed by others with
development of the properties to the east and south.
PATHWAYS MASTER
PLAN: A minimum 8' wide multi -use trail is required along East Southlake
Boulevard and 5' sidewalks are required along all adjacent public streets.
WATER & SEWER: A 12 -inch water line exists along the north side of East Southlake
Boulevard. A 6 -inch sanitary sewer line also exists along the north side of
E. Southlake Boulevard.
SPIN MEETING: A SPIN meeting for the Tower Plaza zoning change and site plan was held
on Monday, October 11, 2010 at 8:OOPM. Due to the entitled zoning, no
SPIN meeting was held for this case.
PLANNING AND ZONING
COMMISSION ACTION: Approved (6 -0) subject to Plat Review Summary No. 2, dated September
16, 2011.
STAFF COMMENTS: Attached is Revised Plat Review Summary No. 2, dated September 23,
2011.
Case No. Attachment A
ZA11 -041 Page 2
Case No. Attachment B
ZA11 -041 Page 1
Vicinity Map
Lots 1 & 2, Block 1, Tower Plaza
Addition
MALTON LN
FEDERAL WAY
Z
N
w w
Y J N L=
O
U
Z_ K
J
U PROSPECT ST
Z
ROSS LN
MAIN ST
m
LAD CT
❑
Z
O
Q
O
EAST SOUTHLAKE BLVD
2 EN
q R � O kER
RD
LA S1
YM
2
�
F
�
z
I I
r i L
l I
I'
I -•
w u
0 550
1,100
s
Case No. Attachment B
ZA11 -041 Page 1
PROPOSED PRELIMINARY PLAT
l SF-2DA V Lot 2 Lot LR, Block 1 ° a'�
1 Density Res. }, W.W. Hdll MD. 695 Addltion FICDtleZ lWdl[brl °
^' d �' W.W. Hall No. 695 Addl'
°
Cabinet A, Slide 9457 CIF it DZOSZS1168
Cabinet A, 5Ide, 454!
P. RT.C.T. P.R.T.C.T. j 1321
° P.R.T.C-T.
> > Zoning - SP2
2
Zoning - SP1 Zoning - SPl
LAD = Office Lnmmerc
LUD =Office Commerdal WD =Office Commcrcial
En
4
nw �m3,es�rerine F.M. Highway 1709 wm,w.rol .A _
- —.. —
(SOUlfiake HculevaVd) AYI- �vhExryer�ra9§
130' Public Right-of f Way
save rw QU.uuornenc q
3'58 "W 632.81'
PaMdB9]Imnq N&3°53'68 23958' !!Z
-W T.
z 4 Lot 1
� V V
William W. RLdcer y Ylslon Soutli Siverlake, LLC �. d RCP SoWhlake Boulevard 47, LTD
Zena Rucker �
z I CCF # D207135294 '
CCF # D203471724
CCF i! 0201146158 D.R.T.C.T. + 1 l 4
D.R.T.C.T.
Z onin g
I s i WD = Of11ce CommendaI � } `
' 16'�IRF
Zoning - SP2
9
WD = Camm(rclal :
W D = 0Ii C ommcroal
f
T� IN Al
l�€ .�z
I I I uon«�errd+ ®.ten 1� LLlb
�oia -1
in
J ' i
5�6'IPF N
33,r mgr 89°16'11'E
lai l 0
1
s ea lair w 2ena Rucker RDad :~
0 v" Puhlk: Right -oi
60' Public RJghtaf -Way _� '� ia3 S
Dedkared by Separate rn�'umert IRS, ry as°lall 141Il3'
�5
lam
Wlll W. and Ze39 Rucker II15
�
Fem lly Trust
�+
CCF 8 DMO46160 �
D.R.T.C,T. F Lori Z
Zoning -AC
IC I
es
LUD = Medium Density Res. w
b Yrsion 5 st ..
ke, Li l
5i lvedake, LLC
8 CCF N D207135294
= D.R.T.c,r.
vk Zoning -AG
LUD = Med. Denslty Res. i
5W
516• IW a
I
2.75 !
8 W ' !
1
William W. Rucker
Zeno Rucker
CCF A D205D*157 Zoning - AG
D.R.T.C.T, LUD = Medium Density Res,
Zoning -AG
LUD - Medium Density Res
Case No. Attachment C
ZA11 -041 Page 1
REVISED PLAT REVIEW SUMMARY
Case No.: ZA11 -041 Review No.: Two Date of Review: 09/23/11
Project Name: Preliminary Plat — Lots 1 & 2, Block 1, Tower Plaza Addition
APPLICANT: Nels Nelson ENGINEER: Jeff Linder
Vision Southwest Silverlake, LLC
215 W. College St.
Grapevine, TX 76051
Phone: (817) 410 -5109
Bannister Engineering, LLC
714 Hunters Row Ct, Ste. 104
Mansfield, TX 76063
Phone: (817) 842 -2094
- E-Mail: N/A E -Mail: Jeff @bannister - engineering.com
CITY STAFF HAS REVIEWED THE ABOVE REFERENCED PROJECT RECEIVED BY THE CITY ON
09/06/11 AND WE OFFER THE FOLLOWING STIPULATIONS. THESE STIPULATIONS ARE HEREBY
MADE CONDITIONS OF PLAT APPROVAL UNLESS SPECIFICALLY AMENDED BY THE CITY
COUNCIL. IF YOU HAVE ANY QUESTIONS OR NEED FURTHER CLARIFICATION, PLEASE
CONTACT DENNIS KILLOUGH AT (817) 748 -8072.
1. Verify that the acreage shown for the plat, lots and right of way are correct.
2. All lots must comply with the underlying zoning district regulations. An appropriate change of
zoning on the proposed Lot 2 must be approved prior to approval of a final plat for Lot 2. The lot
as shown does not comply with the ten acre minimum lot area that is required in the "AG"
Agricultural zoning district.
3. The following changes are needed with regard to easements:
a. Provide the recorded instrument information for the public right of way that is to be
dedicated by separate instrument for the future street and the portion of Zena Rucker
Rd that is on adjacent property.
b. The ingress /egress easement shown to be abandoned must be abandoned by
separate instrument and not by this plat. Please label the instrument number of the
filed document abandoning the easement.
C. A copy of an executed easement by separate instrument will be required for the
outfall of the underground storm water detention tank prior to a preconstruction
meeting.
d. Provide easements for water, sewer and /or drainage in compliance with approved
construction plans.
PUBLIC WORKS REVIEW COMMENTS
Alejandra Ayala, Civil Engineer
(817) 748 -8274
aayala @ci.southlake.tx.us
GENERAL COMMENTS:
1. A ROW permit shall be obtained from the Public Works Operations Department for
connections with the City's sewer, water or storm drain inlets. Contact Public Works
Operations at (817) 748 -8082.
Case No. Attachment D
ZA11 -041 Page 1
EASEMENTS:
1. An easement will be required at the outfall of the underground storm water detention tank.
Easements shall be 15' minimum and located on one lot — not centered on the property
line.
2. A 20' easement is required if both storm sewer and sanitary sewer will be located within
the easement.
WATER COMMENTS:
1. The minimum size for water lines is 8 ".
2. A permit from the Public Works Department will be needed to tie into the existing 8" water
line. Contact Public Works Operations at (817) 748 -8082.
SANITARY SEWER COMMENTS:
1. The minimum size for sanitary sewer lines is 8 ". All sanitary service lines must connect to
a public sanitary system line that is built to City standards.
2. A TxDOT permit will be need for the construction of the 8" Sanitary Sewer under FM1709.
DRAINAGE COMMENTS:
1. The size of the proposed storm sewer will require some easements outside the ROW.
The storm sewer must be installed outside the edge of pavement. Ordinance #605
defines the easement requirements for storm sewer.
a. 60" RCP requires a 25' easement
b. 72" RCP requires a 30' easement
c. 84" RCP requires a 30' easement
2. Verify that the size, shape, and /or location of the detention tank, as depicted on the site
plan, will be adequate to meet the detention requirements. Any changes to the size,
shape, and /or location of the proposed pond(s) may require a revision to the site plan and
may need to be approved by the Planning and Zoning Commission and the City Council.
3. This property drains into a Critical Drainage Structure No. 23 and requires a fee to be paid
prior to beginning construction.
4. The discharge of post development runoff must have no adverse impact on downstream
properties and meet the provisions of Ordinance # 605.
PUBLIC WORKS INFORMATIONAL COMMENTS:
1. Submit 4 copies of the civil construction plans (22" X 34" full size sheets) and a completed
Construction Plan Checklist as part of the first submittal for review directly to the Public
Works Administration Department. The plans shall conform to the most recent
construction plan checklist, standard details and general notes which are located on the
City's website. http:// www. citvofsouthlake. com/ PublicWorks /engineeringdesign.asp
2. A Developer's Agreement may be required for this development and may need to be
approved by the City Council prior to any construction of public infrastructure.
Construction plans for these improvements must be acceptable to Public Works prior to
placing the Developer's Agreement on the City Council agenda for consideration.
3. Any hazardous waste being discharged must be pretreated Ordinance No. 836.
The following should be informational comments only
A final plat for Lot 2, Block 1 cannot be filed with a zoning designation of "AG" Agricultural District
on the lot since it doesn't meet the minimum ten acre lot area that is required in the "AG"
development regulations (Zoning Ordinance No. 480, Section 9.5(f) as amended).
Case No. Attachment D
ZA11 -041 Page 2
A "Certificate of Taxes Paid" indicating that there are no delinquent taxes owed on the subject
property from each taxing authority must be provided to the City prior to filing this plat in the
County records. A copy of this information may be obtained from the Tarrant county Tax
Assessor /Collector's Office located at 100 E. Weatherford St. in Ft. Worth (across from the old
red courthouse). There is a service charge of $10 per account for this certificate. For more
information contact the Assessor /Collector's office at 817 - 884 -1186.
We recommend this plat not be filed until the construction plans have been substantially
approved. This will ensure adequate easements and finish floor elevations. Minimum finish floor
elevations may be required on the following lots pending review of construction plans: Block
Lots
Please submit a revised blueline "check print" prior to submitting blackline mylars with original
signatures.
Original signatures and seals will be required on two blackline mylars prior to filing the plat.
Mylars will not be accepted if any erasures or original ink, other than signatures or seals, appear
on the plat.
A Developers Agreement is required prior to construction of any public infrastructure. The
Developer's Agreement for this addition should consider streets, drainage, park dedication
requirements and fees, off -site sewer extensions, off -site drainage and utility easements and
impact fees.
** Denotes Informational Comment
Case No. Attachment D
ZA11 -041 Page 3
SURROUNDING PROPERTY OWNERS
Lots 1 & 2, Block 1, Tower Plaza Addition
CT
13
10
12
SPO #
Owner a
Zoning
and Use = M
Acreage
Response
1
Medium Density Residential,
NR
Foxborough Hoa Inc
SF20A
100 -Year Flood Plain
1.31
2.
Kiani, Hamid Etux Rashin
SF20A
Medium Density Residential
0.64
NR
3
Office Commercial, Medium
NR
East Southlake #1 Ltd
SP1
Density Residential
1.87
4
Office Commercial, Medium
NR
East Southlake #2 Ltd
SP1
Density Residential
2.39
5
Office Commercial, Medium
NR
Mendez Ltd
AG
Density Residential
5.41
6
Medium Density Residential,
NR
Rucker, Zena Sullivan Tr
AG
100 -Year Flood Plain
50.45
7.
Vision SW Silverlake Llc
SP1
Office Commercial
0.55
NR
8.
Vision SW Silverlake Llc
SP1
Office Commercial
2.82
NR
9.
Rucker, Zena Sullivan
AG
Office Commercial
6.70
NR
10.
Office Commercial, Medium
NR
Vision SW Silverlake Llc
SP1
Density Residential
4.22
11.
Rucker, Zena Sullivan Tr
AG
Medium Density Residential
4.24
NR
Case No. Attachment E
ZA11 -041 Page 1
12.
Rcp Southlake Blvd #2, Ltd
AG
Medium Density Residential
4.81
F
13.
Office Commercial, Medium
F
Rcp Southlake Blvd #2, Ltd
SP2
Density Residential
16.34
Responses: F: In Favor O: Opposed To U: Undecided NR: No Response
Notices Sent: Thirteen (13)
Responses Received: One (1) In Favor - Attached
Case No. Attachment E
ZA11 -041 Page 2
SEP -20 -2011 TUE 01 :31 PH FAX N0, P. 01
ZA11 441
September 22, 20'11— 6 :30 PM
Rep.Southlake Blvd e2, Lid
8333 Douglas Ave Ste 110
Dailas Tx, 757.25
A 599 4D01
PLEASE P ROVI DE COMPLETED FORMS VIA MAIL, FAX. OR HAND DELIVERY
BEFORE THE START OF THE $CHEatlLlkD PUBLIC HEARING.
Being the owner(s) Of the prOPerty so noted above, are hereby
in favor Opposed to undecided abut
(circle or underline one)
the proposed Preliminary Plat referenced above,
Space for comments regarding your position:
. s r
Signature:
Date:
Date:
- Additional
Notification Response Form
Printed Name(s): 6/
Mu$1 he property owner (s) whose name {s) printed at lnp, Otherwise ct nlact {he Planning 09. P61rC�Bnt, One dam► per property.
Phone Number (optional):
Case No. Attachment E