Item 4F, approve a contract with weatherproofing Technologies.
REQUESTED ACTION
Approve contract with
Weatherproofing
Technologies for phase 2
waterproofing the exterior
of Town Hall in the amount
of $107,089.92
Approve contract with Weatherproofing Technologies for phase 2 waterproofing the
exterior of Town Hall in the amount of $107,089.92
VA
Town Hall Weatherproofing
Background:
—Town Hall constructed in 1999
• Refurbished hand rails last fall
• Reset damaged steps late winter
—Weatherproofing South Elevation Ph. 1
• Reseal all windows
• Restore cracked grout and mortar
• Seal masonry surfaces
• Re -grout north & south granite steps
Since the construction of the Town Hall building very little maintenance to the
exterior of the building has been required. During fiscal year 2011 all the hand rails
around the building were refurbished and painted. The first phase of the
weatherproofing addressed the south building elevation and the granite stairs on the
north side south sides of the building. All the original sealant was removed and
replaced, as well as any cracked mortar, then the entire surface was cleaned and
resealed. This phase of the project will address the north surface of the building.
3
Before and After
These pictures illustrate the condition of the old materials and the new sealant
material. The products available today are superior to those used in the original
construction and should withstand exposure to the elements and provide greater
flexibility and resistance to thermal expansion. The new products are expected to
have a service life in excess of 15 years.
M
The slide shows the north elevation of the Town Hall building to be address in phase
2. All the architectural detail on this side of the building contributes to the
complexity of this project.
5
Town Hall Weatherproofing
Phase 2 North Elevation
Other Considerations:
—Scaffolding and Lift required
— Completion expected by Nov. 18, 2011
Financial Consideration:
— Funding for this project is available
• Facility Infrastructure Maintenance Fund -
$107,089.92
In order to complete this work, scaffolding and a lift will be used in order to reach
many of the areas which need to be addressed. While the contractor estimates that
this project should take no longer than 4 -5 weeks, if the it can not be completed by
November 18th, work will be suspended until after the holidays. Funding for this
project is provided in the Facility Infrastructure Maintenance Fund.
A
The approval of this project links to the city's strategy map relative to the focus
areas of Infrastructure. The specific corporate objective that is met by the project is
Invest to provide and maintain high quality public assets
7
61&7• 11M &li ma
The City of Southlake provides municipal services that support
•
the highest quality of
•
life for our residents and businesses. We do this by delivering outstanding
unrivaled quality in everything that we do.
value and
- •
C1�the C2 Provide travel C3 Provide attractive C4 Attract and keep
highest convenience and unique spaces tier businesses to drive
top- C5 Promot
opportunities for
standards of within City and for enjoyment of a dynamic and
safety and region personal interests sustainable economic
partnerships and
volunteer involvement
security environment
B7 Achieve B2 Collaborate with B3 Enhance resident B4 Provide
best select partners to quality of life and high quality
B5 Improve
performance of B6 Optimize
"
-in -class
status in all City implement service business customer
disciplines solutions sustainability through service
delivery and technology f
operational
�
tourism
processes
F1 Adhere to financial
F2 Invest to provide and F3 Achieve fiscal
management maintain high quality wellness
F4 Establish an
maintain eff
principles and budget public assets standards
internal co"
L1 Ensure our L2 Enhance L3 Attract, L4 Recogn'
L5
people understand leadership develop and and
retain a
informed decisio
skilled
workforce
making at all I
in the orga "
The approval of this project links to the city's strategy map relative to the focus
areas of Infrastructure. The specific corporate objective that is met by the project is
Invest to provide and maintain high quality public assets
7
SOUTHLAKE
If you have any questions regarding this item, contact Chuck Kendrick at 748 -8080