Item 4C MemoCITY OF
SOUTH LADE
MEMORANDUM
October 4, 2011
To: Shana Yelverton, City Manager
From: Sharen Jackson, Director of Finance
Timothy Slifka, Purchasing Manager
Subject: Item 4C Approve the Purchase of Replacement and New Vehicles
from Philpott Motors in the amount of $423,305
Action
Requested: Approve the purchase of replacement vehicles from Philpott
Motors for Public Works, Planning, and DPS Police in the
amount of $423,305.
Background
Information: Per the City's Vehicle Replacement Plan /Policy the vehicles
are scheduled for replacement. State of Texas and City of
Southlake bidding requirements have been met by utilizing
Houston Galveston Area Council (HGAC) and BuyBoard
cooperative purchasing contracts.
Financial
Considerations: The request will be funded through the City's vehicle
replacement fund and Department budgets for FY 2012.
Strategic Link: C1 — Achieve the highest standards of safety and security.
B2 — Collaborate with select partners to implement service
solutions.
F2 — Invest to provide and maintain high quality public
assets.
Citizen Input/
Board Review: None
Legal Review: None
Alternatives: Deny and retain the old vehicles. This will lead to increased
vehicle maintenance cost.
Supporting
Documents: HGAC and BuyBoard Pricing Worksheets.
Staff
Recommendation: Approve the purchase of these vehicles from Philpott
Motors.
CONTRACT PRICING WORKSHEET
For Standard Equipment Purchases
Contract
No.:
VE03 -06
Date
Prepared:
8/19/11
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
E End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713 - 993 -4548. Please type or print legibly.
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
Prepared
By:
RICHARD HYDER
Phone:
(817) 748 -8312
Phone:
(409) 853 -3440
Fax:
(817) 748 -8048
Fax:
1 ( 09) 724 -0886
Email:
TSLIFKA(a)-CI. SOUTH LAKE.TX.US
Email:
RICHARD. HYDER(D_PHILPOTTMOTORS.COM
Product
Code:
D18
Description:
2011 FORD EXPLORER
A. Product Item Base Unit Price Per Contractor's H -GAC Contract:
$ 20,692.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
FLOOR PLAN INTEREST
$ 434.54
EXTERIOR - -WHITE SUEDE
$
LOT INSURANCE
$ 62.08
INTERIOR- -GRAY
3.5L V6 GAS
$
6 -SPEED AUTOMATIC TRANSMISSION
$
K713 UPGRADE PKG (REQ FOR 2011)
INLCUDES POWER EQUIPMENT, SPEED CONTROL,
FRONT /REAR AIR CONDITIONING, AMFM CD,
APPEARANCE PKG, CLOTH BUCKETS W/ CONSOLE,
CLOTH 2ND ROW, CARPET FLOORING, HILL DESCENT
CONTROL, 3RD ROW SEATING, RSC AND TRACTION
CONTROL
$ 2,481.00
4286
Subtotal From Additional Sheet(s):
$
Subtotal B:
$ 2,977.62
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
WIGWAGS
$ 99.00
Subtotal From Additional Sheet(s):
$
REAR FLASHERS
$ 99.00
Subtotal C:
$ 278.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
1%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
ESP PREMIUM 6/100 $100 DED
$ 1,990.00
Subtotal D:
$ 2,440.00
E. Total Cost Before Any Applicable Trade -In / Other Allowances / Discounts (A +B +C +D)
$ 26,387.62
Quantity Ordered:
1
X Subtotal of A + B + C + D:
I $ 26,387.62
=
Subtotal E:
j $ 26,387.62
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
$
G. Trade -Ins / Other Allowances / Special Discounts
Description
Cost
Description
Cost
Subtotal G: $
Estimated Delivery Date:
IN STOCK
H. Total Purchase Price (E +F +G): S 26,387.62
PRODUCT PRICING SUMMARY BASED ON CONTRACT
BUYBOARD #358 -10
Vehicles and Heavy Duty Trucks
End User: CITY OF SOUTHLAKE Philpott Rep: RICHARD HYDER
Contact: TIM SLIFKA Phone: (409) 853 -3440
Phone /email: 817 748 -8312 tsh1'ka@,ei.south1ake.tx.us Email: richard.hyderkphilpottmotors.com
Product Description: FORD SUPER DUTY Date: September 8, 2011
A. Bid Series: 100 A. Base Price: I S 24,442.00
B. Published Options [Itemize each below]
Code
Options
Bid Price
Code
Options
Bid Price
W4G
CREW CAB UPGRADE
$ 2,745.00
206
FLAT BED DUMP
$ 6,299.17
99T
6.7L V8 DIESEL B20
$ 7,036.00
197
STAKE SIDES AND REAR
$ 3,824.93
44W
6 -SPD AUTO TRANSMISSION
$ 179.00
267
UNDERBODY MT TOOLBOX
$ 489.75
X4L
14.30 LIMITED SLIP AXLE
$ 339.00
156
BALL/PINTLE COMBO HITCH
$ 253.74
200
200" WHEELBASE 84" CA
$ 282.00
101
WHELEN LED LIGHTBAR TO SPEC
$ 2,395.00
90L
POWER EQUIPMENT GROUP
$ 997.00
262
6 -WAY TRAILER PLUG
$ 76.45
512
SPARE TIRE AND WHEEL
$ 329.00
102A
WHELEN 700 LED AMBER /RED
$ 361.00
52B
ELECTRIC BRAKE CONTROLLER
$ 217.00
102A
WIGWAGS /REAR FLASHERS
$ 198.00
66S
UPFITTER SWITCHES
$ -
102B
EQUIPMENT SERVICES
$ 420.00
535
HD TRAILER TOWING PKG
$ 329.00
184
ANTHONY SM2500SF LIFTGATE
$ 5,988.92
62R
PTO PROVISION
$ 264.00
276
UNIT # 716
Total of B. Published Options: S 33,023.96
C. Unpublished Options [Itemize each below, not to exceed 25 %] S= 10.6 %
Options
Bid Price
Options
Bid Price
4 KEYS
$
6.00
HAVIS DOCKING STATION FOR CF30 W
$
795.00
WESTIN CAB STEPS
$
225.00
HAVIS MD102 ACTION ADAPTER
$
225.00
LEGAL WINDOW TINT
$
200.00
HAVIS HDM202 9" LOWER POLE
$
110.00
ESP PREMIUM 6/100 $100 DEDUCTIBLE
$
4,440.00
HAVIS HDM136 UNIVERSAL FLOOR MO
$
61.00
HAVIS HDM401 SUPPORT BRACE
$
45.00
D.
E.
F.
G.
H
I.
J.
K
L.
M.
N.
O.
Pre - delivery Inspection:
Texas State Inspection:
Manufacturer Destination /Delivery:
Floor Plan Interest (for in -stock and /or equipped vehicles):
Lot Insurance (for in -stock and /or equipped vehicles):
Contract Price Adjustment: BUDGET DISCOUNT
Additional Delivery Charge: 0 miles
Subtotal:
Quantity Ordered 1 x K =
Trade in:
Total of C. Unpublished Options: S 6,107.00 ]
$ 80.00
$ 21.75
$ 975.00
488.84
97.78
S (236.33)
$ -
$ 65,000.00
S 65,000.00
BUYBOARD Administrative Fee (5400 per purchase order)
TOTAL PURCHASE PRICE INCLUDING BUYBOARD FEE
$ 65,000.1111
PRODUCT PRICING SUMMARY BASED ON CONTRACT
BUYBOARD #358 -10
Vehicles and Heavy Duty Trucks
End User: CITY OF SOUTHLAKE Philpott Rep: RICHARD HYDER
Contact: TIM SLIFKA Phone: (409) 853 -3440
Phone /email: 817 748 -8312 tslifka@ei.southlake.tx.us Email: richard .hvderkphilpottmotors.com
Product Description: FORD SUPER DUTY CHASSIS Date: September 16, 2011
A. Bid Series: 100 A. Base Price: $ 24,442.00
B. Published Options [Itemize each below]
Code
Options
Bid Price
Code
Options
Bid Price
212
UPGRADE TO F7F 26K# GVWR
$ 19,501.00
76B
FRONT TOW HOOKS
$ 69.00
425
EMISSIONS
$ 4,000.00
65V
65 GALLON FUEL TANK
$ 235.00
158
158" WB 84" CA
$ 115.00
88H
10 GALLON UREA TANK
$
76B
IFRONT TOW HOOKS
$ 69.00
54C
I CONVEX MIRRORS
$ 41.00
67C
AIR BRAKES
$ 1,261.00
447
DAVIS 6/8 YD DUMP **
$ 7,593.60
62D
AIR DRYER
$ 430.00
COLOR GREEN #PMS 553
61D
TAPER LEAF SPRINGS 12K=
$ 150.00
88B
DRIVER AIR RIDE SEAT
$ 436.00
43C
FRONT I -BEAM 12K#
$ 493.00
99C
CUMMINS 6.71, ISB 24011P
$ 1,457.00
X51)
5.57 REAR AXLE RATIO
$ -
#739
475
REAR AXLE SINGLE SPD 21K#
$
158
158" WHEELBASE 84" CA
$ 115.00
Total of B. Published Options: I $ 35,965.60
C. Unpublished Options [Itemize each below, not to exceed 25 %] $= 11.3 %
Options
Bid Price
Options
Bid Price
* *UPGRADE DAVIS DUMP: MANUAL TARP,
60K# TOWING PKG FOR ELECTRIC OR AIR
BRAKE TRAILERS, GREEN PMS 553
$ 3,396.40
ESP BASE 5 YEAR 200K MILES
$ 3,200.00
(DOES NOT COVER ENGINE /TRANS)
LEGAL WINDOW TINT
$ 200.00
D. Pre - delivery Inspection:
E. Texas State Inspection:
F. Manufacturer Destination /Delivery:
G. Floor Plan Interest (for in -stock and /or equipped vehicles):
H Lot Insurance (for in -stock and /or equipped vehicles):
L Contract Price Adjustment:
J. Additional Delivery Charge: 0 miles
K. Subtotal:
L. Quantity Ordered 1 x K =
M. Trade in:
N. BUYBOARD Administrative Fee ($400 per purchase order)
O. TOTAL PURCHASE PRICE INCLUDING BUYBOARD FEE
Total of C. Unpublished Options: I $ 6,796.40
$ 80.00
$ -
$ 1,275.00
488.84
97.77
$ -
$ 69,145.61
$ 69,145.61
$ 400.00
$ 69,545.61
CONTRACT PRICING WORKSHEET
For Standard Equipment Purchases
Contract
No.:
VE03 -06
Date
Prepared:
8/19/11
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
E End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713 - 993 -4548. Please type or print legibly.
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
Prepared
By:
RICHARD HYDER
Phone:
(817) 748 -8312
Phone:
(409) 853 -3440
Fax:
(817) 748 -8048
Fax:
1 ( 09) 724 -0886
Email:
TSLIFKA(a)-CI. SOUTH LAKE.TX.US
Email:
RICHARD. HYDER(D -PHILPOTTMOTORS.COM
Product
Code:
D24
Description:
2011 FORD F150 SUPERCAB
A. Product Item Base Unit Price Per Contractor's H -GAC Contract:
$ 15,839.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
FLOOR PLAN INTEREST
$ 332.62
EXTERIOR - -WHITE
$
LOT INSURANCE
$ 47.52
INTERIOR- -GRAY
AUTOMATIC TRANSMISSION
$ -
6 -WAY SWITCHBOX
$ 119.00
AIR CONDITIONING
$
LED LIGHTBAR W/ SPLIT TA
$ 2,395.00
ANTILOCK BRAKES
$
XH9 LIMITED SLIP AXLE
$ 270.00
145" 6.5' BED
$
CLOTH SEATING 40/20/40
$
UNIT 4 793
AMFM RADIO
$
99F 5.OL V8 GAS /E85
$ 1,830.00
7050# GVWR
$
535 TRAILER TOWING PKG
$ 350.00
Subtotal From Additional Sheet(s):
$ -
85A POWER EQUIPMENT GROUP
$ 995.00
Subtotal B:
$ 6,339.14
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
ADD 6 WIRE ROUND TRAILER PLUG
$
5213/54P TRAILER BRAKE CONTROLLER
$ 351.00
Subtotal From Additional Sheet(s):
$ 1,759.00
WINDOW TINT LEGAL
$ 150.00
Subtotal C:
$ 2,340.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
11%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
ESP PREMIUM 6/100 $100 DED
$ 1,990.00
EQUIPMENT SERVICES
$ 210.00
Subtotal D:
$ 2,650.00
E. Total Cost Before Any Applicable Trade -In / Other Allowances / Discounts (A +B +C +D)
$ 27,168.14
Quantity Ordered:
1
X Subtotal of A + B+ C + D:
I $ 27,168.14
=
Subtotal E:
$ 27,168.14
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
$
G. Trade -Ins / Other Allowances / Special Discounts
Description
Cost
Description
Cost
Subtotal G: $
Estimated Delivery Date:
90 DAYS ARO
H. Total Purchase Price (E +F +G): S 27,168.14
wq vp
PAGE 2 -- ADDITIONAL OPTIONS
Contract
No.:
I
VE03 -06
Date
Prepared:
8/19/11
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
E End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713 - 993 -45
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
Prepared
By:
RICHARD HYDER
Phone:
8177488312
Phone:
4098533440
Fax:
8177488048
Fax:
4097240886
Email:
TSLIFKA(p7CI.SOUTHLAKE.TX.US
Email:
RICHARD. HYDER(d)PHILPOTTMOTORS.COM
Product
Code:
D24
Description:
2011 FORD F150 SUPERCAB
B. Additional
Published Options to be added to page 1
Description
Cost
Description
Cost
Subtotal B:
$
C. Additional Unpublished Options to be added to page 1
Description
Cost
Description
Cost
WIGWAGS
$ 99.00
REAR FLASHERS
$ 99.00
4 KEYS
$ 100.00
WESTIN TUBULAR CAB STEPS
$ 225.00
HAVIS DOCKING STATION FOR CF30 W/ 2 PORTS
$ 795.00
HAVIS MD 102 ACTION ADAPTER
$ 225.00
HAVIS HDM202 9" LOWER POLE
$ 110.00
HAVIS HDM136 UNIVERSAL FLOOR MOUNT
$ 61.00
HAVIS HDM401 SUPPORT BRACE
$ 45.00
Subtotal C:
$ 1,759.00
PRODUCT PRICING SUMMARY BASED ON CONTRACT
BUYBOARD #358 -10
Vehicles and Heavy Duty Trucks
End User: CITY OF SOUTHLAKE Philpott Rep: RICHARD HYDER
Contact: TIM SLIFKA Phone: (409) 853 -3440
Phone /email: 817 748 -8312 tslifka@ci.southlake.tx.us Email: richard .hvderkphilpottmotors.com
Product Description: FORD SUPER DUTY Date: August 19, 2011
A. Bid Series: 100 A. Base Price: I $ 24,442.00
B. Published Options [Itemize each below]
Code
Options
Bid Price
Code
Options
Bid Price
W4G
CREW CAB UPGRADE
$ 2,745.00
HAVIS DOCKING STATION FOR CF30 W
$
795.00
99T
6.71, V8 DIESEL B20
$ 7,036.00
HAVIS MD102 ACTION ADAPTER
#825
225.00
44W
6 -SPD AUTO TRANSMISSION
$ 179.00
HAVIS HDM202 9" LOWER POLE
$
110.00
X41,
14.30 LIMITED SLIP AXLE
$ 339.00
156
BALL/PINTLE COMBO HITCH
$ 253.74
200
200" WHEELBASE 84" CA
$ 282.00
101
WHELEN LED LIGHTBAR TO SPEC
$ 2,395.00
90L
POWER EQUIPMENT GROUP
$ 997.00
262
6 -WAY TRAILER PLUG
$ 76.45
512
SPARE TIRE AND WHEEL
$ 329.00
102A
WHELEN 700 LED AMBER/RED
$ 361.00
52B
ELECTRIC BRAKE CONTROLLER
$ 217.00
102A
WIGWAGS/REAR FLASHERS
$ 198.00
66S
UPFITTER SWITCHES
$ -
102B
EQUIPMENT SERVICES
$ 420.00
535
HD TRAILER TOWING PKG
$ 329.00
62R
PTO PROVISION
$ 264.00
UNIT # 825
Total of B. Published Options: I $ 16,421.19
C. Unpublished Options [Itemize each below, not to exceed 25 %] $= 14.9 %
Options
Bid Price
Options
Bid Price
4 KEYS
$
6.00
HAVIS DOCKING STATION FOR CF30 W
$
795.00
WESTIN CAB STEPS
$
225.00
HAVIS MD102 ACTION ADAPTER
$
225.00
LEGAL WINDOW TINT
$
200.00
HAVIS HDM202 9" LOWER POLE
$
110.00
ESP PREMIUM 6/100 $100 DEDUCTIBLE
$
4,440.00
HAVIS HDM136 UNIVERSAL FLOOR MO
$
61.00
HAVIS HDM401 SUPPORT BRACE
$
45.00
D. Pre - delivery Inspection:
E. Texas State Inspection:
F. Manufacturer Destination /Delivery:
G. Floor Plan Interest (for in -stock and /or equipped vehicles):
H Lot Insurance (for in -stock and /or equipped vehicles):
L Contract Price Adjustment:
J. Additional Delivery Charge: 0 miles
K. Subtotal:
L. Quantity Ordered 1 x K =
M. Trade in:
N. BUYBOARD Administrative Fee ($400 per purchase order)
O. TOTAL PURCHASE PRICE INCLUDING BUYBOARD FEE
Total of C. Unpublished Options: $ 6,107.00
$ 80.00
$ 21.75
$ 975.00
488.84
97.78
$ -
$ 48,633.56
$ 48,633.56
$ -
$ 48,633.56
CONTRACT PRICING WORKSHEET
For Standard Equipment Purchases
Contract
No.:
VE03 -06
Date
Prepared:
8/19/11
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
E End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713 - 993 -4548. Please type or print legibly.
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
Prepared
By:
RICHARD HYDER
Phone:
(817) 748 -8312
Phone:
(409) 853 -3440
Fax:
(817) 748 -8048
Fax:
1 ( 09) 724 -0886
Email:
TSLIFKA(a)-CI. SOUTH LAKE.TX.US
Email:
I RICHARD. HYDER(D -PHILPOTTMOTORS.COM
Product
Code:
D28
Description:
2012 FORD F250 SUPER CAB PICKUP (WITH 4X4 UPGRADE)
A. Product Item Base Unit Price Per Contractor's H -GAC Contract:
$ 20,013.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
FLOOR PLAN INTEREST
$ 420.28
X3E ELECTRONIC LOCKING AXLE
$ 366.00
LOT INSURANCE
$ 60.04
90L POWER EQUIPMENT GROUP
$ 799.00
99T 6.7L DIESEL B20
$ 6,895.00
66S UPFITTER SWITCHES
$ 80.00
44T 6 -SPD AUTOMATIC TRANSMISSION
$ -
52B TRAILER BRAKE CONTROLLER
$ 195.00
AIR CONDITIONING
$
HEADACHE RACK
$ 335.00
TELESCOPIC MIRRORS
$
LED LIGHTBAR W/ SPLIT TA
$ 2,395.00
158" WB 8' BED
$
4x4 UPGRADE
$ 2,975.00
AMFM RADIO
$
TBM ALL TERRAIN TIRES
$ 118.00
9400# GVWR
$
213 SHIFT ON THE FLY
$ 174.00
RECEIVER HITCH
$
UNIT 4 828
SPARE TIRE AND WHEEL
$
Subtotal From Additional Sheet(s):
$
40/20/40 CLOTH SPLIT BENCH SEAT
$ 100.00
Subtotal B:
$ 14,912.32
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
ADD 6 WIRE ROUND TRAILER PLUG
$ -
Subtotal From Additional Sheet(s):
$ 3,584.00
WINDOW TINT LEGAL
$ 175.00
Subtotal C:
$ 3,839.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
11%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
ESP 6/100 PREMIUM $100 DED
$ 2,980.00
EQUIPMENT SERVICES
$ 210.00
Subtotal D:
$ 3,640.00
E. Total Cost Before Any Applicable Trade -In / Other Allowances / Discounts (A +B +C +D)
$ 42,404.32
Quantity Ordered:
1
X Subtotal of A + B + C + D:
I $ 42,404.32
=
Subtotal E:
$ 42,404.32
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
$
G. Trade -Ins / Other Allowances / Special Discounts
Description
Cost
Description
Cost
Subtotal G: $ -
Estimated Delivery Date:
90 DAYS ARO
H. Total Purchase Price (E +F +G): S 42,404.32
wq vp
PAGE 2 -- ADDITIONAL OPTIONS
Contract
No.:
I
VE03 -06
Date
Prepared:
8/19/11
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
E End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713 - 993 -45
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
Prepared
By:
RICHARD HYDER
Phone:
8177488312
Phone:
4098533440
Fax:
8177488048
Fax:
4097240886
Email:
TSLIFKA(p7CI.SOUTHLAKE.TX.US
Email:
RICHARD. HYDER(d)PHILPOTTMOTORS.COM
Product
Code:
D28
Description:
2012 FORD F250 SUPER CAB PICKUP (WITH 4X4 UPGRADE)
B. Additional
Published Options to be added to page 1
Description
Cost
Description
Cost
Subtotal B:
$
C. Additional Unpublished Options to be added to page 1
Description
Cost
Description
Cost
WIGWAGS
$ 99.00
REAR FLASHERS
$ 99.00
4 KEYS
$ 100.00
WESTIN TUBULAR CAB STEPS
$ 225.00
HAVIS DOCKING STATION FOR CF30 W/ 2 PORTS
$ 795.00
HAVIS MD 102 ACTION ADAPTER
$ 225.00
HAVIS HDM202 9" LOWER POLE
$ 110.00
HAVIS HDM136 UNIVERSAL FLOOR MOUNT
$ 61.00
HAVIS HDM401 SUPPORT BRACE
$ 45.00
UWS TT- 100 -COMBO WITH FILLRITE 1210C PUMP
AND 50' HOSE WITH IN CAB SWITCH
$ 1,825.00
Subtotal C:
$ 3,584.00
CONTRACT PRICING WORKSHEET
For Standard Equipment Purchases
Contract
No.:
VE03 -06
Date
Prepared:
8/19/11
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
E End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713 - 993 -4548. Please type or print legibly.
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
Prepared
By:
RICHARD HYDER
Phone:
(817) 748 -8312
Phone:
(409) 853 -3440
Fax:
(817) 748 -8048
Fax:
1 ( 09) 724 -0886
Email:
TSLIFKA(a)-CI. SOUTH LAKE.TX.US
Email:
RICHARD. HYDER(D -PHILPOTTMOTORS.COM
Product
Code:
D24
Description:
2011 FORD F150 SUPERCAB
A. Product Item Base Unit Price Per Contractor's H -GAC Contract:
$ 15,839.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
FLOOR PLAN INTEREST
$ 332.62
EXTERIOR - -WHITE
$
LOT INSURANCE
$ 47.52
INTERIOR- -GRAY
AUTOMATIC TRANSMISSION
$ -
6 -WAY SWITCHBOX
$ 119.00
AIR CONDITIONING
$
LED LIGHTBAR W/ SPLIT TA
$ 2,395.00
ANTILOCK BRAKES
$
XH9 LIMITED SLIP AXLE
$ 270.00
145" 6.5' BED
$
CLOTH SEATING 40 /20/40
$
UNIT 4 917
AMFM RADIO
$
99F 5.OL V8 GAS /E85
$ 1,830.00
7050# GVWR
$
535 TRAILER TOWING PKG
$ 350.00
Subtotal From Additional Sheet(s):
$ -
85A POWER EQUIPMENT GROUP
$ 995.00
Subtotal B:
$ 6,339.14
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
ADD 6 WIRE ROUND TRAILER PLUG
$
5213/54P TRAILER BRAKE CONTROLLER
$ 351.00
Subtotal From Additional Sheet(s):
$ 1,759.00
WINDOW TINT LEGAL
$ 150.00
Subtotal C:
$ 2,340.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
11%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
ESP PREMIUM 6/100 $100 DED
$ 1,990.00
EQUIPMENT SERVICES
$ 210.00
Subtotal D:
$ 2,650.00
E. Total Cost Before Any Applicable Trade -In / Other Allowances / Discounts (A +B +C +D)
$ 27,168.14
Quantity Ordered:
1
X Subtotal of A + B+ C + D:
I $ 27,168.14
=
Subtotal E:
$ 27,168.14
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
$ 600.00
G. Trade -Ins / Other Allowances / Special Discounts
Description
Cost
Description
Cost
Subtotal G: $
Estimated Delivery Date:
90 DAYS ARO
H. Total Purchase Price (E +F +G): S 27,768.14
wq vp
PAGE 2 -- ADDITIONAL OPTIONS
Contract
No.:
I
VE03 -06
Date
Prepared:
8/19/11
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
E End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713 - 993 -45
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
Prepared
By:
RICHARD HYDER
Phone:
8177488312
Phone:
4098533440
Fax:
8177488048
Fax:
4097240886
Email:
TSLIFKA(p7CI.SOUTHLAKE.TX.US
Email:
RICHARD. HYDER(d)PHILPOTTMOTORS.COM
Product
Code:
D24
Description:
2011 FORD F150 SUPERCAB
B. Additional
Published Options to be added to page 1
Description
Cost
Description
Cost
Subtotal B:
$
C. Additional Unpublished Options to be added to page 1
Description
Cost
Description
Cost
WIGWAGS
$ 99.00
REAR FLASHERS
$ 99.00
4 KEYS
$ 100.00
WESTIN TUBULAR CAB STEPS
$ 225.00
HAVIS DOCKING STATION FOR CF30 W/ 2 PORTS
$ 795.00
HAVIS MD 102 ACTION ADAPTER
$ 225.00
HAVIS HDM202 9" LOWER POLE
$ 110.00
HAVIS HDM136 UNIVERSAL FLOOR MOUNT
$ 61.00
HAVIS HDM401 SUPPORT BRACE
$ 45.00
Subtotal C:
$ 1,759.00
CONTRACT PRICING WORKSHEET
For Standard Equipment Purchases
Contract
No.:
VE03 -06
Date
Prepared:
8/19/11
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
E End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713 - 993 -4548. Please type or print legibly.
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
Prepared
By:
RICHARD HYDER
Phone:
(817) 748 -8312
Phone:
(409) 853 -3440
Fax:
(817) 748 -8048
Fax:
1 ( 09) 724 -0886
Email:
TSLIFKA(a)-CI. SOUTH LAKE.TX.US
Email:
RICHARD. HYDER(D -PHILPOTTMOTORS.COM
Product
Code:
D24
Description:
2011 FORD F150 SUPERCAB
A. Product Item Base Unit Price Per Contractor's H -GAC Contract:
$ 15,839.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
FLOOR PLAN INTEREST
$ 332.62
EXTERIOR - -WHITE
$
LOT INSURANCE
$ 47.52
INTERIOR- -GRAY
AUTOMATIC TRANSMISSION
$ -
6 -WAY SWITCHBOX
$ 119.00
AIR CONDITIONING
$
LED LIGHTBAR W/ SPLIT TA
$ 2,395.00
ANTILOCK BRAKES
$
XH9 LIMITED SLIP AXLE
$ 270.00
145" 6.5' BED
$
CLOTH SEATING 40/20/40
$
AMFM RADIO
$
UNIT 4 918
99F 5.OL V8 GAS /E85
$ 1,830.00
7050# GVWR
$
535 TRAILER TOWING PKG
$ 350.00
Subtotal From Additional Sheet(s):
$
85A POWER EQUIPMENT GROUP
$ 995.00
Subtotal B:
$ 6,339.14
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
ADD 6 WIRE ROUND TRAILER PLUG
$
5213/54P TRAILER BRAKE CONTROLLER
$ 351.00
Subtotal From Additional Sheet(s):
$ 1,759.00
WINDOW TINT LEGAL
$ 150.00
Subtotal C:
$ 2,340.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
11%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
ESP PREMIUM 6/100 $100 DED
$ 1,990.00
EQUIPMENT SERVICES
$ 210.00
Subtotal D:
$ 2,650.00
E. Total Cost Before Any Applicable Trade -In / Other Allowances / Discounts (A +B +C +D)
$ 27,168.14
Quantity Ordered:
1
X Subtotal of A + B+ C + D:
I $ 27,168.14
=
Subtotal E:
$ 27,168.14
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
$
G. Trade -Ins / Other Allowances / Special Discounts
Description
Cost
Description
Cost
Subtotal G: $
Estimated Delivery Date:
90 DAYS ARO
H. Total Purchase Price (E +F +G): S 27,168.14
wq vp
PAGE 2 -- ADDITIONAL OPTIONS
Contract
No.:
I
VE03 -06
Date
Prepared:
8/19/11
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
E End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713 - 993 -45
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
Prepared
By:
RICHARD HYDER
Phone:
8177488312
Phone:
4098533440
Fax:
8177488048
Fax:
4097240886
Email:
TSLIFKA(p7CI.SOUTHLAKE.TX.US
Email:
RICHARD. HYDER(d)PHILPOTTMOTORS.COM
Product
Code:
D24
Description:
2011 FORD F150 SUPERCAB
B. Additional
Published Options to be added to page 1
Description
Cost
Description
Cost
Subtotal B:
$
C. Additional Unpublished Options to be added to page 1
Description
Cost
Description
Cost
WIGWAGS
$ 99.00
REAR FLASHERS
$ 99.00
4 KEYS
$ 100.00
WESTIN TUBULAR CAB STEPS
$ 225.00
HAVIS DOCKING STATION FOR CF30 W/ 2 PORTS
$ 795.00
HAVIS MD 102 ACTION ADAPTER
$ 225.00
HAVIS HDM202 9" LOWER POLE
$ 110.00
HAVIS HDM136 UNIVERSAL FLOOR MOUNT
$ 61.00
HAVIS HDM401 SUPPORT BRACE
$ 45.00
Subtotal C:
$ 1,759.00
PRODUCT PRICING SUMMARY BASED ON CONTRACT
BUYBOARD #358 -10
Vehicles and Heavy Duty Trucks
End User: CITY OF SOUTHLAKE Philpott Rep: RICHARD HYDER
Contact: TIM SLIFKA Phone: (409) 853 -3440
Phone /email: 817 748 -8312 tsh1'ka@,ci.south1ake.tx.us Email: richard.hyder philpottmotors.com
Product Description: FORD SUPER DUTY Date: August 19, 2011
A. Bid Series: 100 A. Base Price: $ 24,442.00
B. Published Options [Itemize each below]
Code
Options
Bid Price
Code
Options
Bid Price
W4G
CREW CAB UPGRADE
$ 2,745.00
206
FLAT BED DUMP
$ 6,299.17
99T
6.7L V8 DIESEL B20
$ 7,036.00
197
STAKE SIDES AND REAR
$ 3,824.93
44W
6 -SPD AUTO TRANSMISSION
$ 179.00
X4L
14.30 LIMITED SLIP AXLE
$ 339.00
156
BALL/PINTLE COMBO HITCH
$ 253.74
200
200" WHEELBASE 84" CA
$ 282.00
101
WHELEN LED LIGHTBAR TO SPEC
$ 2,395.00
90L
POWER EQUIPMENT GROUP
$ 997.00
262
6 -WAY TRAILER PLUG
$ 76.45
512
SPARE TIRE AND WHEEL
$ 329.00
102A
WHELEN 700 LED AMBER /RED
$ 361.00
52B
ELECTRIC BRAKE CONTROLLER
$ 217.00
102A
WIGWAGS /REAR FLASHERS
$ 198.00
66S
UPFITTER SWITCHES
$ -
102B
EQUIPMENT SERVICES
$ 420.00
535
HD TRAILER TOWING PKG
$ 329.00
184
ANTHONY SM2500SF LIFTGATE
$ 5,988.92
Total of B. Published Options: S 32,270.21
C. Unpublished Options [Itemize each below, not to exceed 25 %1 S= 8.6 %
Options
Bid Price
Options
Bid Price
4 KEYS
$ 6.00
WESTIN CAB STEPS
$ 225.00
LEGAL WINDOW TINT
$ 200.00
UNIT # 959
ESP PREMIUM 6/100 $100 DEDUCTIBLE
$ 4,440.00
#959
D.
E.
F.
G.
H
I.
J.
K
L.
M.
N.
O.
Pre - delivery Inspection:
Texas State Inspection:
Manufacturer Destination /Delivery:
Floor Plan Interest (for in -stock and /or equipped vehicles):
Lot Insurance (for in -stock and /or equipped vehicles):
Contract Price Adjustment:
Total of C. Unpublished Options: S 4,871.00
$ 80.00
$ 21.75
$ 975.00
488.84
97.78
Additional Delivery Charge: 0 miles
Subtotal:
Quantity Ordered 1 x K =
Trade in:
BUYBOARD Administrative Fee (5400 per purchase order)
TOTAL PURCHASE PRICE INCLUDING BUYBOARD FEE
$ -
S 63,246.58
S 63,246.58
-
$ 63,246.58
CONTRACT PRICING WORKSHEET
For Standard Equipment Purchases
Contract
No.:
VE03 -06
Date
Prepared:
8/19/11
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
E End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713 - 993 -4548. Please type or print legibly.
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
Prepared
By:
RICHARD HYDER
Phone:
(817) 748 -8312
Phone:
(409) 853 -3440
Fax:
(817) 748 -8048
Fax:
1 ( 09) 724 -0886
Email:
TSLIFKA(a)-CI. SOUTH LAKE.TX.US
Email:
RICHARD. HYDER(D -PHILPOTTMOTORS.COM
Product
Code:
D23
Description:
2011 FORD F150
A. Product Item Base Unit Price Per Contractor's H -GAC Contract:
$ 18,279.00
B. Published Options - Itemize below - Attach additional sheet(s) if necessary - Include Option Code in description if applicable.
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
FLOOR PLAN INTEREST
$ 314.84
EXTERIOR -- WHITE
$
LOT INSURANCE
$ 44.98
INTERIOR- -GRAY
AUTOMATIC TRANSMISSION
$ -
XH9 LIMITED SLIP AXLE
$ 270.00
AIR CONDITIONING
$
6 -WAY SWITCHBOX
$ 119.00
ANTILOCK BRAKES
$
LED LIGHTBAR W/ SPLIT TA
$ 2,395.00
145" 8' BED
$
CLOTH SEATING 40 /20/40
$
UNIT 4 971
AMFM RADIO
$
6750# GVWR
$
535 TRAILER TOWING PKG
$ 350.00
85A POWER EQUIPMENT GROUP
$ 995.00
Subtotal From Additional Sheet(s):
$
Subtotal B:
$ 4,488.82
C. Unpublished Options - Itemize below / attach additional sheet(s) if necessary.
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)
Description
Cost
Description
Cost
PDI CHARGE
$ 80.00
WINDOW TINT LEGAL
$ 150.00
CREDIT F12WQ145
$ (3,607.00)
Subtotal From Additional Sheet(s):
$ 2,110.00
5.OL V8 GAS E85 - -360 HP, 380 FTLBS TORQUE
$ 1,830.00
Subtotal C:
$ 563.00
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit
Price plus Published Options (A +B).
For this transaction the percentage is:
2%
D. Other Cost Items Not Itemized Above (e.g. Installation, Freight, Delivery, Etc.)
Description
Cost
Description
Cost
DELIVERY 300 MILES
$ 450.00
ESP PREMIUM 6/100 $100 DED
$ 1,990.00
EQUIPMENT SERVICES
$ 210.00
Subtotal D:
$ 2,650.00
E. Total Cost Before Any Applicable Trade -In / Other Allowances / Discounts (A +B +C +D)
$ 25,980.82
Quantity Ordered:
1
X Subtotal of A + B + C + D:
I $ 25,980.82
=
Subtotal E:
$ 25,980.82
F. H -GAC Fee Calculation (From Current Fee Tables)
Subtotal F:
$
G. Trade -Ins / Other Allowances / Special Discounts
Description
Cost
Description
Cost
Subtotal G: $
Estimated Delivery Date:
60 -90 DAYS
H. Total Purchase Price (E +F +G): S 25,980.82
wq vp
PAGE 2 -- ADDITIONAL OPTIONS
Contract
No.:
I
VE03 -06
Date
Prepared:
8/19/11
This Form must be prepared by Contractor and given to End User. The H -GAC administrative fee shall be shown in Section
E End User issues PO to Contractor, and MUST also fax a copy of PO, together with completed Pricing Worksheet, to H-
GAC @ 713 - 993 -45
Buying
Agency:
CITY OF SOUTHLAKE
Contractor:
PHILPOTT MOTORS
Contact
Person:
TIM SLIFKA
Prepared
By:
RICHARD HYDER
Phone:
8177488312
Phone:
4098533440
Fax:
8177488048
Fax:
4097240886
Email:
TSLIFKA(p7CI.SOUTHLAKE.TX.US
Email:
RICHARD. HYDER(d)PHILPOTTMOTORS.COM
Product
Code:
D23
Description:
2011 FORD Fl-50
B. Additional
Published Options to be added to page 1
Description
Cost
Description
Cost
Subtotal B:
$
C. Additional Unpublished Options to be added to page 1
Description
Cost
Description
Cost
5213/54P TRAILER BRAKE CONTROLLER
$ 351.00
ADD 6 WIRE ROUND TRAILER PLUG
$
WIGWAGS
$ 99.00
REAR FLASHERS
$ 99.00
4 KEYS
$ 100.00
WESTIN TUBULAR CAB STEPS
$ 225.00
HAVIS DOCKING STATION FOR CF30 W/ 2 PORTS
$ 795.00
HAVIS MD 102 ACTION ADAPTER
$ 225.00
HAVIS HDM202 9" LOWER POLE
$ 110.00
HAVIS HDM136 UNIVERSAL FLOOR MOUNT
$ 61.00
HAVIS HDM401 SUPPORT BRACE
$ 45.00
Subtotal C:
$ 2,110.()0