Loading...
Item 4Ordinance No. 880-B, Revisions to Chapter 9.5 of the City of Southlake Code, Article V – Oil & Gas Well Drilling and Production. Item 4 Presentation Review of topics discussed at the August 16th work session. Review proposed changes to the ordinance. Setback Discussion (September 6th) Recap of Topics Discussed MSDS Sheets (Quantity –All Chemicals) Assisted Living (Discussion) Leak Detection and Repair (LDAR) Supervisory Control and Data Acquisition (SCADA) Recap of Topics Discussed Establishment of Submission Parameters for the Emergency and HAZMAT Response Plan Evacuation – Persons Notified (Discussion) Seismic Testing - Road Repair/Infrastructure Recap of Topics Discussed Green Fluids Security Camera Insurance Public Parks (Discussion) “Oil & Gas” terminology All / Section 9.5-222. Definitions Section 9.5-231. Road repair agreement / Section 9.5-232. Well Permit required Section 9.5-233. Seismic survey permit required Page 1 1. All references previously changed to Gas and Oil have been changed back to Oil and Gas 2. Added definition for Leak Detection and Repair (LDAR) Program 3. Added definition for Supervisory Control and Data Acquisition (SCADA) 4. Included seismic survey permit to road repair agreement regulation 5. Added language prohibiting issuance of permits to drill within any public park (discussion) 6. Provided cross reference in adding language to the seismic survey permit requirements regarding a road repair agreement Section 9.5-234. Application and review of well permit Page 2 7. Provided cross reference to address all submission requirements 8. Added language to ensure well detailed hazardous materials management plan 9. Added language to ensure that all chemicals and materials are listed in the MSDS; to include quantities 10. Added language to enhance the requirements for an emergency response plan Section 9.5-234. Application and review of well permit Page 3 11. Added language to submittal requirements for an evacuation plan to address assisted living and nursing care facilities (discussion), as well as, notification in the event of an emergency 12. Added language to expand leak detection requirements to include a Leak Detection and Repair (LDAR) Program Section 9.5-234. Application and review of well permit Page 4 13. Added requirement for a Supervisory Control and Data Acquisition (SCADA) Plan Added requirement for a soil sampling plan 15. & 16. Adjusted insurance coverage to be inline with Flower Mound Section 9.5-234. Application and review of well permit Section 9.5-237. Insurance and indemnification Page 5 Adjusted insurance coverage to be inline with Flower Mound 18. Added assisted living or nursing care facilities to setback requirement (discussion) Revised language to provide consistency 20. Added language for MSDS details, as well as the additional requirement for use of green compounds Section 9.5-237. Insurance and indemnification Section 9.5-242. On-site operation requirements Page 6 21. Provided cross reference for emergency response plan requirements 22. Provided cross reference for hazardous materials plan 23. Added requirement for automated audible alarm system 24. Revised language to allow requirement for more than one security camera if deemed necessary Section 9.5-242. On-site operation requirements Page 7 25. Added requirements for pre- and post drilling, and periodic soil sampling Section 9.5-242. On-site operation requirements Page 8 Added language to provide consistency Added language to provide consistency; to increase notification requirements; and to specify fracture technology and operations Section 9.5-244. Workover or re-working of well; notice Section 9.5-245. Well operations and inspections Page 9 Setback Discussion (September 6th) Setback Maps Flower Mound Well Map Flower Mound Land Use Plan ESA Definition Survey Information Proposed Schedule Potential City Council 1st Reading October 4th City Council 2nd Reading October 18th Questions?