WS Item 4 Setback SurveyAUGUST 2011
Setback Survey
Southlake
Flower Mound
Mansfield
Arlington
Colleyville
Hurst
Burleson
Grand Prairie
1
permanent off -site ignition sources
300 feet
500 feet
no reference
no reference
no reference
100 feet
no reference
300 feet
2
public right of way
100 feet
750 feet
no reference
75 feet
500 feet
75 feet
100 feet
75 feet
3
fuel sources
300 feet
500 feet
300 feet
100 feet
500 feet
25 feet
200 feet
25 feet
4
public parks
no reference
1500 feet
no reference
600 feet
1000 feet
600 feet
no reference
1000 feet
600 feet
1000 feet from the
(1000 feet from
5
public or private schools
property line
1500 feet
hospitals and law
600 feet
1000 feet
600 feet
500 feet
700 feet
enforcement
centers)
6
residential dwellings or habitable
1000 feet
1500 feet
600 feet
600 feet
1000 feet
600 feet
500 feet
700 feet
structures
7
fresh water wells
no reference
1500 feet
no reference
200 feet (RRC reg)
300 feet
300 feet
no reference
no reference
No gas well permit shall be
issued for any well to be drilled
within any floodway. No gas
No drill site,
No meters, storage
well permit shall be issued for
A drill site or
operation site or
tanks, separation
No gas well permit
any well to be drilled within 100
operation site may
line compressor
facilities, or other
shall be issued for
feet of any type of surface
only be allowed in a
facility may be
aboveground
any well to be drilled
water conveyance, including,
floodplain with the
located in a
facilities, other than
within any floodplain
but not limited to, creeks,
8
floodplain
approval of the city
750 feet
floodplain without
the well head and
no reference
or floodway identified
no reference
streams, lakes, ponds,
and, where
the approval of the
flow lines shall be
by FEMA on the most
drainage ditches, or other
applicable, the U.S.
city and, where
placed in a floodway
current FIRM without
constructed strom water
Army Corps of
applicable, the U.S.
or the 100 -year
obtaining a floodplain
conveyance systems. Well sites
Engineers.
Army Corps of
floodplain .
development permit.
proposed to be installed within
Engineers.
the 100 -year floodplain shall
have approval of the city and,
where applicable, the U.S.
Army Corps of Engineers.
9
environmentally sensitive areas
no reference
750 feet
no reference
no reference
no reference
no reference
no reference
no reference
(p rohibited within )
(prohibited within
no permits to drill unless
applicant submits
10
U.S. Army Corps of Engineers
no reference
Written approval from
no reference
no reference
no reference
no reference
no reference
no reference
USACE verifying that
proposed site is not
located within 3,000 feet