Loading...
WS Item 4City Council Work Session Item 4 Purpose of the Presentation Discuss the changes to the ordinance to date Discuss new changes to the ordinance since the August 23rd work session Overview of Setbacks Items SUMMARY OF MAJOR CHANGES Major Changes Definitions – Section 9.5-222 Variance Procedure - Section 9.5-223 Takings Determination - Section 9.5-225 Well Permit – Section 9.5-232 Seismic Survey Permit – 9.5-233 Major Changes Application and review of well permits – Section 9.5 -234 - MSDS Requirements - Landscape Irrigation Plan - Leak Detection Plan - Green Completion Plan - Gas Dispersion and Risk Assessment Major Changes Application and review of well permits – Section 9.5 -234 (Continued) - Third Party Consultant - Noise Management Plan - Traffic Impact Analysis - Line of Site Analysis Major Changes Application and review of well permits – Section 9.5 -234 (Continued) - Hazardous Material Plan - Emergency Response Plan - Evacuation Plan - SCADA Plan - Soil Sampling Plan Major Changes Application and review of well permits – Section 9.5 -234 (Continued) - Continuous Air Quality Monitoring Plan - Continuous Water Monitoring Plan - Color Renderings of proposed site - Green Completion Plan - List of Green Compounds Major Changes Insurance and Indemnification – Section 9.5-237 - Bodily Injury and Property Damage - Environmental Impairment - Excess Liability Insurance Major Changes On-site Operation Requirements – Section 9.5 -242 - Continuous air, water and soil testing - Blow Out Prevention - Chemical and Material Storage - Secondary Containment System Major Changes On-site Operation Requirements – Section 9.5 -242 (Continued) - Vapor Recovery System - No-bleed Valves - Thermo-oxidizer - Surface Casing Major Changes On-site Operation Requirements – Section 9.5 -242 (Continued) - Non-radioactive tracing or tagging additives - Security Cameras - Annual Meeting with the City Required Major Changes Other Sections - Non-radioactive tracing or tagging - Posting of Signage – Completion Phase PROPOSED CHANGES FROM THE 8/26/2011 WORKSESSION Proposed Changes (8/26) Page 1 Sec. 9.5-223. Variance procedure. 2(a). Takings Determination. Proposed Changes (8/26) Page 2 2(b). Takings Determination 3. Notification during an emergency. 4. Annual Certification of Plan 5. Proposed schedule for landscaping, screening and fencing Proposed Changes (8/26) Page Method that the operator proposes to use to notify the City of an emegency Cement Casing Program Site Lighting Plan Proposed Changes (8/26) Page 4 9. Assited Living and Nursing Care Facility Blow Out Prevention Continuous Video Data Surface Casing SETBACKS Setback Items to Discuss Habitable Structures (1,000 ft) Ignition Sources (300 ft) Perennial Stream, Pond or Wetland Freshwater Well (2,000 ft) Distance from a Public ROW (100 ft) Distance from a Fuel Source (300 ft) Environmentally Sensite Area Floodplain Public Parks Army Corp of Engineer Criticcal Stuctures QUESTIONS