Loading...
WS Item 4 Flower Mound ComparisonPage 1 Ordinance Comparison Regulation Southlake Flower Mound all property owners within 1,000 feet of the all property owners within 1,500 feet of the drill site 1 notification parcel boundary(s) that encompass the drill site, shall be notified within 30 days after the inspector's the pipeline and the proposed transportation determination. An informal public meeting is held route. for questions about the pending application. (p.34) at least one well permit application must well permit applications which comply with all 2 permit issuance accompany the required application for a SUP ordinance requirements are issued by the gas which requires City Council approval (p.11) inspector (p.33) A detailed evacuation plan addressing the An evacuation plan detailing all persons to be evacuation strategy for a public or private notified in the event of an evacuation, including, 3 evacuation plan school, hospital or daycare facility if any such without limitation, all persons residing within one- facility will be located within 1,250 feet of the half (1/2) mile (2,640 feet) of the edge of drill site. proposed drill site. (p.17) (p.29) general liability - $20,000,000.00 per occurance general liability - $25,000,000.00 per occurance 4 insurance with an annual general aggregate coverage of (p.55) $50,000,000.00 (p.22) excess or umbrella liability - $10,000,000.00 excess or umbrella liability - $50,000,000.00 5 insurance en v3onmental pollution liability - environmental pollution liability - $75,000,000.00 $20,000,000.00 (p.22) 6 insurance well control - $10,000,000.00 per occurance well control - $5,000,000.00 with no aggregate, with max deductible of $250,000.00 (p.23) otherwise $10,000,000.00 (p.56 & 57) 7 insurance worker's comp - $1,000,000.00 (p.23) worker's comp - $1,000,000.00 (p.57) 8 insurance auto liability - $20,000,000.00 (p.23) auto liability - $1,000,000.00 (p.57) Page 1 Page 2 Regulation Southlake Flower Mound 9 insurance sub -limit endorsement $500,000.00 (p.23) sub -limit endorsement $500,000.00 (p.57) Town /third -party air monitoring program in place. TCEQ air monitor at one of their fire stations. (p.5). In the event there are two (2) or more notices of violation during any twelve (12) month period, as 10 air monitoring continuous air testing requirements (p.28) determined by the Texas Commission on Environmental Quality or the United States Environmental Protection Agency, within thirty (30) days of the second notice of violation, the operator shall submit to the town an emissions compliance plan and vapor recovery may be required. soil sampling shall be conducted prior to the commencement of any drilling activities at the 11 Soil testing no comparison proposed drill site to establish a baseline study of site conditions. Post - drilling soil samples shall be collected and analyzed after the conclusion of drilling of each well (p.72). 12 noise our revisions have added regulations regarding basically the same with exception to pure tones pure tones (p.37 -40) (p.37 -39) 1,500 feet from any public park; residence; the property line upon which any religious institution; 1000 feet from any habitable structure, or from public building, hospital building or school is 13 setbacks the property line of any occupied public or located or for which a building permit has been private school or hospital. (p.26) issued on or before the date of the application for a drilling permit is filed; any habitable structure; any existing fresh water well (p.34 &35) Page 2 Page 3 Regulation Southlake Flower Mound no permits to drill in a floodplain without the 14 flood plain approval of the city and, where applicable, the no permits to drill within 750' of a floodplain (p.25) U.S. Army Corps of Engineers (p.26) pursuant to RRC standards, within 100 feet of 750 feet of any public street, road, highway or right 15 setbacks any public right of way and adjacent property of way line (p.35) line (p.33) 16 public park property no comparison no permits to drill shall be issued for wells within any public park (p.25) 17 setbacks no setback comparison 1,500 feet from any existing fresh water well (p.35) no permits to drill unless applicant submits written 18 federal public work setback no comparison approval from USACE verifying that proposed site is not located within 3,000 feet (p.31) all potential off -site sources of ignition shall be 500 feet from any existing storage tank, or source 19 setbacks setback a minimum distance of 300 feet from of potential ignition. (p.35) the pad site. .30 20 environmentally sensitive areas no setback requirement no permits to drill within 750' of an environmentally sensitive area (p.25) 21 notice of fracture stimulation notify inspector in writing 72 hours prior (p.41) notify inspector 10 business days prior; post sign at operations access road 3 business days prior (p. 23) operator shall submit notarized letter from 22 hazardous materials cleanup no comparison hazardous materials cleanup service company at time of application (p.29) Page 3