Item 4BCITY OF SOUTHLAKE MEMORANDUM (May 17, 2011) To: Shana Yelverton, City Manager From: Robert H. Price, P.E., Director of Public Works Subject: Approve Change Order No. 1 for the Kirkwood extension contract with Conatser Construction in the amount of $134,668.50. Action Requested: Approve Change Order No. 1 for the Kirkwood extension contract with Conatser Construction in the amount of $134,668.50. Background Information: The contract for the East Kirkwood Boulevard extension to East Highland Street was awarded to Conatser Construction by the City Council on November 2, 2010. Change Order No. 1 is for additional signage, striping, landscaping and re- mobilization. Gateway Church, in cooperation with the City of Southlake and Carroll Independent School District, agreed to build the section of East Kirkwood Boulevard adjacent to the new Carroll Middle School. Because of the City's construction project of the western section of East Kirkwood Boulevard, Gateway Church, with the permission of the City, deleted the striping and signing from their Kirkwood project and provided the funding to the City for the additional striping and signing to be added to the City's contract for Kirkwood. This actually created less striping and signage for both projects as it eliminated the need for transition striping and removal of transition striping. The additional landscaping and irrigation is to landscape the medians being constructed with this project. The remobilization cost is the cost the contractor incurred as a result of moving equipment back onto the site after removing it from the project site due to delays resulting from time lost while the City and CISD negotiated a land swap for needed right of way. The 12" reinforced concrete pipe (RCP) was installed as an interim drainage improvement. Change Order No. 1 also adds 30 calendar days to the contract. Financial Considerations: The total amount of Change Order No. 1 to the existing contract is $134,668.50. This will increase the construction cost to $1,068,592.25. Funds for construction of the project, including this change order, are budgeted in the FY2010 and FY2011 Capital Improvement Program. Strategic Link: The extension of East Kirkwood Boulevard from Blessed Way to East Highland Street links to the city's strategy map relative to the focus areas of Infrastructure and Performance Management and Service Delivery. The specific corporate objectives that are met by the construction of these improvements include: Providing travel convenience within City and Region; Providing High Quality Customer Service and Investing to provide and maintain high quality public assets. Citizen Input/ Board Review: None Legal Review: This is the Change Order form that has been previously reviewed by the City Attorney. Alternatives: The City Council may approve Change Order No. 1 or deny it. Supporting Documents: Location Map Change Order No. 1 Project Schedule: Change Order No. 1 adds 30 calendar days to the contract. Staff Recommendation: Approve Change Order No. 1 for the Kirkwood extension contract with Conatser Construction in the amount of $134,668.50. Staff Contact: Robert H. Price, P.E., Director of Public Works Gordon J. Mayer, Jr., P.E. Deputy Director of Public Works Steven D. Anderson, P.E. Civil Engineer Kirkwood Boulevard Extension Location Ma i HIGHLAND 5T. CGChC O R • - C� 1CRETE - V: r 1 1W tk a� '• LU it PC IL to O lt - -- .. r• CHANGE ORDER No. 1. Dated: May 17, 2011 OWNER'S Project No. R0040 Project: E. Kirkwood Boulevard E, Highland Street to Blessed Way OWNER Qhp o sOnthlake Contract for Paving 1111taroyetnents _ _ Contract Date: November 02. 2011 To: Conatser Consiniction R., L.P. Contractor You are directed to make the changes noted below in the subject contract for the dollar amount stated below including all labor, equipment, materials, overhead, and profit: Nature of the changes: The following adjustments to the current quantities of the current contract line Items shall be made. These changes reflect additional work performed during the constructlon. Quantity Revised Unit Total Item No. De Adjustment wantity unit Price Price Change 1 -A REMOBRIZATION 1 1 LS $7,500.00 $7,500.00 19 4" WHITE THERMOPLASTIC 1360 4,360 LF $1.00 $1,360.00 23 4' OBL YELLOW THERMOPLASTIC 810 4,710 LF $1.75 $1,417.50 24 24 'SOLID YELLOW THERMOPLASTI C 665 1,265 LF $7.00 $4,655.00 25 24' SOLID WHITE THERMOPLASTIC 72 1,572 LF $7.00 $504.00 30 TYPE 3 BARRICADES 2 2 EA $800.00 $1,600.00 31 ADOMONALSIGNAGE 1 1 L5 $5,0000.00 $5,000.00 72 INSTALL IRRIGATION SYSTEM (NEW) 1 1 LS $30 $30,065.00 72 IRRIGATION SYSTEM INSTALL (DEDUCT) I I LS ($20,000.00) ($20,000.00) 75 2 -SIDED REFLECTIVE MIRRORS 130 130 EA $4.DO $520.00 76 12" RCP 105 105 LF $26.00 $2,730.00 77 TREES — AUTUMN BLAZE MAPLE (3 GAL) 6 6 EA $324.17 $1,945.00 78 TREES — CHITALPA(3GAL) 24 24 EA $417.17 $10,01100 79 TREES— SAVANAH HOLLY (3GAL) 32 32 EA $373.91 $11,965.00 80 PLANTS — BELINDAS DREAM ROSE (5 GAL) I48 148 EA $45.57 $6,745.00 81 PLANTS — PURPLE PIXIE LOROPETAtUM (5 GAL) 515 515 EA $18.46 $9,505.00 82 PLANTS —ASIAN JASMINE 2277 2277 EA $3.96 $9,020.00 83 STAMPED COLORED 18" CONCRETE 4500 450D SF $10.25 $46,125.00 84 r IRRIGATION TAPS 2 2 EA $2,000.00 $4,000.00 Total $134,668.50 Page 1 of 3 These changes result in the following adjustment of contract price and contract time: Original Contract Price $ 933,923.75 Contract Price Including Previous Change Orders $ Net Increase Resulting from this Change Order 134 668.50 Current Contract Price $ 1.068.591.15 Contract Time Prior to this Change 270 calendar da s (Days or Date) Net Increase Resulting from this Change Order 30 calendar days (DAYS) Current Contract Time Including this Change Order 300 calendar days (Days or Date) The above changes are recommended: City ofSotithlake City _ B y: 5T6✓&. / A ✓e>�.e�ti.✓ fr—� Title: Pro'ect Mara er Date: Cify a Southlake CV o So thlake City City By: B �. Title: City Engineer Title: Direccra fuublic Works Date: Date: A Page 2 of 3 The above changes arc approved: City o Southfake city By: Title: Mayor Date: 1 2011 Conatser Corrstrrrciion R. L.P. Contra c or By: Date: . 40A- 4 _ _ _ 2011 Page 3 of 3