Item 4GCITY OF SOUTH LAKE MEMORANDUM July 27, 2011 To: Shana Yelverton, City Manager From: Chris Tribble, Director of Community Services Subject: Approve Change Order No. 15 with Dean Electric, Inc. in the amount of $55,221.21 for Bicentennial Park Phase I and ratify Change Orders Nos. 1 -14 in the amount of $230,847.06 Action Requested: City Council approval of Change Order No. 15 with Dean Electric, Inc. in the amount of $55,221.21 for Bicentennial Park Phase I and ratify previous Change Orders Nos. 1 -14 in the amount of $230,847.06. Background Information: The contract for construction of Bicentennial Park Phase I was awarded to Dean Electric, Inc. by the City Council on October 20, 2009. Subsequent change orders have been issued to implement additional improvements to the park. See attached itemized list of the improvements and costs included in Change Orders No. 1 -15. Current Change Order No. 15 in the amount of $55,221.21 is for additional signage, parking lot striping, irrigation zones and drainage improvements. Change Orders No. 1 -14, in the amount of $230,847.06 include additional water well features, masonry additions, installation of additional street light poles and fixtures, batting cages, additional irrigation and electrical systems and resurfacing of tennis courts and installation of wind screens. These additional improvements were not part of the original design for Phase I; however, as the project developed during the construction process several needs and opportunities arose where staff deemed it appropriate to initiate the additional improvements. For example, seven street light poles were replaced along the park boulevard near the new FM 1709 park entry to match the other Phase aesthetic improvements; while Dean was building the six new tennis courts we had them resurface five existing courts that were planned for FY 2010 as part of our annual court resurfacing program, thus saving the City money; an SPDC Matching Funds project was approved by City Council for batting cage City of Southlake Values: Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Shana Yelverton, City Manager City Council Meeting Date — August 2, 2011 Page 2 of 6 improvements; and in the case of Change Order No. 15, it is recommended that the irrigation system be extended to include the Shady Oaks Drive park frontage. Although these change orders have been reviewed and accepted by City administrative staff as received, staff is also requesting City Council ratification of Change Orders No. 1 -14 at this time. Financial Considerations: Funding for Change Orders No. 1 -15 is available in the CIP for the Bicentennial Phase I project budget. The original contract with Dean Electric, Inc. for improvements to Bicentennial Park Phase was awarded in the amount of $10,245,740. To date, including Change Order No. 15, the net change to the original contract amount is $286,068.27 (an approximate increase of 2.8 %), for a total of $10,531,808.27. Strategic Link: This item is linked to the City's Strategy Map related to the focus area of Quality Development and meets the corporate objectives to Provide Attractive and Unique Spaces for Enjoyment of Personal Interests and Invest to Provide and Maintain High Quality Public Assets. Citizen Input/ Board Review: City Council consideration August 2, 2011. Legal Review: The Change Order form has been previously reviewed by the City Attorney. Alternatives: Alternatives include: • Approve Change Order No. 15 and ratify Change Orders No. 1 -14. • Approve Change Order No. 15 with modifications as desired and ratify Change Orders No. 1 -14 • Decision to deny Change Order No. 15 Attachments: (A) Itemized List of Change Orders No. 1 -15 (B) Project Location Map City of Southlake Values: Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Shana Yelverton, City Manager City Council Meeting Date — August 2, 2011 Page 3 of 6 CHANGE ORDERS Bicentennial Park Phase Change Order No. 1 August 19, 2010 Resurface 5 (five) existing tennis courts $18,888.75 1080 ft. of 8 ft. wind screen 13,304.25 $32,193.00 Change Order No. 2 November 19, 2010 Controllers - Irrigation $ 6,220.00 GIC & Fee 9.5% 590.90 $ 6,810.90 Change Order No. 3 November 8, 2010 Proximity Locks $ 6,250.43 Change Order No. 4 November 11, 2010 Batting Cage 1) Excavate $ 4,000.00 2) Trucking 1,350.00 3) Concrete 32,600.00 4) Misc. Labor 3,000.00 5) Carpet 34,600.00 6) Carpet Installation 3,750.00 7) Install 6 Electrical Outlets 5,238.00 City of Southlake Values. Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Shana Yelverton, City Manager City Council Meeting Date — August 2, 2011 Page 4 of 6 Change Order No. 5 November 18, 2010 300 Linear ft. of Concrete Footing Masonry Excavation /dress -up G/C & Fee (9.5 %) Change Order No. 6 November 30, 2010 Three (3) Fountain Light Kits & $1,865 each G/C & Fee (9.5 %) Change Order No. 7 February 7, 2011 Three (3) Isolation Valves 8" Change Order No. 8 February 10, 2011 ADD: 21 ea. Field Markers Ice Machine (installed) Trash Receptacle Rain Bonnets Masonry raked joints Flashing at Structure Retaining Wall DEDUCT: Speed Bumps Demo Evans House Appliance Allowances Wind Screen Impact Fee Planter Borders WC DEDUCT $2,100.00 8,000.00 650.00 1,021.25 $11,771.25 $5,595.00 531.53 $6,126.53 $2,118.82 $ 2,682.75 5,582.67 4,085.44 10, 374.75 4,106.25 $26,831.86 $6,000.00 618.48 4,000.00 1,766.75 20, 708.00 11, 771.25 $44,864.48 ($18,032.62) City of Southlake Values. Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Shana Yelverton, City Manager City Council Meeting Date — August 2, 2011 Page 5 of 6 Change Order No. 9 January 22, 2011 Nine (9) Signs Re- stripe turn lane and add two (2) stop bars Change Order No. 10 March 7, 2011 Add carpet edging 12 ea. 10" x 10" rules signs 12 ea. 12" x 12" batting cage nos. Labor to install signs 4 ea. batting cage stop pads 20 ea. pads for four (4) posts and batting cages Labor to install pads Water well pressure release valve Water well pressure switch Change Order No. 11 March 24, 2011 Four (4) LED lights @ scorers tables Sub contractor mark up (9.5 %) 8 ft. of pipe with rings @ dugouts Two (2) Knox boxes @ gates Change Order No. 12 March 24, 2011 Furnish and install seven (7) Type P200 poles and fixtures Mark up (9.5 %) $ 349.85 1,642.50 $1,992.35 $ 985.50 427.50 427.50 87.60 1,752.00 2,409.00 87.60 273.75 930.75 $7,381.20 $1,708.00 162.26 2,150.00 785.00 $4,805.26 $57,314.00 5,444.83 $62,758.83 City of Southlake Values. Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Shana Yelverton, City Manager City Council Meeting Date — August 2, 2011 Page 6 of 6 Change Order No. 13 April 14, 2011 300 Linear ft. Concrete Footing $ 2,100.00 Masonry 8,000.00 Excavation / dress -up 650.00 G/C and Fee (9.5 %) 1,021.25 $11,771.25 Change Order No. 14 May 16, 2011 Add a double check at well $ 1,145.00 Grease interceptor (G 23 LO) 1,841.79 Three (3) compartment sink w /one drying rack 6,538.91 One (1) additional drying rack 336.16 Handrail modification at steps 500.00 $10,361.86 Change Order No. 15 July 19, 2011 Seven (7) signs to existing kiosk signs $2,402.03 Add three (3) street signs at stop sign 1,434.45 Re- stripe existing parking 4,998.67 Large toilet paper dispensers 1,131.13 Stainless condiment shelf 424.86 Permanent irrigation - sidewalk to trees (Evans house) 10,329.13 Permanent irrigation — Shady Oaks and sidewalks, 6 zones 19,574.22 Furnish and install air gap 4,450.00 Tennis court drainage 2,703.00 F & I No Left Turn sign 996.72 Drainage at west planters 6,560.00 Four (4) RL bollard keys 217.00 $55,221.21 Total Change Orders $286,068.27 Original Contract Amount $10,245,740.00 Percentage Increase to Original Contract (approx.) 2.8% New Contract Sum including Change Orders 1 -15 $10,531,808.27 City of Southlake Values. Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork Bicentennial Park Phase 1 SOUT 1LA,KE 1_I 1 �gC�p f •R`; '� 4 1Mi_. W %I PCwi