Item 4G Resolution No. 11-013, Approve a Local Transportation Project Advance Funding Agreement with TxDOT for Engineering review costs related to Phase 2 of FM1938 in the amount of $75,000
Item 4G
Requested Action
Approve Resolution No. 11-013 for a Local Transportation Project Advance Funding Agreement with TxDOT for Engineering review costs related to Phase 2 of FM1938 in the amount of $75,000
Background Information
FM1938 Phase 2
joint project between the City of Southlake, Keller, Tarrant County, TxDOT and the Regional Transportation Council (NCTCOG – RTC)
Southlake, Keller and Tarrant County
responsible for providing engineering design services and right of way to TxDOT for the FM1938 project
Background Information
FM1938 Phase 1
Construction is currently underway within the Town of Westlake
FM1938 Phase 2
4 lane roadway southward from the Randol Mill Bend
transition to a 6 lane roadway at Johnson Road
includes improvements to the intersection at Southlake Blvd. (FM1709)
The cost for TxDOT’s review of the engineering plans for FM 1938 Phase 2 is $75,000 and will be divided between the Cities of Southlake and Keller as follows:
Southlake – 78.7%* $59,025.00
Keller – 21.3%* $15,975.00
Total $75,000.00
*based on % of frontage on roadway
FM 1938 Phase 2
Financial Considerations
Funding for TxDOT’s review of the engineering design of FM 1938 Phase 2 is available in the FM 1938 CIP
Location Map
Questions:Bob Price (817) 748-8097