Loading...
Item 6A Approval of a Specific Use Permit for Oil & Gas Drilling Operations and Production at 1719 E Continental Blvd. Items 6A through 6D GAS10-001 Owner: Joe L. Wright Applicant: XTO Energy Inc. Request: Approval of a Specific Use Permit for Oil and Gas Drilling Operations and Production on approximately 3 acres located on one (1) parcel totaling approximately 31.5 acres. The applicant is proposing up to twenty-one (21) well heads. The Specific Use Permit section of the Zoning Ordinance requires that at least one (1) well permit and a pipeline permit as defined by Article IV, Chapter 9.5, of the City Code be provided in conjunction with the SUP request. AERIAL VIEW Site Plan for SUP Property Owners within 1000’ of Pad Site Tree Preservation Plan Operation Site Screening & Landscaping Erosion Control Plan Dust Mitigation Plan Water Source Plan Emergency Response Plan Evacuation Plan & Fire Lane Access Noise Mitigation Plan Transportation Route Proposed Pipeline Amended Route Variance Requests It shall be unlawful to drill a well, or to re-drill, deepen, re-enter, activate or convert any abandoned well, the center of which, at the surface of the ground, is located within 1,000 feet from any habitable structure, or from the property line of any occupied public or private school or hospital. (Sec. 9.5-242 (a)) (VARIANCE REQUEST SUBMITTED FOR SETBACK REQUIREMENT PER SEC. 9.5-223 (6)). Please note that the City Council will have to grant a variance for all future well heads that do not meet the setback requirements as part of this SUP. Variance Requests Three-pipe system. The three-pipe system to extract oil and gas shall be utilized. Water storage tanks shall not be permitted on the pad site except for oil and gas separators used during drilling and fresh water tanks used during fracturing. (Sec. 9.5-242 (aaa)) (VARIANCE REQUEST SUBMITTED FOR THREE-PIPE SYSTEM REQUIREMENT) Variance Requests Pipeline. All new or relocated unregulated pipelines within private residential areas shall be located within existing pipeline corridors within the city, unless the pipeline operator of the unregulated pipeline is able to demonstrate to the City Council that such alignment is feasible. (Sec. 9.5-293 (b)) (VARIANCE REQUEST SUBMITTED FOR ALIGNMENT REQUIREMENT) Variance Requests Pipeline. Operating any heavy equipment, machinery or apparatus used in any exterior or outdoor construction, repair, remodeling, demolition, drilling, excavation, grading, earth moving, paving, cement laying or pouring, or other work of any nature during the nighttime or anytime on Sunday within 1,000 feet of any residential property. (Ordinance 778, as amended, Chapter 11, Article III – Noise Nuisances, Section 11-61(c)(7)) (VARIANCE REQUEST SUBMITTED) Questions: Ken Baker – 748-8067