Loading...
Item 4CFort Worth Meter Station Modification Project – Change Order 5 Item 4C Requested Action Approve Change Order No. 5 with Legacy Contracting, Inc. in the amount of $21,720.00 for Fort Worth Meter Station Modification Project Project Location Background Information 1984 Water transmission line built from Fort Worth’s North Beach meter pump station Keller and Southlake to share ownership and cost 2005 Water transmission line built from Fort Worth’s Caylor pump station due to increased water demands Four existing meter stations to be upgraded Upgrades allow separate billing by Fort Worth Background Information 2008 Contract awarded to Legacy Contracting, LP for meter station upgrades Keller and Southlake funded cost of upgrades at their respective water meter stations Cities split cost of the upgrades at Fort Worth meter stations Proposed Change Order No. 5 Bid documents did not include final plans Contractor bid was based on outdated construction plans Delays/Costs associated with outdated set of plans Equipment rental Re-mobilization of crews Loss of revenue Financial burden determined to be $21,720 Financial Consideration Original Contract $776,867.00 Change Orders No. 1-4 $148,151.05 Change Order No. 5 $ 21,720.00 Total Contract Amount $946,738.05 Southlake’s portion of this change order is $5,243. Funds are available in project budget. Questions: Bob Price