Loading...
Item 4F Resolution No. 11-012, Authorize the city attorney to bring condemnation action for the purpose of obtaining street right of way and easements for construction and maintenance of North Kimball Avenue located in the Francis Throop Survey, Abstract 1511 at 1200 North Kimball Avenue Item 4F Requested Action Approve Resolution No. 11-012, Authorize the city attorney to bring condemnation action for the purpose of obtaining street right of way and easements for construction and maintenance of North Kimball Avenue from the property in the Francis Throop Survey, Abstract 1511 located at 1200 North Kimball Avenue Parcel location - 1200 North Kimball Avenue 0.816 acre (35,543 sf) right of way parcel along North Kimball Avenue and Highland Street, north of S.H.114 0.111 acre (4,830 sf) permanent utility, drainage and wall easement along North Kimball Avenue, north of Highland Street 0.289 acre (12,598 sf) temporary construction easement along North Kimball Avenue, north of Highland Street Required for widening of North Kimball Avenue Approve condemnation action for the purpose of obtaining street right of way and easements located in the at 1200 North Kimball Avenue Right of Way Exhibit Utility, Drainage and Wall Easement Exhibit Temporary Construction Easement Exhibit 1200 North Kimball Avenue Appraised value of the property Right of way $99,150.00 Utility, drainage and wall easement 24,203.00 Temporary Construction Easement 8,263.00 Improvements 15,787.00 Cost to cure 39,558.00 Total $186,961.00 1200 North Kimball Avenue The value of the improvements on the land being taken is as follows: Improvements* Concrete Paving $2,336.00 Asphalt Paving 3,536.00 Monument Sign 787.00 Large Pecan Tree 3,500.00 8’x8’ Planters 384.00 Shrubs, Trees & Ground Cover 1,500.00 Elevated Planter & Trees 1,500.00 Septic Tank 1,100.00 Sprinkler System 644.00 Landscaping 500.00 Total $15,787.00 *value of improvement, less depreciation 1200 North Kimball Avenue The costs to cure the damages (replacement costs) to the property are as follows: Cost to Cure** New parking, driveway, bumpers & striping $27,550. Convert septic to sewer 6,500. Sidewalk – new parking area to front of bldg. 1,605. Sprinkler System 346. 8’x8’ Planters 384. Monument Sign 338. Wood Fencing 2,835. Total $39,558. **cost minus value of item acquired Location Map 1200 North Kimball Avenue Questions: Bob Price (817) 748-8097