Item 4BNeighborhood Sanitary Sewer Project – Change Order 8 Item 4B Requested Action Approve Change Order No. 8 with North Texas Contracting, Inc. in the amount of $479,539.00 for additional utility and drainage improvements associated with the Neighborhood Sewer Program Project Location Heatherwood, Royal Oaks, Twin Creeks Sewer Line 8” Proposed Water line Background Information 2001 Completed preliminary design engineering for the neighborhood sewer project April 2008 Contract awarded for preparation of final plans and specifications Pavement reconstruction of the neighborhood streets and East Dove Road from Lonesome Dove Rd to Kimball Ave added 12” Water line along Dove Road – meets City’s water master plan requirements Sewer improvements along Pearson Road from Johnson Road to Gray Lane Water, sewer, storm, and paving improvements for Primrose Lane November 3, 2009 Construction contract awarded to North Texas Contracting, Inc. Proposed Change Order No. 8 3,600 linear feet of 8” water line along N. Kimball Ave from E. Dove Road to the City limit line Meets requirement of interlocal agreement with City of Grapevine dated July 9, 2009 Drainage Improvements (E. Dove Road / Hunter’s Creek) Improving Safety Conditions Drainage structure enclosed to provide a 3:1 slope and clear zone to remove potential hazard (steep ditch) for motorists along E. Dove Road Transportation safety standards for design speed along E. Dove Road require minimum 10 foot clear zone to remove guard rail Guard rail will be removed Improving aesthetics A total of 6 guard rails eliminated along E. Dove Road Quantity adjustments for original contract to date Proposed Change Order No. 8 Kimball 8” Water Line $ 367,070.00 Drainage Improvements $ 40,811.00 Quantity Adjustments $ 71,658.00 Total Change Order No. 8 $ 479,539.00 Financial Consideration Original Contract $3,748,737.54 Change Orders No. 1-7 $ 878,824.43 Change Order No. 8 $ 479,539.00 Total Contract Amount $5,107,100.97 Questions: Bob Price 817-748-8097