Item 7BCity of Southlake Department of Planning STAFF REPORT May 16, 2003 CASE NO ZA02 -110 PROJECT: Greenway Carroll Addition (Concept Plan) REQUEST: Greenway Carroll Partners, L.P. are requesting approval of a concept plan. ACTION NEEDED: 1. Conduct public hearing 2. Consider concept plan approval ATTACHMENTS: (A) (B) (C) (D) (E) (F) (G) Background Information Vicinity Map Plans and Support Information Concept Plan Review Summary Surrounding Property Owners Map Surrounding Property Owners Responses Full Size Plans (Ibr Connin and Council Menzbersv Only) STAFF CONTACT: Dennis Killough (481 -2073) Bruce Payne (481 -2036) Case No. ZA02 -110 BACKGROUND INFORMATION OWNER/APPLICANT: Greenway Carroll Partners, L.P. PURPOSE: The purpose of this request is to receive approval of a concept plan for the existing "C -3" zoning on the property. PROPERTY SITUATION: The property is located on the southeast corner of Carroll Avenue and State Highway 114. LEGAL DESCRIPTION: A portion of Tract IA, Richard Eads Survey, Abstract No. 481 LAND USE CATEGORY: Retail Commercial CURRENT ZONING: "C -3" General Commercial District HISTORY: -City Council approved a preliminary plat on March 21, 2000. -Final Plat for Lots 1 & 2, Block 1, Greenway- Carroll Addition was approved on November 8, 2001. The plat was never filed. TRANSPORTATION ASSESSMENT: Master Thoroughfare Plan The Master Thoroughfare Plan recommends State Highway 114 to have between 300' and 500' of right -of -way and N. Carroll Ave to be a 4 -lane, divided arterial street with 100' of right -of -way. Adequate right -of -way exists for State Highway 114. The applicant is dedicating adequate right -of -way for N. Carroll Ave. Existing Area Road Network and Conditions The proposed site will have two (2) accesses directly onto State Highway 114, two (2) accesses directly onto N. Carroll Ave, and two (2) accesses directly onto the proposed State Street. A common access easement has been provided to connect to the City property to the south. State Highway 114 is currently under construction and will be a 6 -lane, divided, limited - access freeway with frontage roads that will be 3 -lanes each. Completion is scheduled to be in November, 2003. N. Carroll Ave is currently a 2 -lane, undivided roadway. As part of the S.H. 114 construction, the intersection of N. Carroll Ave and S.H. 114 will be widened to 4 -lanes with a median. Case No. Attachment A ZA02 -110 Page 1 May, 2002 traffic counts on S.H. 114 (between N. Carroll Ave and Kimball Ave 24hr West Bound (WB) (28,553) East Bound (EB) (27,131) WB Peak A.M. (2,114) 7 — 8 a.m. Peak P.M. (2,381) 5 — 6 p.m. EB Peak A.M. (2,331) 7 — 8 a.m. Peak P.M. (2,176) 5 — 6 p.m. May, 2002 traffic counts on N. Carroll Ave (between S.H. 114 and F.M. 1709 24hr North Bound (NB) (4,566) South Bound (SB) (4,554) NB Peak A.M. (404) 8 — 9 a.m. Peak P.M. (373) 3 — 4 p.m. SB Peak A.M. (238) 8 — 9 a.m. Peak P.M. (472) 4 — 5 p.m. Traffic Impact Land Use Sq.Ft. / # positions Vtpd* AM- IN AM- OUT PM- IN PM- OUT Gas Station & Conv. store 16 2,604 218 209 265 265 Retail 23,170 2,590 41 26 115 124 Office 18,465 364 43 6 17 83 Bank w/ drive -in 4 1,562 54 41 127 127 Fast Food Restaurant 3,910 1,935 99 95 68 63 Total 9,055 455 377 592 662 *Vehicle Trips Per Day * *The AM/PM times represent the number of vehicle trips generated during the peak travel times on State Highway 114. WATER & SEWER: The site will connect water services to the existing 12" water line along the east side of N. Carroll Avenue. A 10" sewer extension is proposed from the east along S.H. 114. P &Z ACTION: May 8, 2003; Denied 6 -0 STAFF COMMENTS: Attached is Concept Plan Review Summary No. 6, dated May 2, 2003. The following variances need City Council approval: • Bufferyards — Bufferyards are required within and along the outer perimeter of all lot lines. The applicant is requesting that bufferyards along interior lot lines between proposed Lots 1 & 2, Block 1, be waived. • Stacking depth — A minimum of 75' is required on all driveways. The applicant is requesting a minimum of 40' stacking for all drives. M \Community Development\WP-FILES\MEMO\2002cases\02-1 I OCP.doc Case No. Attachment A ZA02 -110 Page 2 Vicinity Map Greenway Carroll Addition 1000 0 1000 2000 3000 Feet N Case No. ZA02 -110 E Attachment B Page 1 o O m ZONING: ("_ LUD RETAIL COMMERCIAL I I ' x, o �j IAL T �T I A 70NING: . . . . .. LU[)= _\z ------ IT uwltil, oI I �__�. � - -- -- I � — —\ , v IJ D C ER OFFICE OMNI CIAL --- ---------------------------------- TIIF I L T, IIAB 4 %OVINC zoMM, NRPI D ZONING: ('14 LUD=MIKED I '�E IUD USE LUD=N[[XED USE LOCATION MAP LOT-1 SITE DATA SUMMARY Exernazawo AF9A OF opmfiAtB ere CF P M�nYg LOTS — I BULCf PSCM­�CQVERAM _WAM__ _Em%MTJ=_D_�RAFf9lCi _ ww__ MAILYCM LOT-2 SITE DATA SUMMARY Exernazawo AF9A OF opmfiAtB ere PFflR3T A. QFBLWAcg-- — — I AFFA - -.Dt ..... Owl _Em%MTJ=_D_�RAFf9lCi _ OVERALL SITE DATA SUMMARY Exernazawo AF9A OF opmfiAtB ere PFflR3T A. QFBLWAcg-- — — I AFFA - -.Dt ..... _Em%MTJ=_D_�RAFf9lCi _ RECD MAY 0 2 Z093 o PHMY 1' GREBWAY CMROU / ROAD PARTNERS, 12. DAUA% wm & CONVENWE SPORE Am 11 - CONCEPT PLAN e —TH J L �- n k • ' . A_ MULIM TO: CITY OF SOUTHLAKF- Planning Department FROM: R. J. Grogan, Jr. For GREENWAY- CARROLL ROAD PARTNERS L.P. ( " Owner "} DATE: April 28, 2003 RE: CASE NO. ZA02 -110 and ZA02 -111 Zoning & Concept Plan RESPONSE TO COMMENTS AND REQUEST FOR MODIFICATION This Memorandum shall constitute Owner's formal request that: (i) Staff's comment regarding 75 -foot stacking depths on all driveways be modified to suggest instead a minimum 40 -foot stacking depth. While we believe that a 75 -foot stack.. is appropriate for regional mall and "town center" - type projects (such as Southlake Town Square), we do not agree that such a long stack is appropriate or necessary for a small -scale project of the type proposed for this site. These longer stacking depths would create extreme inef£rcieucies inn site coverage and traffic flow as well as compromise existing parking plans. Owner's efforts to retain mature trees required extraordinary efforts in request of driveway and parking locations; expanded stacking depths would likely diminish tree mitigation outcomes. (ii) Staff's comment regarding landscape buffer requirements for interior lot lines be waived and/or a variance granted for same. Though each lot will be submitted separately, the overall development has been .planned as an integrated project intending to comply with landscape requirements on an `overall" rather than "lot -by -lot" basis. Interior buffers would, in addition, render the site substantially less efficient from a use and value standpoint. This waiverlvariance will help to mitigate the negative efficiencies of the odd- shaped site. Owner respectfully requests favorable consideration of this proposal cc: Mike Twichell CAdlsys\sharedlgic11594\030428 memo city ofsouthlakempd Case No. ZA02 -110 Attachment C Page 2 Mtdti -erse Develo nient Traffic Impact p March 2003 Southlake, Texas Analysis Executive Summary The Greenway Investment Company is proposing a multi -use development located on the southeast corner of Carroll Avenue and SH -114 in Southlake, Texas (see Figure 1). The site is located on an 8.26-acre parcel of land. The proposed development will include a bank, gas station, fast food restaurant, and other building containing a combination of retail and office uses. The scenarios that were examined as part of the study were: • Year 2004 background traffic, without the freeway main lanes in place. Year 2004 background phis development traffic, without the freeway main lanes in place. Year 2004 background plus development traffic, with freeway main lanes in place. The scenarios in which the freeway main lanes are not yet constructed assume that the intersections at Carroll Avenue and the SH -114 frontage roads are complete. Traffic data for the study was collected at the study intersections for both the AM and PM peak periods. 24 -hour tube counts were also collected on Carroll Avenue, south of the SH -114, and on the eastbound lanes of SH -114, east of Carroll Avenue. Trips for the proposed development were generated based on the ITE Trip Generation Manual - Sixth Edition. The study intersections and driveways were analyzed using the Synchro traffic analysis software package. The intersections of Carroll Avenue and eastbound and westbound SH -114 were assumed to be signalized intersections with a cycle time between 90 to 120 seconds. LOS ratings for signalized and unsignalized intersections are for the intersection as a whole, and the delay figures represent the averao,e delay per vehicle. The driveway results are for the outbound direction of the driveway only, since all other movements are uncontrolled and therefore have no delay. The addition of the development traffic has minimal impact on the intersections of Carroll Avenue and eastbound and westbound SH -114, there is no need any mitigation at these intersections. However, there were poor operating conditions for the outbound traffic at Driveways A and B. The poor LOS ranking was due to the heavy left - turning volume from the driveways, which must wait for an available gap in both the north and southbound traffic on Carroll before completing the turn out of the driveway. Mitigation measure include the possible addition of a travel lane, in both the northbound and southbound direction of Carroll Avenue, between a point just south of Drive A and the SH -114 intersection. The addition of right -turn bays a Drive A and Drive B is also possible. The result is a LOS of D for the outbound movements at these two driveways. Innovative Transportation Solutions, Inc. -i - Case No. Attachment C ZA02 -110 Page 3 CONCEPT PLAN REVIEW SUMMARY Case No.: ZA02 -110 Review No.: Six Date of Review: 05/02/03 Project Name: Concept Plan — Beverage City (SEC Carroll & SH 114) OWNER: Greenway — Carroll Road Partners, LP Contact: Tommy Pigg 2808 Fairmount Suite 100, Dallas, Texas 75201 Phone : (214) 880 -9009 Fax J214) 880 -0188 ARCHITECT: Michael F. Twichell, LP Contact: Mike Twichell or Chris Boening 3624 Oak Lawn, Suite 320 Dallas, Texas 75219 Phone J214) 521 -3066 Fax : (214) 599 -0583 CITY STAFF HAS REVIEWED THE ABOVE REFERENCED PROJECT RECEIVED BY THE CITY ON 05/02/03 AND WE OFFER THE FOLLOWING STIPULATIONS. THESE STIPULATIONS ARE HEREBY MADE CONDITIONS OF CONCEPT PLAN APPROVAL UNLESS SPECIFICALLY AMENDED BY THE CITY COUNCIL. IF YOU HAVE ANY QUESTIONS OR NEED FURTHER CLARIFICATION, PLEASE CONTACT DENNIS KILLOUGH AT (817) 481 -2073. 1. The gas station with convenience store, as shown on the concept plan, requires approval of a Specific Use Permit (SUP) and a site plan by City Council. An application for the SUP and site plan has been submitted to the City (ZA02 -111). 2. Bufferyards are required within and along the outer perimeter of all lot lines. Bufferyards must be provided along interior lot lines between Lots 1 & 2 (5' — Type `A' each side). (A variance has been requested) 3. The following changes are needed regarding driveways: a) A minimum stacking depth of 75' is required on all driveways. The concept plan shows a minimum of 40' stacking for all drives. (A variance has been requested) b) Show the existing driveway for Lot 1, Block 1, Lakewood Acres on N. Carroll Avenue. The drive is offset to the north of the southern property line. 4. Relocate the Multi -use Trail located along N. Carroll Avenue into a 20' pedestrian access, utility and drainage easement to be dedicated along the western boundary of the site. This is to accommodate a future right turn lane to serve the two driveways accessing S. Carroll Ave. and the SH 114 Frontage Road. INFORMATIONAL COMMENTS * Sale of alcoholic beverages requires a specific use permit to be processed and approved by the Planning and Zoning Commission and the City Council. * This review is based on the "C -3" Zoning District Regulations. Case No. Attachment D ZA02 -110 Page 1 The applicant should be aware that prior to issuance of a building permit a Plat must be processed and filed in the County Plat Records, and a site plan, landscape plan, irrigation plan, and building plans, must be submitted for approval and all required fees must be paid. This may include but not be limited to the following fees: Park Fee, Perimeter Street Fee, Water & Sewer Impact and Tap Fees, and related Permit Fees. This site falls within the applicability of the residential adjacency standards as amended by Ordinance 480 -CC, Section 43, Part III "Residential Adjacency Standards" as well as the Corridor Overlay Zone regulations in Section 43, Part II. Although no review of the following issues is provided with this concept plan, the applicant must evaluate the site for compliance prior to submittal of the site plan. A Site Plan must be submitted and approved by the Planning and Zoning Commission and City Council prior to issuance of a building permit. Note that these issues are only the major areas of site plan review and that the applicant is responsible for compliance with all site plan requirements: • Masonry requirements per §43.13 a, Ordinance 480, as amended and Masonry Ordinance No. 557, as amended. • Roof design standards per § 43.13b, Ordinance 480, as amended • Mechanical Equipment Screening per § 43.13c, Ordinance 480, as amended. • Vertical and horizontal building articulation (required on all building facades) per §43.13d, Ordinance 480, as amended. • Building setback standards as per § 43.13h and as shown in exhibit 43 -E, Ordinance 480, as amended. • Off - street parking requirements per §35, Ordinance 480, as amended. All areas intended for vehicular use must be of an all weather surface material in accordance with the Ordinance No. 480, as amended. • Screening as per §39.4, Ordinance 480, as amended. • Interior landscaping per Landscape Ordinance No. 544. • Fire lanes must be approved by the City Fire Department. • Site must comply with the Outdoor Lighting Ordinance No. 639 -B. Case No. ZA02 -110 Attachment D Page 2 Surrounding Property Owners Greenway Carroll Addition Case No. ZA02 -110 Attachment E Page 1 Owner Zoning Land Use Acreage 1. State of Texas 1. AG 1. Retail Commercial 1. 2.65 2. State of Texas 2. NRPUD 2. Mixed Use 2. 7.35 3. PKB Enterprises 3. DT 3. Town Center 3. 1.30 4. State of Texas 4. DT 4. Town Center 4. 0.10 5. The Fechtel Group 5. DT 5. Town Center 5. 30.8 6. City of Southlake 6. CS 6. Town Center 6. 2.68 7. Carroll Partners LLC 7. 01 7. Office Commercial 7. 2.89 8. Authentex Dev. Ltd. 8. 01 8. Office Commercial 8. 1.21 9. R. Morris 9. 01 9. Office Commercial 9. 1.03 10. Roadway Properties, Inc. 10. C2 10. Retail Commercial 10. 1.85 11. State of Texas 11. C3 11. Retail Commercial 11. 0.30 12. Greenway Carroll Rd 12. C3 12. Retail Commercial 12. 10.0 Partners Case No. ZA02 -110 Attachment E Page 1 Surrounding Property Owner Responses Greenway Carroll Addition Notices Sent: Eight (8) Responses: None Case No. ZA02 -110 Attachment F Page 1