Loading...
Item 4I AudioSOUTHLAKE 1 5 Item 41 Approve Addendum A to the North Park Professional Services Agreement w/ Schrickel Rollins and Associates, Inc. for $71,300 Integrity Innovation Accountability Chris Tribble Commitment to Excellence Director of Community Services Teamwork 1 Requested Action • City Council approval of Addendum A to the PSA with SRA in the amount of $71,300 • Addendum A is necessary for SRA to complete the scope of services (engineering and design) for North Park U SOUTHLAKE PSA Services include: Pre - Design Phase, Concept Design Phase, Construction Document Phase, Construction Bidding Phase, and Construction Observation and Administration Phase F Background • Multiple public meetings held since 2009 — SPIN — Individual Residents & HOA — Planning & Zoning — Parks Board — SPDC — City Council • During Site Plan approval process, scope of project and corresponding construction budget expanded significantly • Staff worked w /SRA to finalize concept design and construction documents, and to bid the project 0 SOUTHLAKE 3 Background • Original SRA Basic Services Fee of $413,700 approved in PSA June 2009 • Site Plan Approval process for the project increased scope of the project and corresponding construction budget significantly • Terms of the PSA states Basic Services Fee to be increased or decreased proportionally if the budget authorized by the City is different from the budgeted amount listed in PSA U SOUTHLAKE 0 Additional Information • Components that would have been constructed with DPS Facility are included in the North Park Project — Required entry drive, decel lane, sidewalk at Dove Road, drainage improvements, outfall structures, pond wall, excavation, site grading • Dean Construction, CMR for North Park, will construct these elements during park construction ®SOUTHLAKE Since DPS North Facility Project was placed on hold, staff has been working with the design /engineer firm (Cheatham & Assoc) for the DPS North Facility Project to include these items that would have been constructed with the DPS project, into the North Park Project. 5 0 Financial Considerations NORTH PARK PROJECT BUDGET SUMMARY: SPDC CIP Funding $6.666.000.00 CCPD CIP Funding 5517.930.87 Total Project Funding $7.183.930.87 SPDC Project Cost ' $6.598.880.79 CCPD Project Cost 5517.930.87 Total Project Cost $7.116.811.66 Amount Under Budget 1 $67.119.21 m •Includes Engineering, Design & Construction Costs U SOUTHLAKE Additional Information • Staff recommends approval of Addendum A to the PSA • SPDC and Parks Board will consider at Joint SPDC /Parks Board meeting February 15, 2011 ®SOUTHLAKE R SOUTHLAKE 1 5 Questions? Integrity Chris Tribble Innovation (817) 748 -8021 Accountability Commitment to Excellence Teamwork 9