Item 4HCITY OF SOUTH LAKE MEMORANDUM February 8, 2011 To: Shana Yelverton, City Manager From: Chris Tribble, Director of Community Services 4H -1 Subject: Approve Guaranteed Maximum Price with Dean Electric, Inc. dba Dean Construction in the amount of $6,631,811.66 for Construction of North Park Action Requested: Approve Guaranteed Maximum Price with Dean Electric, Inc. dba Dean Construction in the amount of $6,631,811.66 for construction of North Park. Background Information: June 16, 2009 - The City Council approved professional services contract with Schrickel Rollins and Associates (SRA) to design the North Park multi - purpose field complex. November 9, 2009 — SPIN meeting was held to present site plan concept to residents. February 8, 2010 — Concept and Site Plan were reviewed and approved by Parks & Recreation Board. February 18, 2010 — Site Plan and variances requests were reviewed and approved by Planning and Zoning. May 18, 2010 - Site Plan and variances requests were reviewed and approved by City Council. June 23, 2010 and June 30, 2010 - Working with SRA, the City advertised Requests for Proposals for Construction Manager at Risk (CMR). July 16, 2010 - A CMR pre - proposal meeting was held. July 30, 2010 — CMR proposals were received and opened. A review committee recommended Dean Construction to the Parks & Recreation Board, Southlake Parks Development Corporation (SPDC) and City Council. 4H -1 City Council Meeting Meeting Date — February 15, 2011 Page 2 of 4 4H -2 October 11, 2010 - The Parks and Recreation Board recommended approval of professional services agreement with Dean Construction to City Council. November 2, 2010 — SPDC and City Council approved the Construction Manager at Risk contract with Dean Construction. December 19, 2010 and December 26, 2010 - Dean Construction advertised for construction bids. January 19, 2011 - Bids were opened and GMP established. The City Council adopted Resolution No. 09 -004 that delegates to the City Manager the authority to determine the construction method that is the best value for the City. The Construction Manager at Risk (CMR) was chosen for this project to obtain the highest level of quality and efficiency. The CMR approach entails hiring a construction management firm that acts as a project consultant and general contractor. The construction management firm is bound to an agreed guaranteed maximum price (GMP) that is determined from actual advertised bids received. The CMR is paid based on a percentage of the cost of the work. The CMR can also bid to self perform a portion of the work. The CMR approach gives the owner opportunity, before the GMP is established, to make adjustments in scope and value engineer if the bidding numbers appear to exceed the established budget. Overall, the CMR approach, because of its flexibility, ensures better cost control and quality. Financial Consideration: The overall SPDC CIP project budget for North Park is $6,666,000. The overall CCPD CIP project budget for the portion of the DPS North project being built by Dean Construction is $517,930.87. The total funding allocated for the project is $7,183,930.87. The original engineering and design fee for Schrickel Rollins and Associates was $413,700. Based on the increased scope of work of the project, Addendum A increases the design fee $71,300 for a total of $485,000. 4H -2 City Council Meeting Meeting Date — February 15, 2011 Page 3 of 4 4H -3 Based on the bids received for the current scope of work, the total construction GMP cost is $6,631,811.66. The SPDC CIP budget will fund $6,113,880.79 of the construction cost and the CCPD CIP (DPS North project funding) will fund $517,930.87 of the construction cost. The portion of the project work that is shared with the adjacent DPS development includes the entry drive, deceleration lane, sidewalk along Dove Rd. adjacent to the DPS facility, drainage improvements including pond excavation and pond wall, and grading. NORTH PARK PROJECT BUDGET SUMMARY: SPDC CIP Funding $6,666,000.00 CCPD CIP Funding $517,930.87 Total Project Funding $7,183,930.87 SPDC Project Cost * $6,598,880.79 CCPD Project Cost $517,930.87 Total Project Cost $7,116,811.66 Amount Under Budget $67,119.21 *Includes Engineering, Design & Construction Costs Strategic Link: This item is linked to the City's Strategy Map related to the focus area of Quality Development and meets the corporate objectives to Invest to Provide and Maintain High Quality Public Assets and to Provide Attractive and Unique Spaces for Enjoyment of Personal Interests. Citizen Input/ Board Review: Several public meetings have been held since 2009 including: ➢ SPIN Meeting ➢ Parks & Recreation Board Meetings ➢ SPDC Meetings 4H -3 City Council Meeting Meeting Date — February 15, 2011 Page 4 of 4 ➢ Planning & Zoning Meeting ➢ City Council Meetings Legal Review: The attached agreement has been previously reviewed and approved by the City Attorney. 4H -4 Alternatives: Alternatives may include: • Approve Guaranteed Maximum Price amendment with Dean Construction as presented • Approve Guaranteed Maximum Price amendment with Dean Construction with input as desired • Not approve Guaranteed Maximum Price amendment. Supporting Documents: • Al21 CMc Amendment establishing Guaranteed Maximum Price (GMP) • Bid Tabulation (included with contract) Staff Recommendation: Approve Guaranteed Maximum Price with Dean Electric, Inc. dba Dean Construction in the amount of $6,631,811.66 for construction of North Park. 4H - 4 =�~ Document Al 21 CMc — 2003 Amendment No. 1 TO AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER 4H -5 Pursuant to Section 2.2 of the Agreement, dated January 20, 2011 between the City of Southlake (Owner) andDean Stec Inc dba Dean Consti(the Construction Manager), for No park (the Project), the Owner and Construction Manager establish a Guaranteed Maximum Price and Contract Time for the Work as set forth below. ARTICLE I GUARANTEED MAXIMUM PRICE The Construction Manager's Guaranteed Maximunn Price for the Work, including the estimated Cost of the Work as defined in Article 6 and the Construction Manager's Fee as defined in Article 5, is six million sir hundred thirty thousand eight hundre eleven doll sixty - six aen"011ars($6,631_811_66 This Price is for the performance of the Work in accordance with the Contract Documents listed and attached to this Amendment and marked Exhibits A through F, as follows: Exhibit A Drawings, Specifications, addenda and General, Supplementary and other Conditions of the Contract on which the Guaranteed Maximum Price is based, pages 1 through 11 , dated 12/20/2010 Exhibit B Allowance items, pages 1 through l , dated 12/20/2011 Exhibit C Assumptions and Clarifications made in preparing the Guaranteed Maximum Price, pages 1 through 1 , dated 12/20/2011 Exhibit D Completion Schedule, pages 1 through 1 , dated 12/20/2011 Exhibit E Alternate Prices, pages N/A through , dated Exhibit F Unit Prices, pages N/A through , dated ARTICLE 2 CONTRACT TIME The date of Substantial Completion established by this Amendment is: February 28, 2012 OWNER (Signature) (Printed name and title) Date ATTEST CONSTRUCTION MANAGER (Signature (Printe name and title) J a nuary 20, 2011 FJ pr III 11W0410 CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AIA Document Al21 TmCMc — 2003 and AGC Document 565. Copyright 071991 and 2003 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Ale Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright @aia.org. 4H -6 a an m a � 0 0 INDEX OF DRAWINGS COVER r/ INDEX SHEET INDEX Y 01 PLAT ✓ . ✓ LANDSCAPE L1.00 EXISTING CONDITIONS AND REMOVAL - OVERALL ✓ �/ ✓ ,/ L1.01 EXISTING CONDITIONS AND REMOVAL - AREA "A" v/ N/ ✓ ✓ L1.02. EXISTING CONDITIONS AND REMOVAL - AREA "B" N/ 7vv `/ L2 CONSTRUCTION LAYOUT - OVERALL ✓ V v/ L2.01 CONSTRUCTION LAYOUT - AREA "A" `/ NT � L2.02 CONSTRUCTION LAYOUT - AREA '"B" ✓ �/ L2.03 CONSTRUCTION LAYOUT - PLAZA ENLARGEMENT ✓ V L300 GRADING PLAN - OVERALL ti/ L3.01 GRADING PLAN - AREA "A" ✓ L3.02 GRADING PLAN - AREA "B" L3.03 GRADING PLAN - PLAZA ENLARGEMENT �/ ✓ `/ �/ `/ L400 PAVING & JOINTING PLAN - OVERALL �/ ✓ ✓ �/ L4.01 PAVING & JOINTING PLAN - AREA "A" �/ �/ �/ �/ ✓ L4.02 PAVING & JOINTING PLAN - AREA " B " L4.03 PAVING & JOINTING PLAN - PLAZA ENLARGEMENT �/ ✓ ✓ L5.00 LANDSCAPE PLAN - OVERALL ✓ ` / ✓ ✓ LS -01 LANDSCAPE PLAN - AREA "A" rI rI `I ✓ 1.5.02 LANDSCAPE PLAN - AREA "B" rI +� ✓ ✓ �I L5.03 LANDSCAPE PLAN - PLAZA ENLARGEMENT �/ ✓ �/ ✓ L5.04 LANDSCAPE DETAILS & ENLARGEMENTS `/ ✓ ✓ ✓ �I L5.05 LANDSCAPE DETAILS �/ ✓ ✓ ✓ �/ L6.00 SITE DETAILS - GENERAL ✓ ✓ L6.01 SITE DETAILS - ACCESSIBILITY ' ✓ ✓ L6.02 SITE DETAILS - FENCES ✓ ✓ L6.03 SITE DETAILS - GENERAL L604 SITE DETAILS - GENERAL r ✓ ✓ ✓ ✓ L6.05 SITE DETAILS - ENTRANCE SIGN ✓ ✓ ✓ �/ �/ L6.06 SITE DETAILS -GENERAL �/ �/ ✓ ✓ L6.07 SITE DETAILS - DUMPSTER �/ ✓ ✓ ✓ 1-7.00 PLAYGROUND EN LARGEMENTS 4H -6 S1.00 GENERAL NOTES bE {, p a pp Ftt , 5200 Ln V ✓ F Q LOWER LEVEL STRUCTURAL WALL PLAN IND O F DRAWINGS ✓' IRRIGATION 52.02 LEVEL ONE FOUNDATION AND STRUCTURAL SLAB PLAN �/ ✓ . s/ IR1.01 IRRIGATION PLAN - AREA "A" �/ �/ ✓ ✓ IR1.02 IRRIGATION PLAN - AREA "B" �/ �/ ✓ �/ IRIL03 IRRIGATION DETAILS ✓ �/ �/ �/ �/ CIVIL 00.00 GENERAL NOTES �/ ✓ f �/ CI-00 WATER LAYOUT ✓ ✓ ✓ 01.01 WATER DETAILS `/ ✓ Cl-02 UTILITY EMBEDMENT DETAILS ✓ �/ 0200 SANITARY SEWER PLAN PROFILE N7 0201 SEWER DETAILS ✓ �/ �/ �/ 03.00 DRAINAGE AREA MAP AND CALCULATIONS J �/ ✓ �/ ✓ 03.01 STORM DRAIN PLAN PROFILE ✓ J ' _ C3.02 STORM DRAIN LATERALS ✓ C3.03 STORM DRAIN DETAILS �/ ✓ ✓ `/ C4.00 EROSION CONTROL ✓ �/ 0401 EROSION CONTROL DETAILS �/ ✓ 05.00 IRRIGATION WATER SUPPLY CA1.01 GRADING PLAN - ENTRANCE DRIVE ✓ r+/ ✓ CA2.01 DRAINAGE AREA MAP - STORM DRAIN CA2.02 DRAINAGE AREA MAP - POND ,/ ✓ �/ CA203 STORM DRAIN CALCULATIONS ✓ �/ CA2.04 STORM DRAIN PLAN & PROFILE - LIN€ W (STA 0 +00 to 5+00) ✓ J CA2.05 STORM DRAIN PLAN & PROFILE - LINE W (STA 5+00 to 8+08.25) Nf ✓ ✓ CA2.06 STORM DRAIN PLAN & PROFILE - LINE V (STA 0+00 to 1+91) �/ ✓ `/ CA2.07 STORM DRAIN PLAN & PROFILE - LINE'C (STA 0+00 to 4#0t64) ✓ `/ ✓ CA301 POND OUTLET DETAIL ✓ CA3.02 TxDOT SINGLE BOX CULVERT DETAIL v7v ✓ CA3.03 TxDOT MULTIPLE BOX CULVERT DETAILS �/ ✓ �/ �/ CA3.04 TxDOT HEADWALL DETAIL ✓ ✓ ✓ ✓ CA3.05 TxDOT SAFETY & TREATMENT DETAILS ✓ �' CA306 SOUTHLAKE STANDARD DETAILS CA3.07 SOUTHLAKE STANDARD DETAILS STRUCTURAL S1.00 GENERAL NOTES , 5200 LOWER LEVEL V ✓ 52.01 LOWER LEVEL STRUCTURAL WALL PLAN ✓ ✓' 52.02 LEVEL ONE FOUNDATION AND STRUCTURAL SLAB PLAN �/ ✓ . s/ 4H : -7 4H -8 Ga e � � S G0 IND EX OF DRAW A&01 OVERALL SECTIONS A&02 SECTIONS A603 DOOR AND WINDOW DETAILS A6.04 DOOR DETAILS A7.01 A7.02 DETA ILS & SECTIONS DETAILS & SECTIONS yl J A7.03 ROOF DETAILS v / A7.04 ROOF DETAILS J J J A7.05 DETAILS v/ ; A7.06 A8.01 DETAILS INTERIOR ELEVATIONS - CONCESSION A9.00 3D VIEWS FOR REFERENCE ONLY MECHANICAL, ELE(:TRICAL - & PLUMBING M1.01 LOWER LEVEL MECHANICAL FLOOR PLAN M1.02 UPPER LEVEL MECHANICAL FLOOR PLAN E1.01 SITE PLAN ELECTRICAL J J J J J E1.02 SITE PLAN ENLARGEMENT - PLAZA ELECTRICAL E2.01 SITE PLAN SPORTS LIGHTING E301 E4.01 ELECTRICAL SCHEDULES ELECTRICAL DETAILS J J J J J J J J J E5.01 ELECTRICAL DETAILS J EB1.01 FLOOR PLAN LIGHTING EBZ01 FLOOR PLAN CONCESSION BUILDING POWER P1.01 LOWER LEVEL PLUMBING FLOOR PLAN P102 UPPER LEVEL PLUMBING WASTE. PLAN PI-03 UPPER LEVEL PLUMBING WATER PLAN J J J P1.04 PLUMBING ISOMETRICS 4H -8 [1 n G' SECTION 00 0030 PROJECT MANUAL TABLE OF CONTENTS VOLUME 1 OF 2 DIVISION 0 - INTRODUCTORY INFORMATION 000010 - Title Page 000020 - Certification Page 000030 - Table of Contents BIDDING ADMINISTRATION n G 1 000300 - Advertisement for Bids 001000 - Instructions to Bidders 002000 - Geotechnical Data 003000 - Bid Form 004000 - Bid Bond 004100 - Equal Opportunity Clause 004150 - Contractor Qualifications 004700 - Performance Bond 004800 - Payment Bond 004900 - Maintenance Bond 005000 - Certificate of Insurance 006500 - Blanket Subcontractor Agreement CONDITIONS OF THE CONTRACT .007000 - General Conditions of the Contract for Construction (AIA Doc. A201 -2007) 008210 - Storm Water Pollution Prevention Plan 00 8220 - Temporary Erosion, Sediment and Water Pollution Control 008230 - Labor Classification and Minimum Wage Scale 008250 - State and Local Sales and Use Taxes 009000 - Addenda DIVISION 1 - GENERAL CONDITIONS 01 1000- Summary of the Work 01 2100 - Allowances 012200 - Unit Prices 01 2300- Alternates 01 2500 - Contract Modification Procedures 01 2513 - Substitution Procedures 012900 - Payment Procedures 01 3100 - Project Meetings, Management and Coordination 01 3233 - Photographic Documentation 01 3300 - Submittal Procedures 01 4100 - Testing Laboratory Services 01 5100 - Temporary Utilities and Facilities 01 5800 - Project Signs 01 6000 - Product Requirements 01 6300 - Substitutions and Product Options 017300 - Execution 01 7329 - Cutting and Patching 017400 - Cleaning Up 01 7700 - Closeout Procedures 4H -9 PROJECT MANUAL TABLE OF CONTENTS 4972 00 0030 -1 4H -10 DIVISON 2 - EXISTING CONDITIONS 024119 - Selective Structure Demolition DIVISION 3 - CONCRETE 03 3000 - Cast -in -Place Concrete 042000 - Unit Masonry 044200 - Exterior Stone Cladding 04 4300 - Stone Masonry DIVISION 5 - METALS 051200 - Structural Steel Framing 053100 - Steel Decking 054000 - Cold- Formed Metal Roofing 055000 - Metal Fabrications 055210 - Handralls and Guardrails 055213 - Pipe and Tube Railings 057300 - Decorative Metal Railings DIVISION 6 - WOOD, PLASTICS AND COMPOSITES 06 1000 - Rough Carpentry 06 1600 - Sheathing 064116 - Plastic Laminate -Faced Architectural Cabinets DIVISION 7 - THERMAL AND MOISTURE PROTECTION 071326 - Se[f Adhering Sheet Waterproofing 071913 - Graffiti Resistant Coatings 072100 - Thermal Insulation 07 3113 - Asphalt Shingles 074113 - Metal Roof Panels 077100 - Roof Specialties 077200 - Roof Accessories 078413 - Penetration Firestopping 079200 - Joint Sealants �7[�1�3 [7 ►>Fc��] � �►11 �L� 081113 - Hollow Metal Doors and Frames 083323 - Overhead Coiling Doors 085413 - Fiberglass Windows 087100 - Door Hardware 088000 - Glazing 089000 - Louvers PROJECT MANUAL TABLE OF CONTENTS 4972 000030-2 4H -11 DIVISION 9 - FINISHES 09 2400 - Portland Cement Plaster 096723 - Resinous Flooring o99113 - Exterior Painting 099121 - Interior Painting 099300 - Staining and Transparent Finishing 099600 - High - Performance Coatings DIVISION 10 -SPECIALTIES 10 1400 - Signage 101550 - Toilet Compartments 102800 - Toilet, Bath and Laundry Accessories 104416 - Fire Extinguishers 10 7500 - Flagpoles VOLUME 2 OF 2 DIVISION 22 - PLUMBING 220500 - General Requirements, Mechanical 220610 - Project Closeout 220520 - Basic Materials and Methods, Mechanical 220521 - Piping Systems 220523 - Valves 220529 - Foundations, Hangers, and Supports 22 0553 - Mechanical Identification 220700 - Mechanical Insulation 221000 - Plumbing 224200 - Plumbing Fixtures DIVISION 23 - HVAC 230500 - General Requirements, Mechanical 230510 - Project Closeout 230520 - Basic Materials and Methods, Mechanical 230521 - Piping Systems 230529 - Foundations, Hangers, and Supports 230548 - Vibration Control 230553 - Mechanical Identification 230593 - Test- Adjust - Balance 230700 - Mechanical Insulation 232300 - Refrigerant Piping 233100 - Air Supply and Distribution 233400 - Fans 233700 - Grills, Registers, and Diffusers 236213 - Air Source Heat Pumps Outdoor Units, Split System 237339 - Air Source Heat Pumps Indoor Units, Split Systems 238239 - Unit Heaters DIVISION 26 - ELECTRICAL 260500 - Common Work Results for Electrical 260519 - Low - Voltage Electrical Power Conductors and Cables 26 0526 _ Grounding and Bonding for Electrical Systems PROJECT MANUAL TABLE.OF CONTENTS 4972 000030-3 4H -12 260529 - Hangers and Supports for Electrical Systems 260533 - Raceway and Boxes for Electrical Systems 260563 - Identification for Electrical Systems 260573 - Overcurrent Protective Device Coordination Study 260923 - Lighting Control Devices 262200 - Low - Voltage Transformers 262416 - Panelboards 262726 - Wiring Devices 262813 - Fuses 262816 - Enclosed Switches and Circuit Breakers 264113 - Lightning Protection for Structures 265100 - Interior Lighting 265600 - Exterior Lighting 265668 - Exterior Athletic Lighting DIVISION 27 — COMMUNICATIONS 271100 - Communications Equipment Room Fittings DIVISION 28 — ELECTRONIC SAFETY AND SECURITY 283111 - Digital, Addressable Fire -Alarm System DIVISION 31 - EARTHWORK 31 1000- Site Preparation 31 1500 - Tree Protection and Trimming 31 2000 - Earthwork 31 2100 - Fine Grading 31 2200 - Lime Treated Subgrade 31 2250 - Cement Treated Subgrade 31 2300 - Trench Safety Systems 31 2320 - Dewatering 31 2333 - Excavation, Backfilling and Compacting for Utilities 31 2730 - Temporary Straw Bale Dike 31 2740 - Silt Fence 31 2750 - Stabilized Construction Entrance 31 2770 - Inlet Protection 31 6329 - Drilled Concrete Piers and Shafts DIVISION 32 - EXTERIOR IMPROVEMENTS 320116 - Flexible Paving Repair 321129 - Lime Treated Base Courses 321316 - Imprinted and Colored Concrete Paving 321310 - Concrete Formwork 321320 - Concrete Reinforcement 321330 - Site Concrete Paving 321340 - Concrete Paving for Sidewalks 321345 - Multi- Purpose and Nature Trails 321360 - Chemical Staining of Concrete Surfaces 321370 - Caulking and Sealants 321380 - Pavement Markings and Signs 321540 - Stabilizer For An Aggregate Pathway — Pedestrian Access 3? 2000 - Miscellaneous Outdoor Equipment PROJECT MANUAL TABLE OF CONTENTS 4972 000030-4 4H -13 322100 - Bleacher Seating 328400 - Landscape Irrigatlon System 329200 - Turfgrass Planting Ornamental Grasses and Ground Cover Planting 32 9300 - Shrubs, 329400 - Tree Planting DIVISION 33 - UTILITIES 331200 - Water Supply System 331210 - Water Meter Installations 331219 - Fire Hydrant Installation 332100 - Paluxy Water Well 332101 - Submersible Well Pump 332102 - Water well Controls, Electrical and Instrumentation 333100 - Sanitary Sewer 334100 - Underground Storm Sewer and Appurtenances 334110 - Polyvinyl Chloride Pipe Storm Drains 334216 - Concrete Culverts 334600 - Subdrainage 334710 - Pond and Reservoir Liners DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION 354330 - Rock Rip -Rap PROJECT MANUAL. TABLE OF CONTENTS 4972 000030-5 4H -14 ADDENDUM NO.ONE ADDENDUM NUMBER ONE NORTH PARK CITY OF SOUTHLAKE, TEXAS ISSUED BY: Schrickel, Rollins and Associates, Inc. 1. This addendum modifies and extends the requirements of the plans and /or the project manual for the above referenced project, dated December 2010. 2. Staple these addenda to the inside of the rear cover of the project manual or bind it into the project manual at the end of the Bid Form. 3. Note receipt of all addenda on the Bid Form. ISSUE DATE: January 6, 2011 BID DATE: January 17, 2011 S a�c v a 1� � (P .�OF� PROJECT MANUAL / r3� • II 1.00 LEGAL NOTICE- ADVERTISEMENT FOR BIDS A. Change the day the bids are to be received from Monday, January 17, 2011 to Wednesday, January 19, 2011. 1.01 SECTION 01 2300 — ALTERNATES A. Page 012300-2, subparagraph 3.01, add the following: G. Alternate No. 6— Additive Alternate: Add 12' -0" wide GrassPave2, or approved equal, in lieu of (2) 4' wide sidewalks per manufacturer's recommendation. 1.02 SECTION 221000 — PLUMBING A. Page 22 1000 -4, subparagraph. 2.02 E. Trap Primer: Delete in its entirety and insert the following: "1. Trap primer shall be Proset TrapGuard, Quad Close, or SureSeal." 1.03 SECTION 28 3111 — DIGITAL, ADDRESSABLE FIRE -ALARM SYSTEM A. Delete this Section in its entirety and delete the Section from the PROJECT MANUAL TABLE OF CONTENTS, SHEET 00 0030 -4. 1.04 SECTION 32 2000 — MISCELLANEOUS OUTDOOR EQUIPEMENT A. Page 32 2000 -2, subparagraph 3.01, C, Park Benches, Trash Receptacles and Plaza Tables shall be furnished and installed by Contractor per manufacturer's recommendations oras shown in the plans. B. Page 32 2000 -2, subparagraph 3.01, D, delete this subparagraph in its entirety. C. Page 32 2000 -2, subparagraph 3.01, add Item 1= as follows: F. Scorer's Platform: Scorer's Platform shall be (3) Elevated 8'x5' Platforms with Canopy and Video Platform as manufactured by Seating Solutions (631) 845 -0449, www.seatingsolutions.com, or approved equal. ADDENDUM NO. ONE 4972 1 4H -15 ADDENDUM NO. TWO ADDENDUM NUMBER TWO NORTH PARK CITY OF SOUTHLAKE, TEXAS ISSUED BY: Schrickel, Rollins and Associates, Inc. 1. This addendum modifies and extends the requirements of the plans and/or the project manual for the above referenced project, dated December 2010. 2. Staple these addenda to the inside of the rear cover of the project manual or bind it into the project manual at the end of the Bid Form. 3. Note receipt of all addenda on the Bid Form. PROJECT MANUAL ISSUE DATE: January 14, 2011 BID DATE: January 19, 2011 2.00 ADDENDUM NO. 1 (to be modified as follows:) A. Pagel, Article 1.00, (LEGAL NOTICE — ADVERTISEMENT FOR BIDS)- Change the Bid Opening to Wednesday, January 19, 2011 at 10 a.m. B. Pagel, Article 1,01, (SECTION 012300 —ALTERNATES) —paragraph A, Change items as follows: 3.01 SCHEDULE OF ALTERNATES A. Deductive Alternate: Delete the Flowtronex pump station and water well with its level sensor. Additionally the 2" "back up" water meter shall be replaced with a 4" water meter and D.C.A. serving all irrigation and lake fill. A 2" master valve and flow meter shall be provided for automatic lake level maintenance. A modified irrigation mainlinellake fill drawing will be provided by the Landscape Architect if Alternate is accepted. (Reference 00 3000- Bid Form) B. Deductive Alternate: Replace Detectable Warning Plate by East Jordan Iron Works with truncated dome pavers by Pavestone Company (817) 481 -5802, or approved equal. (Reference 00 3000- Bid Form) C. Additive Alternate: Add standing seam metal roof at con cessionlrestroomltower building in lieu of asphalt shingle. (Reference 00 3000 - Bid Form) D. Additive Alternate: Add future sidewalk as indicated on construction layout sheets. (Reference 00 3000 - Bid Form) E. Additive Alternate: Add 12' -0" wide GrassPave2, or approved equal, per manufacturer's recommendation in lieu of (2) 4' wide sidewalks. (Reference 00 3000- Bid Form) C. Pagel, Article 1. Pagel, Article 1.02, (SECTION 22 1000- PLUMBING) -paragraph A, Change items as follows: 1. Trap Primer shall be Proset TrapGuard, Quad Close, or SureSeal and must be approved by the most recent International Building Code." D. Page 1, Article 1.04, (SECTION 32 2000 MISCELLANEOUS OUTDOOR EQUIPMENT) — paragraph C, Change subparagraph 3.01 INSTALLATION, Item F to subparagraph 2.01 EQUIPEMENT Item I. as follows: "Scorer's Platform shall be (1) Elevated 8'x5'x4' elevation with two stairs, modesty panel, and nameplate as manufactured by Seating Solutions (631) 845 -0449, www.seatingsolutions.com or ADDENDUM NO. TWO 4972 1 4H -16 North Park Bid Opening - January 20, 2011 Southlake Town Hall Southla.ke, Texas Exhibit "C" Rid Items Description Contractors Add. #.1 Add.4:2. Amount No. 1 Erosion Control Merritt Professional $9,000.00 No. 2 Tree Protection Dean Construction $4,150.00 No. 3 Demo & Tree Remova I & Earthwork Kart Construction $160;85.0:00 No. 4 .Utilities Tri Dal $490,91100 No. 5 Pond Wall & Outfall Structure Mike Al6ort $104,200.00 No. 6 Entry Drive / Parking Miller Sierra $291,9,50;00 No.. 7 Parking Lot Striping ,& Signage Strip =A- Zone. $'5,133:00 No. 8 Site Concrete Dean Construction $551,718.00 No. 8A Det. Warning Plate /True. Pavers Dean Construction $O;OQ No. 813 Grass Paue2 Super.Scape. $2,50000 No.9 Future': Sidewalk N/A N/A No 10 Bleacher Seating. Southem Bleachers $12;200;00 No. 11 Bleacher Shade Structure Dean Construction $140,500.00 No. 12 Building JU & Sons. $99.9,000.00 No. 12A Delete Shingle Roof (metal replace) JU & Sons $11;900;00 No. 13 Site Electrical Nema 3 $845536O.Q No: 14 Alternate Electrical N/A N/A No. 15 Irrigation System Super Scape $245,000.00 No:16 Alternate Irrigation N/A N/A No. 17 Landscape Dal Pro $228;965.00 No. 18 Drainage; Waterproofing,& Backfill.of Planter Dean Construction $25,200.00 No. 19 MasonXry JU &Sons: .$284;900:00 No. 20 Fencingand Netting. Dean Construction $295i73840 No. 21 TRW Wall TRW $1 °89 No. 21A Ledge Stone Compression Column N/A N/A No. 22 Site Furnishings Dean Construction $105,075,00 No. 23 Dumpster Enclosure JLJ &Sons $23 No. 24 Entry Sign JU & Sons: $42,900.00 No. .25 Aerator Fountain Dean Construction .$9500.00 No: 26 Water Well Earth Tech $125;OOD.00 No. 27 Tuff Establishment Dal Pro $109;066:00 No. 28 Fine Grade - Grade. Maintenance Dean Construction $85;00D.00 Sub Total $5,398,904.00 Credit 01 Column Foundations By TRW - $13;20D.00 Credit Split Rail Fence Columns By TRW - $11;115.00 Additional Bond For Subcontractor $21,269.00 Sub Total $5,395;858.:00 Allowances $599,000.00 Sub Total $5,994,858.00 Fee 10.625% $636,953.66 Total $6,631,811.66 Exhibit "B" North Park Allowance 1. Tree Pruning $10,000.00 2. Electric company $64,000.00 3. Telephone riser relocation $10,000.00 4. Signage $30,000.00 5. Playground $130,000.00 6. Appliance $10,000.00 7. One year maintenance $20,000.00 8. Soil amendments $50,000.00 9. Impact fees $20,000.00 10. Contingency $200,000.00 11. Art Allowance $55,000.00 4H -17 Total $599,000.00 North Park Break Down on DPS and Parks Department Southlake, Texas 20- Jan -11 Number Description Net Cost DPS Cost DPS % Parks Cost Parks % No. 1 Entry Drive and Deceleration lane $96,065.00 $48,032.50 50% $48,032.50 577 No. 2 Sidewalk @ Dove 5t. $21,058.00 $21,058.00 100% $0.00 0% No. 3 Drainage Improvements $352,174.50 $281,739.60 80% $70,434.90 20% No. 4 Outfall / Lake Wall $104,200.00 $83,360.00 80% $20,840.00 20% No. 5 Pond Excavation $24,800.00 $19,840.00 80% $4,960.00 20% No. 6 Clay Liner ICA $9,570.00 $7,656.00 80% $1,914.00 20% No. 7 Sheets Grading $6,500.00 $6,500.00 100% $0.00 0% Total 1 $614,367.50® $468,186.10 $146,181.40 Fee 10.625 %1 $65,276.55 ® $49,744.77 $15,531.77 Total Costj $679,644.05 ® $517,930.87 $161,713.17 41 x