Loading...
Item 6F Northeast Tarrant Pipeline Southlake, Texas Southlake Pipeline Facts Carbon Steel Pipe 6.625-inch diameter with.280-inch wall thickness minimum Length of Pipe 6” - 2 Miles Route Construction –Horizontal Directional Drill (HDD) and Trenching Pipeline Ground Cover: HDD: approximately 10 -15 foot depth Other areas: minimum 4 foot depth Low-pressure pipeline with a N.O.P. of 330 psi Pipeline Information Hotline:1-866-826-2081 HDD Installation Process First Step – Drill Pilot Hole Second Step – Enlarge Hole (Ream) Third Step – Pull Back (Install Pipe) Pipeline Information Hotline:1-866-826-2081 Because safety is our top priority, we will … Design and construct the pipeline to Department of Transportation regulations; Install high-strength carbon steel pipe; X-ray every weld that joins each section of pipe; Bury the pipeline with adequate ground cover and identify with aboveground markers; Participate in the One Call System Hydrostatically test each section of pipeline at much higher pressures than the proposed operating pressure of the pipeline before putting it into service; Test pressure will reach 5 times the Normal Operating Pressure Use valves to allow sections of the pipeline to be isolated for maintenance or repair if necessary; Employ only experienced and qualified construction contractors and inspection personnel to perform and monitor all stages of construction. Department of Transportation statistics demonstrate that pipelines are by far the safest form of energy transportation. SAFETY Pipeline Information Hotline:1-866-826-2081 SAFETY Pipeline Information Hotline: 1-866-826-2081 6” Pipeline Route Pipeline Information Hotline:1-866-826-2081 Thank You Pipeline Information Hotline: 1-866-826-2081