Loading...
Item 4DItem 4D Approve an Interlocal Agreement for the FM 1938 Phase ll Roadway Expansion Project with the City of Keller Requested Action Approve an Interlocal Agreement for the FM 1938 Phase ll Roadway Expansion Project with the City of Keller Location Map – FM1938 Project FM1938 – Phase 1 FM1938 - Phase 2 Background FM1938 Phase II joint project between the City of Southlake, Keller, Tarrant County, TxDOT and the Regional Transportation Council (NCTCOG – RTC) Southlake, Keller and Tarrant County responsible for providing engineering design services and right-of-way to TxDOT for the FM1938 project FM1938 Phase I Construction is currently underway within the Town of Westlake FM1938 Phase II 4 lane roadway southward from the Randol Mill Bend transition to a 6 lane roadway at Johnson Road includes improvements to the intersection at Southlake Blvd. (FM1709) Approve Interlocal Agreement with the City of Keller The costs for the design contract for engineering services is as follows: Current Design Contract $1,498,107.13 Tarrant County Participation $451,449.00 Total $1,046,658.13 Southlake – 78.7%* $823,719.95 Keller – 21.3%* $222,938.18 *based on % of frontage on roadway Approve Interlocal Agreement with the City of Keller Questions? Bob Price (817) 748-8097