Item 4DItem 4D
Approve an Interlocal Agreement for the FM 1938 Phase ll Roadway Expansion Project with the City of Keller
Requested Action
Approve an Interlocal Agreement for the FM 1938 Phase ll Roadway Expansion Project with the City of Keller
Location Map – FM1938 Project
FM1938 – Phase 1
FM1938 -
Phase 2
Background
FM1938 Phase II
joint project between the City of Southlake, Keller, Tarrant County, TxDOT and the Regional Transportation Council (NCTCOG – RTC)
Southlake, Keller and Tarrant County
responsible for providing engineering design services and right-of-way to TxDOT for the FM1938 project
FM1938 Phase I
Construction is currently underway within the Town of Westlake
FM1938 Phase II
4 lane roadway southward from the Randol Mill Bend
transition to a 6 lane roadway at Johnson Road
includes improvements to the intersection at Southlake Blvd. (FM1709)
Approve Interlocal Agreementwith the City of Keller
The costs for the design contract for engineering services is as follows:
Current Design Contract $1,498,107.13
Tarrant County Participation $451,449.00
Total $1,046,658.13
Southlake – 78.7%* $823,719.95
Keller – 21.3%* $222,938.18
*based on % of frontage on roadway
Approve Interlocal Agreementwith the City of Keller
Questions?Bob Price(817) 748-8097