Loading...
WS Item 3 FM-1938 Phase II Southlake Boulevard to Randol Mill Bend Southlake, Texas Purpose/Outcome (PDS) Strategic Alignment/Policy Basis for the Landscape Project (PDS) FM 1938 Project Overview (TranSystems) Conceptual Landscape Design (Thompson Landscape Architects) Landscape Construction Costs (CS) Maintenance Costs (CS) Funding (CS) Next Steps (PW) Presentation Outline Purpose Review and approve the Conceptual Landscape and Amenity Plan for FM 1938 – Phase II and allow staff to move forward with the development of the detailed landscaping plan. Funding Mechanism Policy Basis for the Project Overview of FM 1938 Project FM 1938 Phase 1 Phase 2 Typical Section Conceptual Landscape Design Urban Design Plan Conceptual Landscape Design Urban Design Plan Conceptual Landscape Design Urban Design Plan Conceptual Landscape Design Conceptual Landscape Design Conceptual Landscape Design Conceptual Landscape Design Urban Design Plan Conceptual Landscape Design Landscaping Costs Cost Estimates LS Construction Cost = $1,809,050 Landscape $1,350,550 Irrigation $ 458,500 Annual Maintenance Cost = $75,013 LS Funding Alternatives Future Capital Improvement Plan budgets: General Fund (CIP) Strategic Initiative Fund Next Steps Guidance from the Council on Conceptual Design Contract Approval for Landscape Plan Development Fund Landscape Construction (future CIPs) Questions City Limit Locations Florence Gifford Ct. Kingswood Dr. Beam Dr. Fawkes Ln. Randol Mill Rd. Palomar Trl. Wildwood Way Brookforest Dr. Kingswood Dr. City Limits City of Keller City of Southlake City of Keller City of Southlake City Limits Southlake Blvd (FM 1709) Davis Blvd (FM 1938) Approx. 4,100’ (0.80 mi.) COST REDUCTION OPTIONS OPTION REDUCTION REDUCE PLANTING BEDS BY 50% $ 54,300 or REDUCE PLANTING BEDS BY 80% $ 86,800 ELIMINATE AMENITY POCKETS $ 60,000 ELIMINATE TOWER AND LIGHTING $ 50,000 ELIMINATE IDENTITY MONUMENTS/LIGHTING $ 68,000 REDUCE CANOPY TREES BY 20% $ 67,500 REDUCE ORNAMENTAL TREES BY 20% $ 21,400 PLANT PALETTE LOW EVERGREEN Creeping Rosemary Daylily Asian Jasmine Harbor Dwarf Nandina TALL EVERGREEN Knock Out Rose Encore Azalea Dwarf Wax Myrtle Lorapetalum Holly CANOPY TREE Live Oak Texas Red Oak Sawtooth Oak Cedar Elm MEDIUM EVERGREEN Drift Rose Compact Nandina Dwarf Yaupon Otto Luyken Laurel ORNAMENTAL TREE Savannah Holly Shantung Maple Vitex Crape Myrtle LOW PERENNIAL Ruellia Penstemon Cone Flower Salvia Rudbeckia TALL DECIDUOUS Spiraea Dwarf Burning Bush Butterfly Bush Forsythia Lacebark Elm Texas Ash Sweetgum Return Identity Monument Options Corner Planting and Identity Monuments Tower and Identity Monument Options Median Planting Options Amenity Pocket Examples Sections thru Parkway Sections thru Parkway Unit Price Quantity Total LANDSCAPE Canopy Trees $700/ea 482 $337,400 Ornamental Trees $400/ea 267 $106,800 Shrubs, Groundcover and Perennials $3.50/sf 26,800sf $ 93,800 Planting Bed Excavation $0.50/sf 26,800sf $ 13,400 Planting Bed Preparation $1.50/sf 26,800sf $ 40,200 Mulch Beds w/ Weed Barrier $1.35/sf 92,000sf $124,200 Sod Bed Preparation $1.00/sf 315,000sf $315,000 Sod $0.45/sf 315,000 $141,750 Amenity Pockets $30,000 2 $ 60,000 Tower $45,000 1 $ 45,000 Electrical/lighting at Tower $5,000 1 $ 5,000 Identity Monuments $12,000/4 4 $ 48,000 Electrical/lighting at Monuments $5,000/4 4 $ 20,000 SUBTOTAL $1,350,550 IRRIGATION Canopy Trees $100/ea 482 $ 48,200 Ornamental Trees $100/ea 267 $ 26,700 Planting Beds $0.75/sf 26,800sf $ 20,100 Sod $0.90/sf 315,000sf $283,500 Controllers, taps, etc. LS 1 $ 80,000 SUBTOTAL $458,500 TOTAL $1,809,050 Cost Estimate Return